Find a Carpenter you can trust in Spennymoor.

Choose from 69 Carpenters, all rated by people like you.

Over 95 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Yorkshire Soundproofing

0 review(s)
Offers services in SPENNYMOOR
Understanding how soundproofing works can be a bit of a minefield but we are happy to explain how the dB scale works and w...
Verified Pro

Pro lay

0 review(s)
Offers services in SPENNYMOOR
Professional and friendly service in tree topping and removal roofing fencing’s and driveways patio basic general home mai...
Verified Pro

Haus 12 Interior

0 review(s)
Offers services in SPENNYMOOR
Haus 12 Interiors is in the kitchen business for over 25 years, you could say that we know a thing or two about designing ...
Verified Pro

Morespace conversions NE

0 review(s)
Offers services in SPENNYMOOR
Been in the building trade for nearly 30 years there isn't much I haven't done in the building trade. Got all the trades ...
Verified Pro

LNB Services

0 review(s)
Offers services in SPENNYMOOR
Painting and decorating partnership, covering all aspects of decorating, interior and exterior work carried out..we also d...

Recent Carpenter Enquiries

10 Nov

Carpentry

Spennymoor - DL16

Enquiry from: Vanessa I

Start Date: Immediate

Wooden window repair Lead

I need a quote for inspecting and repair if necessary a sloping floor in the bathroom, this appears to be due to bath and the weight of the bath when full of water. I need a joinery/carpenter contr...

Post a similar request >

25 May

Garden | Sheds

Spennymoor - DL16

Enquiry from: Robert T

Start Date: Immediate

New shed to be fitted and I would like to put greenhouse along side which will be 10ft. Depends on cost.

Post a similar request >

01 Mar

Garden | Decking

Spennymoor - DL16

Enquiry from: Joy S

Start Date: Immediate

12 square metres of decking replaced.

Post a similar request >

10 Jan

Garden | Sheds

Spennymoor - DL16

Enquiry from: Susan H

Start Date: Immediate

Customer visited the myroofingquotes.co.uk site and submitted an enquiry. Property type: Other, Roof type: Flat, Work description: Shed roof replace or repair

Post a similar request >

22 Apr

Garden | Decking

Spennymoor - DL16

Enquiry from: David L

Start Date: Immediate

Supply only. I am going to fit the decking myself, I am after a price for the boards Homeowner Please contact to quote

Post a similar request >

11 Oct

Carpentry

Hartlepool - TS26

Enquiry from: June Q

Start Date: Immediate

i have 5 oak doors that will not close due to swelling

Post a similar request >

21 Jun

Garden | Sheds

Bishop Auckland - DL14

Enquiry from: Marc D

Start Date: Immediate

I've bought a *** plastic shed, I would like a base laying for it and the shed assembling on it too if possible. I would also like some rabbit proofing done around my fences and gate.

Post a similar request >

30 Dec

Kitchen | Fitting

Darlington - DL3

Enquiry from: Lisa C

Start Date: Immediate

customer made an enquiry for kitchen design & installation and confirmed on the quotatis site they would like quotes from a kitchen installer.ms lives in the darlington area and would like a call to d...

Post a similar request >

01 Apr

Carpentry

Darlington - DL1

Enquiry from: Ray S

Start Date: Immediate

I'm not sure if you cover Darlington. I'm looking for a quote to replace the stair banisters with wooden ones.

Post a similar request >

30 Nov

Garden | Sheds

Hartlepool - TS26

Enquiry from: Brian H

Start Date: Immediate

complete garden clearance to front and back of property, including removal of several conifer type trees ivy and thorny rose type bushes. also removal of old dying small garden shed, border bricks and...

Post a similar request >

06 Oct

Carpentry

Darlington - DL2

Enquiry from: Alex D

Start Date: Less than one month

2 doors to be hung via carpenter or handyman are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors what leve...

Post a similar request >

06 Oct

Carpentry

Bishop Auckland - DL14

Enquiry from: Mark S

Start Date: Immediate

second hand french doors need fitting asap to garden room / mancave. are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: other do yo...

Post a similar request >

24 Aug

Kitchen | Fitting

Shildon - DL4

Enquiry from: Ray E

Start Date: Immediate

full kitchen fitout. 1st fix plumbing & electrics done. see attached pdf.

Post a similar request >

16 Aug

Garden | Sheds

Darlington - DL3

Enquiry from: Christopher D

Start Date: Immediate

removal of dismantl*** x 5ft garden shed are you the property owner: relative of owner do you have a: small garden what level of service are you looking for: removal of old please call to appoint

Post a similar request >

30 Apr

Carpentry

Darlington - DL1

Enquiry from: Ken J

Start Date: Immediate

Wooden window repair Lead

i am disabled and need my doors measured for me. i require 5 x 6 panel pre painted doors including furniture fitted as soon as possible. i would also like the old doors removed. are you the property o...

Post a similar request >

08 Mar

Kitchen | Fitting

Billingham - TS23

Enquiry from: Louis H

Start Date: Immediate

flat pack kitchen units assembled and installed are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials for your...

Post a similar request >

04 Jan

Garden | Decking

Darlington - DL1

Enquiry from: Alwyn J

Start Date: Immediate

remove old decking boards and refit new boards approx 24 sqmtr are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck ple...

Post a similar request >

26 Nov

Carpentry

Darlington - DL1

Enquiry from: Julie D

Start Date: Immediate

internal doors to repair are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: wooden window/doors do you require a door(s): none how ...

Post a similar request >

22 Nov

Garden | Decking

Ferryhill - DL17

Enquiry from: Taylor M

Start Date: Immediate

decking around our school pond are you the property owner: tenant (with permission) property type: commercial what level of service do you require: supply and deck please call to appoint

Post a similar request >

18 Sep

Garden | Sheds

Stockton-on-tees - TS19

Enquiry from: Scott S

Start Date: Immediate

build a shed, it’s all in separate pieces and i have the black plastic base also are you the property owner: tenant (with permission) do you have a: large garden what level of service are you lookin...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Spennymoor is:

£879

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Spennymoor £975-£2,495
Carpenters and joiners in Spennymoor £375-£575
Plasterboard dry lining in Spennymoor £638-£978
Wood flooring in Spennymoor £750-£1,150
Wooden decking in Spennymoor £1,125-£1,725
Garden shed in Spennymoor £450-£690
Wooden window repair in Spennymoor £320-£480

Related Carpenter searches in Spennymoor

Carpenter FAQs

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
Does my garden shed need a base?

Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Spennymoor.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Spennymoor?

View our open Carpenter jobs near you

Join today
View Shortlist