Kitchen | Fitting
Eyemouth - TD14
Enquiry from: Eileen C
Start Date: Immediate
kitchen design & installation are you the property owner: owner of the property what level of service do you require: install only
-->
Over 5 reviews & an average rating of 4.9/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Eyemouth - TD14
Enquiry from: Eileen C
Start Date: Immediate
kitchen design & installation are you the property owner: owner of the property what level of service do you require: install only
Eyemouth - TD14
Enquiry from: Linda R
Start Date: Immediate
Create a chimney breast around a new wood burning stove Time scale: Immediate Please call to appoint Please call to appoint
Eyemouth - TD14
Enquiry from: Drew B
Start Date: Less than one month
Shed for storage 2.5m x 3m. No windows needed. double doors required for max opening, felted roof . Concrete slab floor needed. Thanks. Are you the property owner: Owner of the property Do you have a...
Eyemouth - TD14
Enquiry from: Anita G
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Removal of various mature shrubs, design of large decked area to flow with rema...
Berwick-upon-tweed - TD15
Enquiry from: Richard R
Start Date: Immediate
We have a new kitchen installed and would appreciate a quote if possible. The kitchen is being delivered on the 24th of July, all units are pre-assembled and the worktops are Minnerva. Many thanks
Berwick-upon-tweed - TD15
Enquiry from: Dave W
Start Date: Immediate
On the off chance. Do you repair sash window cords please - or suggest anyone who does. Thank you. Dave
Berwick-upon-tweed - TD15
Enquiry from: Drew D
Start Date: Immediate
gardening , landscaping and possibly hedge and fence work garden type: back garden, front garden property type: semi detached are you the property owner: owner of the property roughly the size of your...
Duns - TD11
Enquiry from: GEORGE B
Start Date: Immediate
mr requested quotes for garden shed from a carpenter around duns. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below is what ...
Berwick-upon-tweed - TD15
Enquiry from: Anne M
Start Date: Immediate
looking for large garden shed,12' x8', full installation including base required are you the property owner: owner of the property do you have a: medium size garden what level of service are you look...
Berwick-upon-tweed - TD15
Enquiry from: TONY C
Start Date: Immediate
APPROX 12 X 8 SHIPLAP WITH DOUBLE DOORS AND WINDOWS. PREFER PENT ROOF. MUST HAVE STRONG FLOOR.
Berwick-upon-tweed - TD15
Enquiry from: Stuart L
Start Date: 1 to 3 months
customer in the berwick-upon-tweed area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are ...
Berwick-upon-tweed - TD15
Enquiry from: Stuart L
Start Date: 1 to 3 months
are you the property owner: owner of the property property type: semi detached other forms: wooden decking agreed to receive quotes for selected products: yes please call to appoint what level of ser...
Berwick-upon-tweed - TD15
Enquiry from: Michael W
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Fencing decking gardening
Berwick-upon-tweed - TD15
Enquiry from: JAMES J
Start Date: Immediate
To make a 10ft X 18ft garden shed
Berwick-upon-tweed - TD15
Enquiry from: Mary R
Start Date: Immediate
Creation of understairs cupboard and drawers and boxing in piping and electrics in new downstairs toilet
Berwick-upon-tweed - TD15
Enquiry from: Emily A
Start Date: 1 to 3 months
I have a mobile home at Berwick holiday park with a full length decking with three steps. Not sure exact length but think the front is is roughly either 14ft x 8ft. Side is 38ft long x 3ft wide. Only ...
Berwick-upon-tweed - TD15
Enquiry from: Dea P
Start Date: Immediate
Wooden decking, approx 3.2m by 6.2m Are you the property owner: Tenant (with permission) Property Type: Semi detached What level of service do you require: Supply and deck Time scale: Immediate
Berwick-upon-tweed - TD15
Enquiry from: K
Start Date: Immediate
Pull down old shed and price for building a new one in same place but slightly bigger.
Duns - TD11
Enquiry from: B
Start Date: Immediate
Kitchen gutted then drylined drains moved rewiring new units fitted ceiling replastered new door fitted tiles on floor
Duns - TD11
Enquiry from: Paul D
Start Date: Immediate
Internal 1981x838 glazed to allow more light into hall from kitchen and from living room. Oak finish and clear glass. - Desired Start Date: 15/01/2016 - Number of Doors: 2 - Door Material: Wood
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2024 |
---|---|
Kitchen Fitting in Eyemouth | £975-£2,495 |
Carpenters and joiners in Eyemouth | £375-£575 |
Plasterboard dry lining in Eyemouth | £638-£978 |
Wood flooring in Eyemouth | £750-£1,150 |
Wooden decking in Eyemouth | £1,125-£1,725 |
Garden shed in Eyemouth | £450-£690 |
Wooden window repair in Eyemouth | £320-£480 |
Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!
• Firstly, you need to put the plasterboard sheet flat on a firm surface.
• Use the tape measurement to measure the cut you wish to make.
• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.
• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.
• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.
• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.
• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.
• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.
• Using a fine sandpaper, remove all forms of paper burrs.
The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.
What Is Engineered Wood Flooring?
Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.
Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.
The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:
• Its very easy and simple to install
• When compared to solid wood flooring, it’s more cost effective.
• It can be utilized alongside an under floor heating
• It can be loose laid, meaning it does not need to be fixed in position
• It is available in multiple varieties of wood and finishes
• It can be incorporated alongside an underlay including thermal barriers
• It can be utilized in areas with a fluctuating humidity and temperature.
• It is available in different kinds of thickness.
Click here to learn more about wood flooring.
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Eyemouth.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today