Find a Carpenter you can trust in County Durham.

Choose from 85 Carpenters, all rated by people like you.

Over 96 reviews & an average rating of 4.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro
All Work 100% Guaranteed - Fully Insured - (No Job Too Small) - Call Us Today! We Beat Any Price. All Work Fully Guarantee...
Verified Pro

Yorkshire Soundproofing

0 review(s)
Offers services in COUNTY DURHAM
Understanding how soundproofing works can be a bit of a minefield but we are happy to explain how the dB scale works and w...
Verified Pro

Pro lay

0 review(s)
Offers services in COUNTY DURHAM
Professional and friendly service in tree topping and removal roofing fencing’s and driveways patio basic general home mai...
Verified Pro

Haus 12 Interior

0 review(s)
Offers services in COUNTY DURHAM
Haus 12 Interiors is in the kitchen business for over 25 years, you could say that we know a thing or two about designing ...
Verified Pro

Morespace conversions NE

0 review(s)
Offers services in COUNTY DURHAM
Been in the building trade for nearly 30 years there isn't much I haven't done in the building trade. Got all the trades ...

Recent Carpenter Enquiries

21 Jun

Garden | Sheds

Bishop Auckland - DL14

Enquiry from: Marc D

Start Date: Immediate

I've bought a *** plastic shed, I would like a base laying for it and the shed assembling on it too if possible. I would also like some rabbit proofing done around my fences and gate.

Post a similar request >

30 May

Garden | Sheds

Bishop Auckland - DL13

Enquiry from: Sophie B

Start Date: Immediate

garden maintenance at least monthly - mow lawn and clear weeds and plant herbs. are you the property owner: owner property type: detached do you have a: large garden garden type: front garden work req...

Post a similar request >

30 May

Garden | Sheds

Bishop Auckland - DL13

Enquiry from: Sophie B

Start Date: Immediate

customer in the bishop auckland area made an enquiry a couple of projects including garden shed.call anytime and arrange an appointment to discuss. below is some details about this project: are you th...

Post a similar request >

30 Dec

Kitchen | Fitting

Darlington - DL3

Enquiry from: Lisa C

Start Date: Immediate

customer made an enquiry for kitchen design & installation and confirmed on the quotatis site they would like quotes from a kitchen installer.ms lives in the darlington area and would like a call to d...

Post a similar request >

10 Nov

Carpentry

Spennymoor - DL16

Enquiry from: Vanessa I

Start Date: Immediate

Wooden window repair Lead

I need a quote for inspecting and repair if necessary a sloping floor in the bathroom, this appears to be due to bath and the weight of the bath when full of water. I need a joinery/carpenter contr...

Post a similar request >

07 Nov

Carpentry

Stanley - DH9

Enquiry from: Scott B

Start Date: Immediate

Good Afternoon I'm enquiring to see if you could fabricate 2 off table tops 2100x1000 and 1665x1000. These need to manufactured from 30mm light oak with radius edges and corners. I have a drawing ...

Post a similar request >

16 Aug

Garden | Decking

Bishop Auckland - DL13

Enquiry from: Amanda W

Start Date: Immediate

i have 1 acre land. weeding and regular maintenance. pruning, hedge cutting are you the property owner: owner property type: detached do you have a: large garden current state of garden: the garden is...

Post a similar request >

31 May

Carpentry

Peterlee - SR8

Enquiry from: Kathryn R

Start Date: Less than one month

renovation of banisters and balustrades on stairs, new doorway created for under stairs space are you the property owner: owner of the property property type: semi detached what type of job are you lo...

Post a similar request >

01 Apr

Carpentry

Darlington - DL1

Enquiry from: Ray S

Start Date: Immediate

I'm not sure if you cover Darlington. I'm looking for a quote to replace the stair banisters with wooden ones.

Post a similar request >

06 Oct

Carpentry

Darlington - DL2

Enquiry from: Alex D

Start Date: Less than one month

2 doors to be hung via carpenter or handyman are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors what leve...

Post a similar request >

06 Oct

Carpentry

Seaham - SR7

Enquiry from: Brian M

Start Date: Less than one month

7internal doors require fitting are you the property owner: owner of the property time scale: less than one month what type of job are you looking to have done: wooden window/doors what level of servi...

