Find a Carpenter you can trust in High Wycombe.

Choose from 317 Carpenters, all rated by people like you.

Over 335 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 Reviews

JM Fencing and Landscaping

89 review(s)
Offers services in HIGH WYCOMBE
Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening a...
Verified ProOver 10 Reviews

Stoneartuk

14 review(s)
Offers services in HIGH WYCOMBE
Hi my name is Martin from stone art uk ltd we are a local run landscaping company within the Pinner area we specialise in ...
Verified Pro
We are a family run business with an array of experience and knowledge in the kitchen and bedroom industry. We offer the ...
Verified Pro

Topknotflooringuk

0 review(s)
Offers services in HIGH WYCOMBE
Topknotflooringuk brings 15 years experience in wood floor coverings such as laminate , engineered and solid wood flooring...

Recent Carpenter Enquiries

09 May

Garden | Sheds

High Wycombe - HP10

Enquiry from: Joanne C

Start Date: Immediate

Wooden window repair Lead

The roof on my large garden shed needs replacing, it currently has a felt roof which has partly blown away during the recent storms, it has a double pitched roof and all needs replacing. It doesn’...

Post a similar request >

04 Sep

Carpentry

High Wycombe - HP13

Enquiry from: Zara A

Start Date: Immediate

i need 3 doors shaved from the bottom and the doors put back on are you the property owner: tenant (with permission) property type: terrace what type of job are you looking to have done: wooden window...

Post a similar request >

12 Aug

Windows | Wooden | Repair

High Wycombe - HP15

Enquiry from: Cleo H

Start Date: Immediate

to replace some damaged frames and paint all window frames for preservation

Post a similar request >

05 Aug

Carpentry

High Wycombe - HP12

Enquiry from: Andrew T

Start Date: Immediate

2 internal doors fitted, one door changed so hinge on other side of the frame. are you the property owner: owner of the property property type: semi detached what type of job are you looking to have d...

Post a similar request >

11 Apr

Garden | Decking

High Wycombe - HP14

Enquiry from: Anjuna B

Start Date: Immediate

make decking on raised part of the garden. are you the property owner: owner property type: detached do you have a: medium size garden garden type: back garden work required: decking current state of...

Post a similar request >

06 Apr

Garden | Decking

High Wycombe - HP14

Enquiry from: Anjuna B

Start Date: Immediate

make decking on raised part of the garden. are you the property owner: owner property type: detached do you have a: medium size garden garden type: back garden work required: decking current state of...

Post a similar request >

15 Nov

Garden | Decking

High Wycombe - HP14

Enquiry from: Martin S

Start Date: Immediate

replace current wooden deck with composite with replacement of some wooden piers and supports are you the property owner: owner of the property property type: detached what level of service do you re...

Post a similar request >

23 Oct

Garden | Sheds

High Wycombe - HP11

Enquiry from: David C

Start Date: Immediate

i have. 12 x 8 modular shed that needs building. looking for a quote are you the property owner: owner of the property do you have a: large garden what level of service are you looking for: install p...

Post a similar request >

18 Oct

Garden | Decking

High Wycombe - HP14

Enquiry from: Martin S

Start Date: Immediate

replace current wooden deck with composite with replacement of some wooden piers and supports are you the property owner: owner of the property property type: detached what level of service do you re...

Post a similar request >

28 Aug

Garden | Decking

High Wycombe - HP10

Enquiry from: Michael R

Start Date: Immediate

replace existing decking with wood decking and new footings and foundations. are you the property owner: owner of the property property type: detached what level of service do you require: supply and ...

Post a similar request >

23 Mar

Garden | Decking

High Wycombe - HP11

Enquiry from: Anita L

Start Date: Immediate

new decking to be installed over old patio paving slabs are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to ...

Post a similar request >

16 Nov

Interior work | Stud Walls

High Wycombe - HP11

Enquiry from: Tilak B

Start Date: Immediate

i want a stud wall constructed inside my converted garage to create a partition between the long room. the approx height will be 88 inches and the length of the wall will be 66 inches. after plasterbo...

