Kitchen | Fitting
Dungannon - BT70
Enquiry from: Helen N
Start Date: Immediate
Assembly and fit of b&q kitchen
-->
Over 1 reviews & an average rating of 5/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Dungannon - BT70
Enquiry from: Helen N
Start Date: Immediate
Assembly and fit of b&q kitchen
Dungannon - BT71
Enquiry from: Mc M
Start Date: Immediate
Garden maintenance and decking
Dungannon - BT71
Enquiry from: Kevin M
Start Date: Immediate
Grass cut Garden and shed clear Fence and gate on gable
Dungannon - BT71
Enquiry from: Tanya D
Start Date: Immediate
Kitchen renovation Tiles doors
Dungannon - BT71
Enquiry from: Carol L
Start Date: Immediate
8×8 wooden garden shed
Dungannon - BT71
Enquiry from: T
Start Date: Immediate
We would like to install a sound proof glass partition approx 26ft x 12ft
Dungannon - BT71
Enquiry from: Mary G
Start Date: Immediate
To fit laminate flooring and skirting in a living room at the moment Are you the property owner: Tenant (with permission) Property Type: Semi detached What level of service do you require: Fit only...
Clogher - BT76
Enquiry from: Michael H
Start Date: Immediate
garden shed base please and thank you are you the property owner: owner of the property what level of service are you looking for: supply, install, removal of old do you have a: small garden please ...
Armagh - BT61
Enquiry from: Gary W
Start Date: Less than one month
existing cupboards replaced are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: furniture fitting do you require a door(s): n...
Clogher - BT76
Enquiry from: Patrick M
Start Date: Immediate
I want all cupboard doors and draws replaced and fitted and a worktop fitted
Armagh - BT61
Enquiry from: Joan S
Start Date: Immediate
general maintenance weeding edging help cleaning and maintenance of equipment organisation of garden garage and sheds are you the property owner: owner of the property what level of service are you lo...
Armagh - BT61
Enquiry from: Catherine Q
Start Date: Immediate
i need a galvanised garden shed (grey( 2m wide by 3m long, i will get a concrete base fitted and need a quote including fitting thank you are you the property owner: owner of the property do you have...
Omagh - BT79
Enquiry from: David C
Start Date: Immediate
Metal shead
Armagh - BT61
Enquiry from: Martyn W
Start Date: Less than one month
1. Dado-rail fitting 2. Laminate-flooring
Armagh - BT61
Enquiry from: Neil C
Start Date: Immediate
Supply and install a 24'x24' steel insulated shed/workshop (including concrete base) with 1x window, 1x standard door, 1x roller shutter door all on front elevation.
Armagh - BT61
Enquiry from: Catherine S
Start Date: Immediate
Hang 6 single doors and 1 double.
Omagh - BT79
Enquiry from: Marian T
Start Date: Less than one month
Are you the property owner: Owner Property Type: Detached Other Forms: 10085 Agreed to recieve quotes for selected products: Yes Please call to appoint
Armagh - BT61
Enquiry from: T
Start Date: Immediate
Uneven two level garden which I would like decked the whole way across, plus steps fixed. Size apprx half a size of a football pitch, maybe less. Lots of rubble in garden. A project started but never...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2024 |
---|---|
Kitchen Fitting in Dungannon | £975-£2,495 |
Carpenters and joiners in Dungannon | £375-£575 |
Plasterboard dry lining in Dungannon | £638-£978 |
Wood flooring in Dungannon | £750-£1,150 |
Wooden decking in Dungannon | £1,125-£1,725 |
Garden shed in Dungannon | £450-£690 |
Wooden window repair in Dungannon | £320-£480 |
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
The cost of just the engineered wood flooringis from £18 to £73 per m2.
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Dungannon.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today