Post a similar request >

06 Oct

Carpentry

Bishop Auckland - DL14

Enquiry from: Mark S

Start Date: Immediate

second hand french doors need fitting asap to garden room / mancave. are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: other do yo...

Post a similar request >

26 Aug

Carpentry

Seaham - SR7

Enquiry from: Victoria H

Start Date: Immediate

hello can you give me a rough price to supply and fit 2 internal doors please (depending on price may get more) but definitely the two worst ones to start, maybe cottage style but open to other styles...

Post a similar request >

24 Aug

Kitchen | Fitting

Shildon - DL4

Enquiry from: Ray E

Start Date: Immediate

full kitchen fitout. 1st fix plumbing & electrics done. see attached pdf.

Post a similar request >

16 Aug

Garden | Sheds

Darlington - DL3

Enquiry from: Christopher D

Start Date: Immediate

removal of dismantl*** x 5ft garden shed are you the property owner: relative of owner do you have a: small garden what level of service are you looking for: removal of old please call to appoint

Post a similar request >

03 Aug

Carpentry

Stanley - DH9

Enquiry from: Stephen M

Start Date: Less than one month

3 doors supplied and fitted including hinges and handles. one door to be hiung the opposite way are you the property owner: owner of the property property type: terrace what type of job are you lookin...

Post a similar request >

11 Jul

Carpentry

Stanley - DH9

Enquiry from: Ellen H

Start Date: 1 to 3 months

five internal doors fitted are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: other how many windows do you need: none do yo...

Post a similar request >

25 May

Garden | Sheds

Spennymoor - DL16

Enquiry from: Robert T

Start Date: Immediate

New shed to be fitted and I would like to put greenhouse along side which will be 10ft. Depends on cost.

Post a similar request >

09 May

Carpentry

Durham - DH7

Enquiry from: Karen M

Start Date: Immediate

4 standard size internal doors to be fitted one is glazed, i’ve got the handles and hinges already. are you the property owner: owner of the property property type: detached what type of job are yo...

Post a similar request >

30 Apr

Carpentry

Darlington - DL1

Enquiry from: Ken J

Start Date: Immediate

Wooden window repair Lead

i am disabled and need my doors measured for me. i require 5 x 6 panel pre painted doors including furniture fitted as soon as possible. i would also like the old doors removed. are you the property o...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in County Durham is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in County Durham £975-£2,495
Carpenters and joiners in County Durham £375-£575
Plasterboard dry lining in County Durham £638-£978
Wood flooring in County Durham £750-£1,150
Wooden decking in County Durham £1,125-£1,725
Garden shed in County Durham £450-£690
Wooden window repair in County Durham £320-£480

Related Carpenter searches in County Durham

Carpenter FAQs

What is engineered wood flooring?

What Is Engineered Wood Flooring?

Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.

Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.

The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:

• Its very easy and simple to install

• When compared to solid wood flooring, it’s more cost effective.

• It can be utilized alongside an under floor heating

• It can be loose laid, meaning it does not need to be fixed in position

• It is available in multiple varieties of wood and finishes

• It can be incorporated alongside an underlay including thermal barriers

• It can be utilized in areas with a fluctuating humidity and temperature.

• It is available in different kinds of thickness.

Click here to learn more about wood flooring.

Do I need planning permission for a shed?
Generally, you don’t need planning permission for a shed if you live in England or Wales. This applies whether it’s a wooden, metal, plastic or brick shed. However, there are a few conditions your shed will have to meet to not require planning permission:
  • The shed doesn’t cover more than 50% of the garden
  • It’s not in front of your house
  • The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
  • There’s no veranda or balcony
  • The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
  • The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
Exceptions Of course, there are always exceptions:
  • If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
  • If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
  • If you own a piece of woodland, you must seek planning permission for any permanent structure
  • In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
  • In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
So if you live in a straightforward house in England or Wales, you shouldn’t need planning permission for your shed. If you’re in any doubt, make sure you check with your local planning office.
How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in County Durham.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in County Durham?

View our open Carpenter jobs near you

Join today
View Shortlist