Find a Carpenter you can trust in Fivemiletown.
Choose from 15 Carpenters, all rated by people like you.
Over 1 reviews & an average rating of 5/5 stars, you'll find the right pro
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Carpenters near you
Precision Roofing & Building Contracts
Commercial Flooring Contractors NI
WMK Plastering
How much do Carpenter services cost?
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceThe average price
of a Carpenter in Fivemiletown is:
£879
Carpenter job | Carpenter cost in 2024 |
---|---|
Kitchen Fitting in Fivemiletown | £975-£2,495 |
Carpenters and joiners in Fivemiletown | £375-£575 |
Plasterboard dry lining in Fivemiletown | £638-£978 |
Wood flooring in Fivemiletown | £750-£1,150 |
Wooden decking in Fivemiletown | £1,125-£1,725 |
Garden shed in Fivemiletown | £450-£690 |
Wooden window repair in Fivemiletown | £320-£480 |
Carpenter FAQs
Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.
- How to build a shed base out of paving slabs
- Mix sand and cement together to make mortar or use a pre-mixed one
- Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
- Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
- Next lay slabs along the two adjacent outer edges, filling in the central area row by row
- Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
- Building a shed base from concrete
- Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
- Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
- Wet the sub-base using a watering can with a rose on the end
- Pour the concrete onto the framed base starting in one corner
- Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
- Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
- Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
- Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
- Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
- Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
- Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
The cost of just the engineered wood flooringis from £18 to £73 per m2.
Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.
- Tongue and groove timber boards
- Boards for the ledges and braces, at least 20mm thick
- Nails
- Hammer
- Saws, including a circular saw
- Chisel
- Mallet
- Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
- Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
- Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
- Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
- Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
- Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
- Add a central step riser to stairs wider than 900mm to prevent them buckling
- Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
- Step treads (the actual step themselves)
- Step risers
- Coach screws
- Deck screws
- Saw
- Drill
- Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
- Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
- Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
- After drilling pilot holes, screw the treads into the risers at each end with deck screws.
- If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
Carpenter help and advice
How it works
Tell us about your Carpenter project
Answer a few quick questions to help us match you with the right Carpenter
Get up to 4 free quotes
Receive no-obligation quotes from 4 Carpenters working in Fivemiletown.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Carpenter.
Are you a Carpenter in Fivemiletown?
View our open Carpenter jobs near you
Join today