Post a similar request >

20 Jul

Carpentry

High Wycombe - HP10

Enquiry from: Ian H

Start Date: 1 to 3 months

build a new 8x10 aluminium framed greenhouse. expected delivery 10-12 weeks. (model is simplicity sun from the greenhouse people) time scale: 1-3 months please call to appoint

Post a similar request >

18 Jul

Carpentry

High Wycombe - HP14

Enquiry from: Lee E

Start Date: Immediate

Shed Roof approx 10ft *** *** needs replacing

Post a similar request >

04 Jul

Carpentry

High Wycombe - HP11

Enquiry from: Claudio L

Start Date: Immediate

new stair to loft conversion

Post a similar request >

06 Jun

Garden | Sheds

High Wycombe - HP13

Enquiry from: Eva C

Start Date: Immediate

are you the property owner: owner property type: semi detached other forms: garden shed agreed to receive quotes for selected products: yes please call to appoint

Post a similar request >

01 Feb

Carpentry

High Wycombe - HP11

Enquiry from: Rebecca S

Start Date: 1 to 3 months

We'd like two cupboards knocking together to make a larger airing cupboard, which will eventually hold a bigger hot water tank and a loft hatch enlarging, to allow a larger cold water tank to be insta...

Post a similar request >

22 Jan

Garden | Sheds

High Wycombe - HP13

Enquiry from: Shahzeb F

Start Date: Immediate

require the small 5mx4m garden landscaping plus decking and a medium - large sized shed on top

Post a similar request >

16 Sep

Garden | Decking

High Wycombe - HP13

Enquiry from: Sarah S

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: All types of work and possibly redesign

Post a similar request >

06 Apr

Flooring | Wooden

High Wycombe - HP15

Enquiry from: Stephen C

Start Date: Immediate

Great, what do you need done? Fitting Only So, what type of flooring you need? Wood Flooring Fix creaky floorboards under carpeted landing and replace existing carpet. Area measures 9'x3' and 3.5'x2....

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in High Wycombe is:

£1,073

Carpenter job Carpenter cost in 2025
Kitchen Fitting in High Wycombe £1,238-£3,748
Carpenters and joiners in High Wycombe £375-£575
Plasterboard dry lining in High Wycombe £638-£978
Wood flooring in High Wycombe £750-£1,150
Wooden decking in High Wycombe £663-£3,363
Garden shed in High Wycombe £300-£545
Wooden window repair in High Wycombe £320-£480

Related Carpenter searches in High Wycombe

Carpenter FAQs

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

Where can I buy kitchen cabinets?

When you’re building or redesigning your kitchen, one of the most important decisions you’d have to make is your kitchen cabinets. They are basically where you’ll keep everything you use to cook and as such, take up a lot of space in the kitchen. Therefore, if the aesthetic of your kitchen is a priority, then you’d probably want to get the best quality and good looking cabinet you possibly can. If you’re in the market for new kitchen cabinets, you can put these sources of cabinets into consideration. Let’s take a look!

  • IKEA. One of the best place to buy affordable home goods is also a great place to check if you want to buy your kitchen cabinets. According to a research carried out by J.D Power which surveyed over 1500 customers within the past one year, IKEA’s cabinet system ( Sektion) ranked the highest in terms of the overall satisfaction.
  • KraftMaid. Another winner of the survey conducted by J.D Power as it took the second position when it comes to the overall satisfaction. Therefore, this store happens to be a good option based on the reviews. This store provides you with a wide variety of colour options to select from, so regardless of what your personal preference is, you’re guaranteed to find something worthwhile to install in your kitchen.
  • Stoffer Home. When you buy your kitchen cabinet from an interior designer, there’s a better chance for suitability. Stoffer home offers top quality cabinets which can be manufactured in four various wood finishes and twelve varying paint colours which are all carefully curated.
How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in High Wycombe.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in High Wycombe?

View our open Carpenter jobs near you

Join today
View Shortlist