Find a Carpenter you can trust in Belfast.

Choose from 20 Carpenters, all rated by people like you.

Over 1 reviews & an average rating of 5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro
Precision Contracts is a family run business and have been the foremost contractors of home improvements, building and roo...
Verified Pro
Commercial Flooring Contractors NI is a trading style of Trade Flooring NI Ltd. Trade Floors NI supply and fit commercial...
Verified Pro

WMK Plastering

0 review(s)
Offers services in BELFAST
Hi im plastering 24 yrs new and old work both internal and exteral all work left 100% clean and tidy very reliable

Recent Carpenter Enquiries

18 Oct

Kitchen | Fitting

Belfast - BT15

Enquiry from: Gerry N

Start Date: Immediate

6 flat pack kitchen units fitted and box in pipes

Post a similar request >

13 Nov

Garden | Decking

Belfast - BT14

Enquiry from: Gerard M

Start Date: Immediate

Hi Can you please give a cost for a flat 7 metre by 3.5metre composite decking area raised only 15 to 20 cm from the ground. The area is currently is covered with decorative stones and is situated ...

Post a similar request >

18 Sep

Garden | Decking

Belfast - BT6

Enquiry from: Ricky F

Start Date: Immediate

Decking around summer house

Post a similar request >

18 Jun

Interior work | Stud Walls

Belfast - BT3

Enquiry from: Andy M

Start Date: Immediate

immediate requirement for installation of 40 lin mts of plasterboard and stud office partitioning , fitted between floor and suspended ceiling. project convenient in belfast. any interest please ring ...

Post a similar request >

31 Mar

Interior work | Stud Walls

Belfast - BT8

Enquiry from: Tom B

Start Date: Immediate

wall between living and dining room was opened up and archway created between the two rooms, about 2.5m wide, we would like to fill this in with stud wall and skim entire wall either side. are you the...

Post a similar request >

24 Nov

Carpentry

Belfast - BT9

Enquiry from: Jonathan H

Start Date: 1 to 3 months

removal of pvc front door & frame, replacement with wooden frame and front door (we have purchased the door but no frame). are you the property owner: owner of the property property type: semi detach...

Post a similar request >

24 Oct

Garden | Sheds

Belfast - BT16

Enquiry from: Claire C

Start Date: Immediate

Shed ripped down and removed

Post a similar request >

03 Aug

Flooring | Wooden

Belfast - BT12

Enquiry from: Miko L

Start Date: Immediate

Hi Please can you give me a quote for, placing wood or laminate flooring temporarily over a rental carpet? The carpet is lowpile. I don't have exact measurements of room but for a roof guide it's a...

Post a similar request >

26 Jun

Carpentry

Belfast - BT13

Enquiry from: Karen C

Start Date: Immediate

7 internal doors to be hing

Post a similar request >

23 Jun

Garden | Decking

Belfast - BT10

Enquiry from: Tapan M

Start Date: Immediate

Repairing of existing wooden deck

Post a similar request >

15 May

Garden | Decking

Belfast - BT8

Enquiry from: Jude T

Start Date: Immediate

i would like a small area of decking with rails and steps installed in my garden. are you the property owner: owner of the property property type: semi detached what level of service do you require: s...

Post a similar request >

04 May

Kitchen | Fitting

Belfast - BT6

Enquiry from: John T

Start Date: Immediate

kitchen worktop has burn stains and scratches although underlying material is sound i need a quote for refurbish/replace photos available and access easy via letting agent 5 minutes away please whats ...

Post a similar request >

15 Apr

Kitchen | Fitting

Belfast - BT11

Enquiry from: Rebecca A

Start Date: Immediate

Hi I need a kitchen I purchased from Homebase fitted and a washing machine, sink, dishwasher, and cooker hood installed. I also need my floor tiled if you can do that also? Regards, Rebecca

Post a similar request >

05 Apr

Carpentry

Belfast - BT9

Enquiry from: Fionnuala T

Start Date: Immediate

we have moved into a new house and want new doors (already bought and in the house) hung - 5 doors in total. are you the property owner: owner of the property what type of job are you looking to have ...

Post a similar request >

14 Feb

Garden | Decking

Belfast - BT13

Enquiry from: Samuel M

Start Date: Immediate

raised decking on 1side as my garden is on a hill . 12x14 metiers. i'm planning to put a summer-house on it. are you the property owner: owner of the property property type: semi detached what leve...

Post a similar request >

08 Sep

Garden | Decking

Belfast - BT15

Enquiry from: Nari A

Start Date: Immediate

back area requires re-decking with composite material that does not degrade. old decking requires removal and some investigation to drains as washing machine outlet and utility room outlet appear to d...

Post a similar request >

31 Jul

Garden | Decking

Belfast - BT9

Enquiry from: Oliver P

Start Date: Immediate

decking services - work to be decided on discussion of the quote. please use mobile if possible, as emails are only seen once a week are you the property owner: relative of owner property type: semi ...

Post a similar request >

20 Jul

Garden | Decking

Belfast - BT13

Enquiry from: Cristal P

Start Date: Immediate

Repair and maintenance of balcony decking.

Post a similar request >

18 Jul

Garden | Decking

Belfast - BT8

Enquiry from: CAOIMHE D

Start Date: Immediate

old decking needs to be replaced with new. thanks. are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call to ...

Post a similar request >

20 Jun

Garden | Sheds

Belfast - BT9

Enquiry from: Joe M

Start Date: Immediate

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for garden shed. they are unsure of options so would like to discuss with a carpenter.confirmed...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Belfast is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Belfast £975-£2,495
Carpenters and joiners in Belfast £375-£575
Plasterboard dry lining in Belfast £638-£978
Wood flooring in Belfast £750-£1,150
Wooden decking in Belfast £1,125-£1,725
Garden shed in Belfast £450-£690
Wooden window repair in Belfast £320-£480

Related Carpenter searches in Belfast

Carpenter FAQs

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How much does a stair banister cost?

The flight of steps in your multi-storey household doesn’t have to be purely efficient. With just a little thought given to banister design, the boring flight of stairs can turn into something you would like to show to people and be proud of. Replacement of your banister can even enhance the worth of your property, giving the entry an outstanding presence. But how much will new banisters and spindles cost you?

If you are considering starting with this project, having a help from a professional is always advised.

New banister cost

Banisters are also known as handrails. They are reinforced by balustrades or spindles – a row of pillars that improve the security of the stairway and donate in the direction of the overall look and feel. Banisters and spindles may appear dull due to use over time. A fresh coat of polish might help your staircase get a new facelift.

The cost of new banisters and spindles will fluctuate solely reliant on the material. The price for a new banister starts around £40 for softwood and can reach £120 for a metal one.

Spindle prices are also a contributing factor in determining the cost with prices in the range of £30 to £150 per meter based on the materials used.

How much does a new staircase banister cost?

Hiring a professional is very important when trying to properly install a new banister since they are familiar with the process and work as per safety compliance. Fitting your new banister can be easily taken care by a general builder as well as a carpenter.

Below is a table depicting the average costs of different types of bannisters and spindles:

White oak bannister is around £105 and spindles are around £13.50.

Pine bannister is around £35 and spindles are around £7.

Primed wood bannister costs around £31 and spindles costing around £18.

Metal bannister is around £110 with the spindles being around £6.

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.

What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Belfast.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Belfast?

View our open Carpenter jobs near you

Join today
View Shortlist