Find a Carpenter you can trust in Berkshire.

Choose from 498 Carpenters, all rated by people like you.

Over 496 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 Reviews

JM Fencing and Landscaping

89 review(s)
Offers services in BERKSHIRE
Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening a...
Verified ProOver 50 Reviews

Tree & Garden Designs

63 review(s)
Offers services in BERKSHIRE
I am a family runed business professional and efficient for 30 years !
Verified ProOver 10 Reviews

J Ball & SON

14 review(s)
Offers services in BERKSHIRE
J ball and son is a family run business with over 15 years experience, we offer quality fencing at affordable prices, All...
Verified Pro
We are a family run business with an array of experience and knowledge in the kitchen and bedroom industry. We offer the ...
Verified Pro

Jm2TilingCo

0 review(s)
Offers services in BERKSHIRE
Here at Jm2TilingCo standards are kept to the absolute highest level. I will always leave a job clean and well done, plus ...

Recent Carpenter Enquiries

12 Jul

Carpentry

Reading - RG5

Enquiry from: Neil H

Start Date: Immediate

Just had new carpet fitted, would like a taller Skirting Board to the Living Room.

Post a similar request >

11 Jul

Carpentry

Reading - RG5

Enquiry from: Jeni T

Start Date: Immediate

We are moving into the property and need repairs to the squeaky floor in the attic room, making the room more teenage friendly and advice on modernising a staircase.

Post a similar request >

04 Jul

Carpentry

Reading - RG10

Enquiry from: Rob H

Start Date: Immediate

Hi. Need four internal doors fitted with new fittings plus one extra handle to be replaced on an under stairs cupboard.

Post a similar request >

27 Jun

Kitchen | Fitting

Maidenhead - SL6

Enquiry from: Pauline L

Start Date: Immediate

Remove old kitchn, install new. Update electrics and add extra sockets. Tile lay flooring paint walls above tiling

Post a similar request >

23 Jun

Carpentry

Windsor - SL4

Enquiry from: Amanda C

Start Date: Immediate

Room dividing doors between 2 reception rooms, so ideally glazed/half glazed

Post a similar request >

12 May

Carpentry

Windsor - SL4

Enquiry from: Emma F

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

Hi, we're looking for some custom baby stair gates to match our current stair case. 2x gates needed

Post a similar request >

08 May

Carpentry

Crowthorne - RG45

Enquiry from: Anita J

Start Date: Immediate

Exit door (does not need to be fire door) plus door frame - timber or pvc. - need quote please- Homegroup Retirement leasehold property

Post a similar request >

30 Apr

Carpentry

Reading - RG5

Enquiry from: Natasha I

Start Date: Immediate

Strange request! Benches!

Post a similar request >

20 Feb

Carpentry

Reading - RG5

Enquiry from: Jeni T

Start Date: Immediate

I was wondering how much it would cost to rehang a bathroom door so it opens outwards please. Thank you.

Post a similar request >

17 Feb

Carpentry

Thatcham - RG18

Enquiry from: Isla S

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead

Hi there, I need a new bath panel made and fitted and tiling for my downstairs loo. I can provide photos if needed for quoting purposes. Best wishes, Isla Simpson

Post a similar request >

11 Feb

Carpentry

Thatcham - RG18

Enquiry from: Toby E

Start Date: Immediate

Hi there. I wonder if you can help. We are doing some alterations to our house and are looking for someone to help with various carpentry work. Boot Room (v approx 2.5m x 2.5m) We have...

Post a similar request >

01 Feb

Carpentry

Windsor - SL4

Enquiry from: Rick R

Start Date: Immediate

Hi Team, Hope you are well? I am looking to get some quotes for 2 piece of work please: - Fit out of existing larder around a boiler - Simple shelving unit on the wall opposite. Happy to ...

Post a similar request >

28 Jan

Garden | Sheds

Reading - RG7

Enquiry from: Sajith C

Start Date: Immediate

regular maintenance of a small front garden and a hedge in a cottage are you the property owner: owner property type: terrace do you have a: small garden garden type: back garden, front garden work re...

Post a similar request >

04 Jan

Carpentry

Maidenhead - SL6

Enquiry from: Irfan B

Start Date: Immediate

The interior doors trimmed inside the house.

Post a similar request >

15 Dec

Carpentry

Windsor - SL4

Enquiry from: Richard W

Start Date: Immediate

we are the managing agent for this development and require some new external doors to be supplied, fitted and decorated. 3 pairs framed ledged & braced bin store doors, refit original locks. 1 extern*...

Post a similar request >

30 Nov

Carpentry

Reading - RG6

Enquiry from: Penny S

Start Date: Immediate

I moved into my house a couple of years ago and the loft had already been converted into a room (not a bedroom). It had significant condensation, no insulation and dodgy wiring. We have "de-constructe...

Post a similar request >

10 Nov

Carpentry

Maidenhead - SL6

Enquiry from: Irfan B

Start Date: Immediate

Doors hanged skirting boards architrave cupboard

Post a similar request >

13 Sep

Carpentry

Reading - RG31

Enquiry from: Mark C

Start Date: Immediate

Carpenters to take on our garage conversions Stud work, insulation, plaster boarding, 1st/ 2nd fix carpentry Price work/ day rate available Look run of work

Post a similar request >

22 Aug

Carpentry

Windsor - SL4

Enquiry from: Alison P

Start Date: Immediate

removal of sash windows, repair and painting of frames and windows are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: wooden windo...

Post a similar request >

17 Aug

Carpentry

Reading - RG5

Enquiry from: Matthew B

Start Date: Immediate

Hello I am just writing this to enquire about any job opportunities or even apprenticeships that might be available now or in the near future.

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Berkshire is:

£1,350

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Berkshire £1,238-£3,748
Carpenters and joiners in Berkshire £375-£575
Plasterboard dry lining in Berkshire £638-£978
Wood flooring in Berkshire £750-£1,150
Wooden decking in Berkshire £663-£3,363
Garden shed in Berkshire £1,700-£3,030
Wooden window repair in Berkshire £320-£480

Related Carpenter searches in Berkshire

Carpenter FAQs

What is the supply cost of wooden flooring

Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.

If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.

Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Parquet flooring is long lasting and very attractive, but quite expensive to have fitted.  You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Berkshire.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Berkshire?

View our open Carpenter jobs near you

Join today
View Shortlist