Find a Carpenter you can trust in Trimdon Station.

Choose from 59 Carpenters, all rated by people like you.

Over 55 reviews & an average rating of 4.8/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Haus 12 Interior

0 review(s)
Offers services in TRIMDON STATION
Haus 12 Interiors is in the kitchen business for over 25 years, you could say that we know a thing or two about designing ...
Verified Pro

Morespace conversions NE

0 review(s)
Offers services in TRIMDON STATION
Been in the building trade for nearly 30 years there isn't much I haven't done in the building trade. Got all the trades ...
Verified Pro

LNB Services

0 review(s)
Offers services in TRIMDON STATION
Painting and decorating partnership, covering all aspects of decorating, interior and exterior work carried out..we also d...

Recent Carpenter Enquiries

25 May

Garden | Sheds

Trimdon Station - TS29

Enquiry from: Andrea T

Start Date: Immediate

customer made an online enquiry for garden shed and confirmed on telephone and email they would like a call with a carpenter to discuss prices.please call to arrange an appointment to quote. are you t...

Post a similar request >

18 Oct

Kitchen | Fitting

Middlesbrough - TS3

Enquiry from: Charisse H

Start Date: Immediate

looking to fit a kitchen

Post a similar request >

18 Oct

Carpentry

Middlesbrough - TS3

Enquiry from: Charisse H

Start Date: Immediate

Skirting boards and architrave, and laminate flooring. Also to fit a kitchen

Post a similar request >

03 Jun

Carpentry

Middlesbrough - TS5

Enquiry from: Les R

Start Date: Immediate

Can you give me a call please

Post a similar request >

30 Dec

Kitchen | Fitting

Darlington - DL3

Enquiry from: Lisa C

Start Date: Immediate

customer made an enquiry for kitchen design & installation and confirmed on the quotatis site they would like quotes from a kitchen installer.ms lives in the darlington area and would like a call to d...

Post a similar request >

01 Apr

Carpentry

Darlington - DL1

Enquiry from: Ray S

Start Date: Immediate

I'm not sure if you cover Darlington. I'm looking for a quote to replace the stair banisters with wooden ones.

Post a similar request >

20 Jan

Carpentry

Middlesbrough - TS6

Enquiry from: Michael R

Start Date: Immediate

Supply and fit replacement bathroom door

Post a similar request >

06 Oct

Carpentry

Darlington - DL2

Enquiry from: Alex D

Start Date: Less than one month

2 doors to be hung via carpenter or handyman are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors what leve...

Post a similar request >

16 Aug

Garden | Sheds

Darlington - DL3

Enquiry from: Christopher D

Start Date: Immediate

removal of dismantl*** x 5ft garden shed are you the property owner: relative of owner do you have a: small garden what level of service are you looking for: removal of old please call to appoint

Post a similar request >

30 Apr

Carpentry

Darlington - DL1

Enquiry from: Ken J

Start Date: Immediate

Wooden window repair Lead

i am disabled and need my doors measured for me. i require 5 x 6 panel pre painted doors including furniture fitted as soon as possible. i would also like the old doors removed. are you the property o...

Post a similar request >

08 Mar

Kitchen | Fitting

Billingham - TS23

Enquiry from: Louis H

Start Date: Immediate

flat pack kitchen units assembled and installed are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials for your...

Post a similar request >

04 Jan

Garden | Decking

Darlington - DL1

Enquiry from: Alwyn J

Start Date: Immediate

remove old decking boards and refit new boards approx 24 sqmtr are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck ple...

Post a similar request >

26 Nov

Carpentry

Darlington - DL1

Enquiry from: Julie D

Start Date: Immediate

internal doors to repair are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: wooden window/doors do you require a door(s): none how ...

Post a similar request >

24 Nov

Interior work | Stud Walls

Middlesbrough - TS2

Enquiry from: Billy A

Start Date: Immediate

Wooden window repair Lead

High level 100mm metal stood partition wall with sound insulation and fire bonded boards either side. This is to be built on a first floor office which has a concrete mezzanine up to ceiling of a work...

Post a similar request >

09 Oct

Garden | Sheds

Middlesbrough - TS4

Enquiry from: Martin D

Start Date: Immediate

make base for 7*5 wooden shed & assemble the shed all the materials for base provided are you the property owner: owner of the property what level of service are you looking for: install do you have ...

Post a similar request >

18 Sep

Garden | Sheds

Stockton-on-tees - TS19

Enquiry from: Scott S

Start Date: Immediate

build a shed, it’s all in separate pieces and i have the black plastic base also are you the property owner: tenant (with permission) do you have a: large garden what level of service are you lookin...

Post a similar request >

19 Jul

Garden | Decking

Darlington - DL3

Enquiry from: Christina R

Start Date: Immediate

approx 5 x 8m of decking in back yard, with steps down to lower garden and a banister on the lower (5m) end. currently concrete. slight slope. some drains/sewer access to be considered. would appr...

Post a similar request >

04 Jul

Garden | Decking

Darlington - DL3

Enquiry from: Steph J

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: semi detached work description: redesign of my back garden are you the property owner: owner of the property...

Post a similar request >

17 May

Garden | Decking

Darlington - DL2

Enquiry from: Brian H

Start Date: Immediate

4metre x 1.2 metre decking extension are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to appoint

Post a similar request >

10 May

Garden | Sheds

Middlesbrough - TS5

Enquiry from: Kelly L

Start Date: Immediate

wanting some prices on a 4x4 wooden shed with base please are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: supply, install...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Trimdon Station is:

£879

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Trimdon Station £975-£2,495
Carpenters and joiners in Trimdon Station £375-£575
Plasterboard dry lining in Trimdon Station £638-£978
Wood flooring in Trimdon Station £750-£1,150
Wooden decking in Trimdon Station £1,125-£1,725
Garden shed in Trimdon Station £450-£690
Wooden window repair in Trimdon Station £320-£480

Related Carpenter searches in Trimdon Station

Carpenter FAQs

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Trimdon Station.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Trimdon Station?

View our open Carpenter jobs near you

Join today
View Shortlist