Find a Carpenter you can trust in Bagillt.

Choose from 111 Carpenters, all rated by people like you.

Over 64 reviews & an average rating of 4.2/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Clear Drain Services

0 review(s)
Offers services in BAGILLT
All drainage works carried out. All property maintenance works carried out. Same day response.
Verified Pro

M6 Flooring

0 review(s)
Offers services in BAGILLT
M6 Flooring Ltd is a family business that fits and restores wooden flooring and vinyl flooring, we also fit wood and vinyl...
Verified Pro

Banks Flooring Solutions

0 review(s)
Offers services in BAGILLT
Here at Banks Flooring Solutions, we offer flooring products such as luxury vinyl tile, vinyl, cushion floor vinyl, carpet...
Verified Pro

Setinstone driveways

0 review(s)
Offers services in BAGILLT
A Friendly Family run business, Specializing in Driveways & patios. With over 12 years experience working in landscaping a...

Recent Carpenter Enquiries

09 May

Garden | Decking

Bagillt, Flint - CH6

Enquiry from: Leah M

Start Date: Immediate

we purchased this house just over 13 months ago and the garden slants down and also to the left on ana angle. would be looking for leveling and possible stepping down if needed and a tidy up so it’s...

Post a similar request >

18 Nov

Carpentry

Bagillt, Flint - CH6

Enquiry from: Shaun M

Start Date: Immediate

skirting boards replacing after have damp course done

Post a similar request >

04 May

Garden | Sheds

Bagillt, Flint - CH6

Enquiry from: Martyn S

Start Date: Immediate

erect plastic shed and base what level of service are you looking for: install are you the property owner: owner of the property do you have a: medium size garden please call to appoint

Post a similar request >

30 Mar

Garden | Decking

Bagillt, Flint - CH6

Enquiry from: Debbie C

Start Date: Immediate

want to renew my decking with the new composite decking. are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please ca...

Post a similar request >

06 Jun

Garden | Sheds

Bagillt, Flint - CH6

Enquiry from: Mike S

Start Date: Immediate

erect a garden ashed Time scale: Immediate

Post a similar request >

06 Apr

Garden | Decking

Bagillt, Flint - CH6

Enquiry from: GARETH S

Start Date: Immediate

large area at top of garden needs decking,it is on a raised area had quotes already but to high in price can anyone help Are you the property owner: Owner of the property Property Type: Semi deta...

Post a similar request >

16 Aug

Carpentry

Bagillt, Flint - CH6

Enquiry from: Lee W

Start Date: Immediate

Home Owner Interior doors need trimming in order to be put back on hinges Please call to appoint

Post a similar request >

31 Oct

Carpentry

Chester - CH4

Enquiry from: Margaret C

Start Date: Immediate

internal bathroom door fitting with handles

Post a similar request >

17 Apr

Carpentry

Chester - CH4

Enquiry from: Kurt R

Start Date: Immediate

Dormer loft conversion with balcony fitted to rear overlooking fields

Post a similar request >

22 Mar

Carpentry

Deeside - CH5

Enquiry from: BRITTANY B

Start Date: Immediate

Hi, we are an interior designer fitting out some local show homes in Purton in September. please could we have a quote for a joiner to go to site to cut and fit a window seat? I can sent through a...

Post a similar request >

09 Feb

Carpentry

Chester - CH4

Enquiry from: Malveen B

Start Date: Immediate

New door frame, door and fittings to be fitted in bathroom. New door, fittings to be fitted in living room

Post a similar request >

01 Oct

Carpentry

Chester - CH2

Enquiry from: Charles I

Start Date: Immediate

Good evening, I am enquiring as to whether you would be able to provide a quote. I am looking for alcove units for a living room either side of a fire place. The cupboards need to be 205 in height, 10...

Post a similar request >

22 Oct

Carpentry

Chester - CH2

Enquiry from: Mike R

Start Date: Less than one month

remove pvc door and fit new composite door are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors how many w...

Post a similar request >

05 Aug

Garden | Decking

Chester - CH3

Enquiry from: Claire R

Start Date: Immediate

customer in chester areas is looking to do a couple of projects at the moment, and would like quotes for wooden decking.confirmed interest via sms and email at 05/08/2022 08:09.please call to arrange ...

Post a similar request >

22 Jul

Carpentry

Chester - CH1

Enquiry from: Tony G

Start Date: Immediate

to remove and fit new internal doors total of 11doors 3 with modifications to be discussed doors and handles are supplied are you the property owner: owner of the property property type: detached what...

Post a similar request >

17 Jul

Garden | Decking

Wrexham - LL12

Enquiry from: James G

Start Date: Immediate

buy & fit composit decking, needs fitting in next two weeks are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call...

Post a similar request >

30 Jun

Garden | Decking

St. Asaph - LL17

Enquiry from: Irene F

Start Date: Less than one month

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for wooden decking. they are unsure of options so would like to discuss with a carpenter.confir...

Post a similar request >

30 Jun

Carpentry

St. Asaph - LL17

Enquiry from: Irene F

Start Date: Less than one month

looking at a small decking area in garden roughly 3x6 x3x6. first job in a garden that needs a lot of work. are you the property owner: owner of the property property type: semi detached what type of ...

Post a similar request >

27 Jun

Carpentry

Chester - CH3

Enquiry from: Richard T

Start Date: Less than one month

i need you to hang a bedroom door. the last one fell off. are you the property owner: owner of the property what type of job are you looking to have done: wooden window/doors do you require a door(s):...

Post a similar request >

25 May

Carpentry

Wrexham - LL11

Enquiry from: Bernadette S

Start Date: Less than one month

quote to supply and fit 20 new wooden spindles, 3 wooden newel posts and wooden handrails on existing staircase. are you the property owner: owner of the property property type: semi detached what ty...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Bagillt is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Bagillt £975-£2,495
Carpenters and joiners in Bagillt £375-£575
Plasterboard dry lining in Bagillt £638-£978
Wood flooring in Bagillt £750-£1,150
Wooden decking in Bagillt £1,125-£1,725
Garden shed in Bagillt £450-£690
Wooden window repair in Bagillt £320-£480

Related Carpenter searches in Bagillt

Carpenter FAQs

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
Can I install wooden flooring myself?

Are you a new homeowner? Or perhaps you’re simply looking to revitalize your home by adding some new flooring options. Wooden flooring is one of the most popular flooring options amongst home and property owners in the UK due to the multiple benefits it offers. It adds your home’s curb appeal making it stand out while also adding to resale value of your home - should you decide to sell in the near future. When it comes to the installation of wooden flooring, you have two options which includes carrying out the installation yourself or calling in a professional for help. While some homeowners would prefer to tackle this themselves, it’s highly advisable to get professional support for the project. In this article, we’re going to consider some of the benefits you stand to derive from getting your wooden flooring installed by a professional. Let’s take a look!  Efficient installation. Since professionals do this type of work almost on a daily basis, they’re generally able to complete a basic job within a day or two. With them, you’d be certain that you job would be completed to perfection within a certain timeframe.  Access to a range of wooden flooring options. Professionals are usually familiar with top notch wooden flooring options so they’re able to make recommendations on the most suitable wooden flooring type for your home and needs.  Flooring removal. Professionals typically remove old or existing flooring and clean up the area prior to the installation of the new wooden flooring. This way, you wouldn’t have to bother about hiring someone else to remove the existing flooring or to clean up the entire area before you can be able to install the new wooden flooring yourself.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
Does my garden shed need a base?

Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Bagillt.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Bagillt?

View our open Carpenter jobs near you

Join today
View Shortlist