Find a Carpenter you can trust in Peterlee.

Choose from 58 Carpenters, all rated by people like you.

Over 62 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Haus 12 Interior

0 review(s)
Offers services in PETERLEE
Haus 12 Interiors is in the kitchen business for over 25 years, you could say that we know a thing or two about designing ...
Verified Pro

Morespace conversions NE

0 review(s)
Offers services in PETERLEE
Been in the building trade for nearly 30 years there isn't much I haven't done in the building trade. Got all the trades ...
Verified Pro

LNB Services

0 review(s)
Offers services in PETERLEE
Painting and decorating partnership, covering all aspects of decorating, interior and exterior work carried out..we also d...

Recent Carpenter Enquiries

31 May

Carpentry

Peterlee - SR8

Enquiry from: Kathryn R

Start Date: Less than one month

renovation of banisters and balustrades on stairs, new doorway created for under stairs space are you the property owner: owner of the property property type: semi detached what type of job are you lo...

Post a similar request >

02 Jul

Garden | Decking

Peterlee - SR8

Enquiry from: Gayle A

Start Date: Immediate

need advice on what to do ? are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call to appoint

Post a similar request >

17 Jun

Garden | Decking

Peterlee - SR8

Enquiry from: Susan W

Start Date: Immediate

had decking done late last year. quite a drop to garden so deep . 18' x 9' with 1' height between wall and path, back garden. work looked good but insufficient support structure. decking bends. thin...

Post a similar request >

05 Jun

Garden | Sheds

Peterlee - SR8

Enquiry from: Peter H

Start Date: Immediate

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for garden shed. they are unsure of options so would like to discuss with a carpenter.confirmed...

Post a similar request >

04 Sep

Garden | Sheds

Peterlee - SR8

Enquiry from: John S

Start Date: Immediate

erect 7x5 pent wood shed in garden time scale: immediate please call to appoint

Post a similar request >

03 Sep

Garden | Sheds

Peterlee - SR8

Enquiry from: John M

Start Date: Less than one month

moving shed from next door and erect in my garden 8 x 6 time scale: less than one month time scale: immediate please call to appoint

Post a similar request >

07 May

Garden | Sheds

Peterlee - SR8

Enquiry from: Rosemary W

Start Date: Immediate

6x4 metal shed. a door on *** side, strong and lockable. are you the property owner: relative of owner do you have a: small garden what level of service are you looking for: supply, install other for...

Post a similar request >

16 Oct

Windows | Wooden | Repair

Peterlee - SR8

Enquiry from: Sandra G

Start Date: Immediate

wanting white or wood effect plastic window sill covers for 4 windows .we live in a miners bungalow in horden .1 of the window sills is not very long .just wanting to know if u can give me a quote tha...

Post a similar request >

19 Feb

Carpentry

Peterlee - SR8

Enquiry from: Malcolm C

Start Date: Immediate

length of 5ft fence approx. 5 mtre with wooden gate Please contact to appoint

Post a similar request >

11 Oct

Carpentry

Hartlepool - TS26

Enquiry from: June Q

Start Date: Immediate

i have 5 oak doors that will not close due to swelling

Post a similar request >

10 Nov

Carpentry

Spennymoor - DL16

Enquiry from: Vanessa I

Start Date: Immediate

Wooden window repair Lead

I need a quote for inspecting and repair if necessary a sloping floor in the bathroom, this appears to be due to bath and the weight of the bath when full of water. I need a joinery/carpenter contr...

Post a similar request >

12 Oct

Garden | Decking

Hartlepool - TS24

Enquiry from: Peter H

Start Date: Immediate

Area to be decked at present it’s lawn

Post a similar request >

08 May

Garden | Decking

Hartlepool - TS24

Enquiry from: Susan K

Start Date: Immediate

rear garden re-design and landscaping are you the property owner: owner of the property property type: detached roughly the size of your garden: unsure garden type: back garden do you have a design: ...

Post a similar request >

30 Nov

Garden | Sheds

Hartlepool - TS26

Enquiry from: Brian H

Start Date: Immediate

complete garden clearance to front and back of property, including removal of several conifer type trees ivy and thorny rose type bushes. also removal of old dying small garden shed, border bricks and...

Post a similar request >

25 May

Garden | Sheds

Spennymoor - DL16

Enquiry from: Robert T

Start Date: Immediate

New shed to be fitted and I would like to put greenhouse along side which will be 10ft. Depends on cost.

