Find a Carpenter you can trust in Dromore.

Choose from 18 Carpenters, all rated by people like you.

Over 1 reviews & an average rating of 5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro
Precision Contracts is a family run business and have been the foremost contractors of home improvements, building and roo...
Verified Pro
Commercial Flooring Contractors NI is a trading style of Trade Flooring NI Ltd. Trade Floors NI supply and fit commercial...
Verified Pro

WMK Plastering

0 review(s)
Offers services in DROMORE
Hi im plastering 24 yrs new and old work both internal and exteral all work left 100% clean and tidy very reliable

Recent Carpenter Enquiries

12 Jan

Garden | Decking

Waringsford - BT25

Enquiry from: Deborah B

Start Date: 1 to 3 months

Are you the property owner: Owner of the property Property Type: Detached Time scale: 1-3 months Other Forms: None Please call to appoint

Post a similar request >

29 Jul

Garden | Sheds

Waringsford - BT25

Enquiry from: Walford K

Start Date: Less than one month

Are you the property owner: Owner Property Type: Detached Other Forms: 10085 Agreed to recieve quotes for selected products: Yes Please call to appoint

Post a similar request >

28 Nov

Flooring | Wooden

Waringsford - BT25

Enquiry from: Amanda C

Start Date: Immediate

floor boards for entrance and kitchen, wet room Are you the property owner: Owner of the property How many rooms are you looking to update with wood flooring: 3-4 Rooms What level of service do you r...

Post a similar request >

26 Aug

Carpentry

Waringsford - BT25

Enquiry from: F

Start Date: Immediate

new internal doors fitted

Post a similar request >

28 Aug

Carpentry

Craigavon - BT62

Enquiry from: Stephen B

Start Date: Immediate

Compete return of smallish kitchen to include as boiler replacement solid hardwood worktop and ceramic floor and wall tiles.

Post a similar request >

20 Jul

Garden | Sheds

Craigavon - BT62

Enquiry from: Gail R

Start Date: Immediate

Some door handles faulty. Trim around door required to finish. new outside door to shed.

Post a similar request >

17 Jul

Carpentry

Craigavon (East) - BT65

Enquiry from: Trea L

Start Date: Immediate

Hi there, I have a bath panel and need it fitted in Lismara, Craigavon. I have house guests coming in 4 days and really need it completed before they arrive - would this be something you could do in t...

Post a similar request >

16 Jul

Carpentry

Craigavon - BT66

Enquiry from: James B

Start Date: Immediate

stud wall and door fitted to a portable office asap property type: what level of service do you require: please call to appoint

Post a similar request >

13 Jun

Carpentry

Craigavon - BT62

Enquiry from: Zoe M

Start Date: Immediate

We are looking for two walls of shelving in a study and shelving in alcoves around the fireplace in the kitchen. All untreated so we can paint it. Thank you very much

Post a similar request >

29 May

Carpentry

Craigavon - BT63

Enquiry from: Moore H

Start Date: Immediate

TRIM FITTED AROUND A FIRE PLACE STOVE ENTRANCE, EDGING AROUND THE WOODEN FLOOR THAT MEETS THE HARTH IN FIRE PLACE ALSO. i HAVE THE TRIM BOUGHT JUST NEEDS CUT FITTED / MITERED

Post a similar request >

05 Mar

Carpentry

Craigavon - BT62

Enquiry from: Julie-Anne R

Start Date: Immediate

We are looking for quotes to extend a mezzanine inside a barn and reposition the staircase. Please let me know if this is something you could do and if you would like to arrange a site visit. Kind ...

Post a similar request >

21 Feb

Carpentry

Craigavon - BT66

Enquiry from: Marlene W

Start Date: Immediate

Staircase renovation spindles new steps and post or cladding if that would be possible

Post a similar request >

26 Jan

Carpentry

Craigavon - BT62

Enquiry from: Gary T

Start Date: Immediate

I have a 24.6kg wooden beam for above the fireplace but I was wondering if my studded wall could hold this weight? Is this something that you could do? Thanks

Post a similar request >

14 Jan

Carpentry

Craigavon - BT63

Enquiry from: Monika M

Start Date: Immediate

Wooden window repair Lead

Hello, I am leaving rented house. Need kitchen countertop cover replaced as there is a small damage to it. Please share a quote for the same. Thank you.

