Find a Carpenter you can trust in Aberlour.

Choose from 22 Carpenters, all rated by people like you.

Over 1 reviews & an average rating of 3.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Shs Construction

0 review(s)
Offers services in ABERLOUR
With over 20 years of experience, we are a hardworking and dedicated team committed to delivering quality, reliable, and o...
Verified Pro
Joinery plastering paintings and decoration tiles and bathrooms
Verified Pro

Highland Green

0 review(s)
Offers services in ABERLOUR
Highland Green are a local, independent, professional lawn care and gardening company serving the North of Scotland.

Recent Carpenter Enquiries

16 Jan

Kitchen | Fitting

Aberlour - AB38

Enquiry from: Wendy a

Start Date: Immediate

installation of new kitchen, supplied already assembled units from wrens kitchens. 6 base units and 4 wall units, with solid wood work tops. please provide quote and estimated date of installation. ...

Post a similar request >

16 Oct

Garden | Sheds

Aberlour - AB38

Enquiry from: Kim S

Start Date: 1 to 3 months

We are looking for a shed to house an electric box, water pump and filters. No window needed, basic and secure the priority. Customer made ideal dependent on price. Are you the property owner: Owner...

Post a similar request >

08 Aug

Garden | Sheds

Aberlour - AB38

Enquiry from: Maureen S

Start Date: Immediate

I am looking to erect a Shed in my Garden. It must be damp proof So therefore insulated. I would need lighting and an electrical socket.I would like it to be at least 10ft x 10ft but unsure of any pla...

Post a similar request >

17 Jun

Garden | Sheds

Elgin - IV30

Enquiry from: Alex C

Start Date: Immediate

Hi, Our wooden garden shed roof seems to be leaking, we believe the roof felt has worn out? If this could be replaced or with a better material asap would be much appreciated. Can post pictures ove...

Post a similar request >

21 Mar

Windows | Wooden | Repair

Fochabers - IV32

Enquiry from: David G

Start Date: Immediate

17 No. sash and case windows require refurbishment. Missing and loose putty to be replaced. Wooden window sills replaced. General refurbishment of any damaged woodwork. All sanded and primed and finis...

Post a similar request >

22 Jan

Windows | Wooden | Repair

Elgin - IV30

Enquiry from: Michelle A

Start Date: 3+ months

sash window refurbishment. timber appears good condition. windows are painted shut and some strings broken. are you the property owner: owner of the property property type: detached what service ar...

Post a similar request >

30 May

Garden | Decking

Keith - AB55

Enquiry from: Struan M

Start Date: Immediate

customer in the keith area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the prope...

Post a similar request >

04 Aug

Carpentry

Elgin - IV30

Enquiry from: Lee S

Start Date: Immediate

would like a shed to be built in the garden, dimensions would roughly be 4 metres x 3 metres. i am looking to get an estimated and how long it would take to build. many thanks lee time scale: immediat...

Post a similar request >

04 Aug

Flooring | Wooden

Keith - AB55

Enquiry from: Robin L

Start Date: Immediate

are you the property owner: owner of the property is this for a residential or commerial building: domestic other forms: wood flooring agreed to receive quotes for selected products: yes please call ...

Post a similar request >

03 Aug

Carpentry

Elgin - IV30

Enquiry from: Emeka A

Start Date: Immediate

dismantle part of a 3- seater sofa in order to get pass through a lounge door time scale: immediate please call to appoint

Post a similar request >

19 Mar

Garden | Sheds

Keith - AB55

Enquiry from: Alistair W

Start Date: Immediate

An 8 x 10 greenhouse Are you the property owner: Owner of the property Property Type: Detached Roughly the size of your garden: 31+ m2 Garden Type: Back garden, Front garden Do you have a design: Y...

Post a similar request >

13 Jan

Garden | Sheds

Keith - AB55

Enquiry from: Euan S

Start Date: Less than one month

I am looking for a quote for a 12ft by 8 or 10ft shed with 2 x windows. I would also like to partition up to about 4ft high (at the back of the shed) to make a dog kennel with a hinged roof. also a h...

Post a similar request >

07 Jul

Windows | Wooden | Repair

Fochabers - IV32

Enquiry from: Suzanne J

Start Date: Immediate

Window panel has a massive crack in it. Frame is old style window frame that slides up and down. Number of Windows: 1 Material: Wood Are you the property owner: Tenant (with permission) What level of...

Post a similar request >

05 Jun

Garden | Sheds

Elgin - IV30

Enquiry from: Helen M

Start Date: 1 to 3 months

Garden shed no larger than 5 ft x 5ft. for new home at 6 grant st Burghead

Post a similar request >

19 Feb

Kitchen | Fitting

Keith - AB55

Enquiry from: Cath T

Start Date: Less than one month

New worktops , splashback , electrical points , hob and sink . Are you the property owner: Owner of the property What level of service do you require: Install Only Do you have all of the required mate...

Post a similar request >

31 Jan

Kitchen | Fitting

Elgin - IV30

Enquiry from: Kevin S

Start Date: 1 to 3 months

Old kitchen taken out and new kitchen installed Are you the property owner: Owner of the property Do you have all of the required materials for your kitchen already: Yes Agreed to recieve Kitchen Supp...

Post a similar request >

20 Sep

Garden | Sheds

Elgin - IV30

Enquiry from: Lewis D

Start Date: Less than one month

8ft by 6ft with door on the long wall of the shed Time scale: Less than one month

Post a similar request >

09 Aug

Garden | Decking

Elgin - IV30

Enquiry from: Jim D

Start Date: Immediate

We would like someone to design and install some decking in our back garden. Are you the property owner: Owner of the property Property Type: Detached What level of service do you require: Supply and ...

Post a similar request >

22 May

Carpentry

Elgin - IV30

Enquiry from: Simon M

Start Date: Immediate

Fitted wardrobe quote for 2 bedrooms and shelving and clothes rail for hallway required.

Post a similar request >

26 Apr

Garden | Decking

Elgin - IV30

Enquiry from: Ken P

Start Date: Immediate

Owner of static home and wanting some decking around the property. *

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Aberlour is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Aberlour £975-£2,495
Carpenters and joiners in Aberlour £375-£575
Plasterboard dry lining in Aberlour £638-£978
Wood flooring in Aberlour £750-£1,150
Wooden decking in Aberlour £1,125-£1,725
Garden shed in Aberlour £450-£690
Wooden window repair in Aberlour £320-£480

Related Carpenter searches in Aberlour

Carpenter FAQs

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to fit plasterboard?

How To Fit Plasterboard

If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.

To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.

Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.

• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit

• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.

• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.

• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Aberlour.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Aberlour?

View our open Carpenter jobs near you

Join today
View Shortlist