Post a similar request >

04 May

Garden | Decking

Hartlepool - TS25

Enquiry from: Lawrence L

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

removal of existing decking,and joists. reinstall new decking are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck plea...

Post a similar request >

08 Mar

Kitchen | Fitting

Billingham - TS23

Enquiry from: Louis H

Start Date: Immediate

flat pack kitchen units assembled and installed are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials for your...

Post a similar request >

07 Mar

Carpentry

Hartlepool - TS24

Enquiry from: Darren O

Start Date: Less than one month

Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead

we have a care home in hartlepool, this was badly damaged during the storms in december. a section of roofing was blown off during the storm causing massive water ingress throughout top and middle flo...

Post a similar request >

24 Nov

Interior work | Stud Walls

Middlesbrough - TS2

Enquiry from: Billy A

Start Date: Immediate

High level 100mm metal stood partition wall with sound insulation and fire bonded boards either side. This is to be built on a first floor office which has a concrete mezzanine up to ceiling of a work...

Post a similar request >

22 Nov

Garden | Decking

Ferryhill - DL17

Enquiry from: Taylor M

Start Date: Immediate

decking around our school pond are you the property owner: tenant (with permission) property type: commercial what level of service do you require: supply and deck please call to appoint

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Peterlee is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Peterlee £975-£2,495
Carpenters and joiners in Peterlee £375-£575
Plasterboard dry lining in Peterlee £638-£978
Wood flooring in Peterlee £750-£1,150
Wooden decking in Peterlee £1,125-£1,725
Garden shed in Peterlee £450-£690
Wooden window repair in Peterlee £320-£480

Related Carpenter searches in Peterlee

Carpenter FAQs

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
Can I install wooden flooring myself?

Are you a new homeowner? Or perhaps you’re simply looking to revitalize your home by adding some new flooring options. Wooden flooring is one of the most popular flooring options amongst home and property owners in the UK due to the multiple benefits it offers. It adds your home’s curb appeal making it stand out while also adding to resale value of your home - should you decide to sell in the near future. When it comes to the installation of wooden flooring, you have two options which includes carrying out the installation yourself or calling in a professional for help. While some homeowners would prefer to tackle this themselves, it’s highly advisable to get professional support for the project. In this article, we’re going to consider some of the benefits you stand to derive from getting your wooden flooring installed by a professional. Let’s take a look!  Efficient installation. Since professionals do this type of work almost on a daily basis, they’re generally able to complete a basic job within a day or two. With them, you’d be certain that you job would be completed to perfection within a certain timeframe.  Access to a range of wooden flooring options. Professionals are usually familiar with top notch wooden flooring options so they’re able to make recommendations on the most suitable wooden flooring type for your home and needs.  Flooring removal. Professionals typically remove old or existing flooring and clean up the area prior to the installation of the new wooden flooring. This way, you wouldn’t have to bother about hiring someone else to remove the existing flooring or to clean up the entire area before you can be able to install the new wooden flooring yourself.

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How much is decking?
How much decking costs depends on the type of material you go for, how big you want your decking to be and where you live in the country. But typically, the cost of decking is between £1,200 - £1,800. The most popular material for decking is pre-treated softwood, which will set you back around £1,000 for 15m2. Hardwood is more expensive but is more durable, and will cost approximately £2,000 for the same amount. Homeowners are also beginning to choose composite decking, which is made from recycled plastic and wood fibres, and is low-maintenance and eco-friendly. This will cost around £1,600 for 15m2, while uPVC which is also a low-maintenance option costs around £600. People tend to choose composite over uPVC because it looks more like natural timber. If you’re a competent DIYer, you might want to have a go at laying decking yourself which will set you back around £1,000 for a standard softwood timber deck. We think it’s worth paying the extra £600 for a professional to lay your decking, since they will be able to do it much more quickly. If you do want to try it yourself, we recommend leaving at least a whole weekend open to do it, but it’s likely to take you longer. Factor in the possibility of having to take time off work to complete it and it might be more cost-effective to leave it to the pros.
How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
What is the supply cost of wooden flooring

Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.

If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.

Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Parquet flooring is long lasting and very attractive, but quite expensive to have fitted.  You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Peterlee.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Peterlee?

View our open Carpenter jobs near you

Join today
View Shortlist