Find a Carpenter you can trust in Cheadle.

Choose from 191 Carpenters, all rated by people like you.

Over 58 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Sonsonia

0 review(s)
Offers services in CHEADLE
Sonsonia Ltd is a reliable construction company that serves Leeds and the surrounding areas. Our team of skilled professio...
Verified Pro

Woodsmiths Group

0 review(s)
Offers services in CHEADLE
WoodSmiths Designs for your bespoke furniture and interiors including shopfitting and home interiors and WoodSmiths Win...
Verified Pro

M6 Flooring

0 review(s)
Offers services in CHEADLE
M6 Flooring Ltd is a family business that fits and restores wooden flooring and vinyl flooring, we also fit wood and vinyl...

Recent Carpenter Enquiries

06 Jul

Garden | Decking

Cheadle - SK8

Enquiry from: Linda G

Start Date: Immediate

completion of composite decking area - nosing - are you the property owner: owner of the property property type: semi detached what level of service do you require: deck only please call to appoint

Post a similar request >

11 Jun

Carpentry

Cheadle - SK8

Enquiry from: Tony B

Start Date: Immediate

4 doors to be fitted. all doors and hardware already purchased. lpd solid oak doors pre finished, carlisle brass latch and hinge kits with three hinges. are you the property owner: owner of the proper...

Post a similar request >

21 Apr

Carpentry

Cheadle - SK8

Enquiry from: Wendy C

Start Date: Less than one month

i have recently purchased two wooden internal doors which need fitting, i have hinges and handles. are you the property owner: owner of the property property type: semi detached what type of job are...

Post a similar request >

04 Apr

Garden | Decking

Cheadle - SK8

Enquiry from: Denise H

Start Date: Immediate

remove rotten decking and subframe and replace with composite decking approximately 9 metre square are you the property owner: owner of the property property type: semi detached what level of service ...

Post a similar request >

19 Jun

Garden | Decking

Cheadle - SK8

Enquiry from: Anila G

Start Date: Immediate

customer in cheadle areas is looking to do a couple of projects at the moment, and would like quotes for wooden decking.confirmed interest via sms and email at 12/06/2021 15:01.please call to arrange ...

Post a similar request >

11 Jun

Garden | Decking

Cheadle - SK8

Enquiry from: Claire S

Start Date: Immediate

decking maintenance to include repair where necessary - and staining. are you the property owner: owner of the property property type: detached what level of service do you require: deck only please ...

Post a similar request >

31 Mar

Garden | Decking

Cheadle - SK8

Enquiry from: Gavin L

Start Date: Immediate

customer made an online enquiry for wooden decking and confirmed on sms and email they would like a call with a landscaper to discuss prices.please call to arrange an appointment to quote. are you the...

Post a similar request >

20 Nov

Garden | Decking

Cheadle - SK8

Enquiry from: Catherine D

Start Date: Immediate

decking off upper level of garden, lower level to have raised beds and astro turf centre are you the property owner: owner of the property property type: semi detached what level of service do you req...

Post a similar request >

08 Jun

Garden | Decking

Cheadle - SK8

Enquiry from: Jeanette N

Start Date: Immediate

Are you the property owner: Owner of the property Property Type: Semi detached Other Forms: None Please call to appoint

Post a similar request >

16 Oct

Kitchen | Fitting

Cheadle - SK8

Enquiry from: Sangeeta S

Start Date: Immediate

Submit your free quote for rated tradespeople

Post a similar request >

02 Oct

Kitchen | Fitting

Cheadle - SK8

Enquiry from: Akeela H

Start Date: Immediate

Home Owner Call to Appoint

Post a similar request >

27 Aug

Garden | Decking

Cheadle - SK8

Enquiry from: Ian H

Start Date: 1 to 3 months

Are you the property owner: Owner Property Type: Semi detached Other Forms: None Please call to appoint

Post a similar request >

28 Mar

Kitchen | Fitting

Cheadle - SK8

Enquiry from: John W

Start Date: 1 to 3 months

Replacement 38mm x 600mm laminate surfaces. 3 sections covering three walls approx. 3m x 4m x 2m (2 joints) Need to reinstall gas hop and sink. Are you the property owner: Owner of the property What...

Post a similar request >

04 Jun

Garden | Decking

Cheadle - SK8

Enquiry from: Tom E

Start Date: 1 to 3 months

2x5 meters of decking raised to bi-fold level plus two steps down to grass Are you the property owner: Owner of the property Property Type: Semi detached What level of service do you require: Supply a...

Post a similar request >

28 Mar

Flooring | Wooden

Cheadle - SK8

Enquiry from: P

Start Date: Immediate

Wish to update flooring in house and if possible install under floor material to make it floor and house warmer. This is for the front room, kitchen and hallway in small house. Also have 2 small ...

Post a similar request >

13 Mar

Garden | Sheds

Cheadle - SK8

Enquiry from: Dennis M

Start Date: Immediate

Replace existing 8ft x 6ft wooden shed.

Post a similar request >

11 Mar

Flooring | Wooden

Cheadle - SK8

Enquiry from: D

Start Date: Immediate

Wooden flooring 160 m2 Engineered dark wood

Post a similar request >

30 Apr

Garden | Decking

Cheadle - SK8

Enquiry from: Christine H

Start Date: Immediate

Replace old decking with new at rear of bungalow. Approx 10 metres long Homeowner Supplied and fitted Please contact to appoint

Post a similar request >

24 Apr

Kitchen | Fitting

Cheadle - SK8

Enquiry from: K

Start Date: Immediate

Straight forward Installation of 10 Units with work tops, water pipe, sink connection and plugs connections already in place. Are you the property owner: Owner of the property What level of servic...

Post a similar request >

17 Apr

Kitchen | Fitting

Cheadle - SK8

Enquiry from: K

Start Date: Immediate

Straight forward Installation of 10 Units with work tops, water pipe, sink connection and plugs connections already in place. Are you the property owner: Owner of the property What level of service do...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Cheadle is:

£879

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Cheadle £975-£2,495
Carpenters and joiners in Cheadle £375-£575
Plasterboard dry lining in Cheadle £638-£978
Wood flooring in Cheadle £750-£1,150
Wooden decking in Cheadle £1,125-£1,725
Garden shed in Cheadle £450-£690
Wooden window repair in Cheadle £320-£480

Related Carpenter searches in Cheadle

Carpenter FAQs

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Cheadle.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Cheadle?

View our open Carpenter jobs near you

Join today
View Shortlist