Post a similar request >

21 Jul

Carpentry

Ballynadolly - BT28

Enquiry from: Jason C

Start Date: Immediate

8 internal wooden doors to fitted

Post a similar request >

28 Jun

Carpentry

Duneight - BT27

Enquiry from: Ann I

Start Date: Immediate

8 doors supplied and fitted. are you the property owner: tenant (with permission) what type of job are you looking to have done: wooden window/doors how many windows do you need: none

Post a similar request >

23 Jun

Garden | Decking

Belfast - BT10

Enquiry from: Tapan M

Start Date: Immediate

Repairing of existing wooden deck

Post a similar request >

15 Apr

Kitchen | Fitting

Belfast - BT11

Enquiry from: Rebecca A

Start Date: Immediate

Hi I need a kitchen I purchased from Homebase fitted and a washing machine, sink, dishwasher, and cooker hood installed. I also need my floor tiled if you can do that also? Regards, Rebecca

Post a similar request >

13 Apr

Garden | Decking

Banbridge - BT32

Enquiry from: Colette W

Start Date: Immediate

Cleaning and restoration of decking

Post a similar request >

03 Apr

Garden | Decking

Ballynadolly - BT28

Enquiry from: Sarah D

Start Date: Immediate

i’d like a quote for some garden decking of around 20m squared with railings are you the property owner: owner of the property property type: semi detached what level of service do you require: supp...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Dromore is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Dromore £975-£2,495
Carpenters and joiners in Dromore £375-£575
Plasterboard dry lining in Dromore £638-£978
Wood flooring in Dromore £750-£1,150
Wooden decking in Dromore £1,125-£1,725
Garden shed in Dromore £450-£690
Wooden window repair in Dromore £320-£480

Related Carpenter searches in Dromore

Carpenter FAQs

How much does it cost to hang a door?

Check your Price's door installation cost calculator and charges guide will allow you to estimate both typical labours only costs for door hanging & installations, renovations and repairs as well as the total estimate for comprehensive door installation projects.

• Door & Frame Installation Job and the average Cost in £'s

• uPVC door installation including glazing & architrave costs around £90 per door

• uPVC french & patio door sets including glazing & architrave costs around £120 per pair

• Softwood french & patio door sets including architrave costs around £180 per door

• Hardwood french & patio door sets including architrave would cost around £250 per pair

• Softwood internal door hanging only would be around £40 per door

• Hardwood internal door hanging only would set you back around £48 per door

• Softwood external door hanging only is around £60 per door

• Hardwood external door hanging would cost around £70 per door

• Locks, letterboxes & door furniture timber doors are around £15 per Item

• Glazing £15 per pane

• Brick cut-outs single doors is around £60 per cut-out

• French or patio door brick cut-outs will be around £90 per cut-out

• New lintels will cost around £150 per lintel

Door Repair Costs and Charges

Estimate door mending labour charges by totalling the unit costs of the mandatory jobs. The complete door repair cost includes the total labour charge plus the cost of all parts, fixtures and fittings. A call out charge may be added on jobs totalling less than £100.

Average Cost of Door Repair Job

Replacement glazing units for uPVC doors will be around £15 per unit

Replacement glazing units for timber doors is around £20 per unit

Replacement door glass pined & putty will cost£30 per pane

Replacement handles are around £10 each and general repair work will cost you £25 per hour

Building & FENSA certificate charges

FENSA certificates are obligatory for maximum door replacements and new build setting up prices differ from council to council.

Average Cost of Window Repair Job: One to two doors will cost around £85

Average Cost of Door Fixtures & Fittings Removal Job

Removing internal doors will cost around £10

Removing internal door liners will cost around £15

Removing external timber doors will cost about £10

Removing External timber door frame will be around £20

Removing external uPVC door & frame removal will be around £30 and Rubbish disposal will cost £150 per ton.

What is engineered wood flooring?

What Is Engineered Wood Flooring?

Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.

Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.

The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:

• Its very easy and simple to install

• When compared to solid wood flooring, it’s more cost effective.

• It can be utilized alongside an under floor heating

• It can be loose laid, meaning it does not need to be fixed in position

• It is available in multiple varieties of wood and finishes

• It can be incorporated alongside an underlay including thermal barriers

• It can be utilized in areas with a fluctuating humidity and temperature.

• It is available in different kinds of thickness.

Click here to learn more about wood flooring.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Dromore.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Dromore?

View our open Carpenter jobs near you

Join today
View Shortlist