Find a Carpenter you can trust in Troon.

Choose from 49 Carpenters, all rated by people like you.

Over 42 reviews & an average rating of 4.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

K&D joinery

0 review(s)
Offers services in TROON
We’re just a small building firm with just 10 men We cover all areas from Glasgow. Edinburgh. Perth. Dundee Fife. Stirl...
Verified Pro
Composite Decking Glasgow was founded in 2008 and remains a family-operated venture. Our inception was driven by a singula...
Verified Pro
All garden work private contract professional qualified gardeners at competitive prices no job too small
Verified Pro
We have over 14 years experience I have my team / taking big or small jobs Available any time 24-7 make booking with u...

Recent Carpenter Enquiries

07 Dec

Garden | Decking

Troon - KA10

Enquiry from: Lorraine D

Start Date: Immediate

Decking at back door and some fencing

Post a similar request >

15 Apr

Garden | Sheds

Troon - KA10

Enquiry from: Cameron N

Start Date: Immediate

Hello, we are looking for a medium-sized timber storage shed for our back garden. We are just looking to get a feel for prices and to see what is available to us. Our garden is on a slope so it would ...

Post a similar request >

08 Mar

Garden | Sheds

Troon - KA10

Enquiry from: Jim L

Start Date: Immediate

looking to have a 10'X8' garden shed supplied and erected. Please quote total cost. Are you the property owner: Owner of the property Do you have a: Medium size garden What level of service are you lo...

Post a similar request >

27 Feb

Garden | Decking

Troon - KA10

Enquiry from: Tamara M

Start Date: Immediate

I would need an assessment of the garden decking I have in the backyard.I'd like to know what's the effort to restore it.

Post a similar request >

07 Jan

Kitchen | Fitting

Troon - KA10

Enquiry from: Charles D

Start Date: 1 to 3 months

Remove,build and fit Magnet kitchen, install sink, and working sufaces replumb appliances Are you the property owner: Owner of the property What level of service do you require: Install Only Are ...

Post a similar request >

05 Nov

Carpentry

Ayr - KA8

Enquiry from: Margaret S

Start Date: Immediate

Kitchen cabinets fitted to fit oven and microwave

Post a similar request >

23 Mar

Garden | Sheds

Irvine - KA11

Enquiry from: Dayle M

Start Date: Immediate

Looking for estimates and advice on having the back garden either partially or fully landscaped. As a minimum we are looking for an area to be levelled and fenced off with play bark put down as an are...

Post a similar request >

19 Jan

Kitchen | Fitting

Kilmarnock - KA2

Enquiry from: Linda M

Start Date: Immediate

L shaped kitchen worktops removed and replaced. One sink and one gas hob

Post a similar request >

31 Aug

Windows | Wooden | Repair

Irvine - KA12

Enquiry from: Christine L

Start Date: Immediate

wooden frame on window above entrance door rotting, would need wooden frame replaced. i am looking for a quote please. thanks are you the property owner: owner of the property property type: other wha...

Post a similar request >

01 Jul

Carpentry

Ayr - KA6

Enquiry from: Rosalind H

Start Date: Less than one month

kitchen finishing skirting and door facing replaced and doors hung are you the property owner: owner of the property what type of job are you looking to have done: other do you require a door(s): none...

Post a similar request >

12 May

Windows | Wooden | Repair

Ayr - KA7

Enquiry from: William C

Start Date: Immediate

replace a 'blown' double glazing unit in a hard wood kitchen window frame. frame is sound and in good order are you the property owner: owner of the property property type: detached what service are ...

Post a similar request >

14 Apr

Garden | Decking

Darvel - KA17

Enquiry from: Pat W

Start Date: Immediate

customer made an enquiry for wooden decking and confirmed on the quotatis site they would like quotes from a carpenter.mrs lives in the darvel area and would like a call to discuss options.see below d...

Post a similar request >

20 Jan

Kitchen | Fitting

Irvine - KA11

Enquiry from: Graham M

Start Date: Immediate

replace worktops and sink are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials for your kitchen already: yes a...

Post a similar request >

06 Sep

Garden | Decking

Kilmarnock - KA1

Enquiry from: Natalie R

Start Date: Immediate

customer made an online enquiry for wooden decking and confirmed on sms and email they would like a call with a landscaper to discuss prices.please call to arrange an appointment to quote. are you the...

Post a similar request >

12 Aug

Kitchen | Fitting

Prestwick - KA9

Enquiry from: Jacqueline K

Start Date: Immediate

fitting new kitchen units, extractor fan, sink, integrated washing machine/tumble dryer, dishwasher,fridge/freezer, double oven and gas hob. also need a wall removed. are you the property owner: own...

Post a similar request >

19 May

Garden | Sheds

Ayr - KA7

Enquiry from: George M

Start Date: Immediate

looking for a bird aviary thanks are you the property owner: tenant (with permission) what level of service are you looking for: supply, install do you have a: large garden please call to appoint

Post a similar request >

11 May

Garden | Decking

Irvine - KA12

Enquiry from: Allan D

Start Date: Immediate

looking for a general / approx quote for wooden decking in garden including prep and materials size - approx 135inches by 190 inches (11ft by 16ft) would imagine just slightly raised though can su...

Post a similar request >

09 Apr

Garden | Decking

Kilmarnock - KA1

Enquiry from: Rosie Y

Start Date: Immediate

miss requested quotes for wooden decking from a landscaper around kilmarnock. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information be...

Post a similar request >

03 Apr

Garden | Decking

Kilmarnock - KA1

Enquiry from: Joanne J

Start Date: Immediate

i have a wooden decking and around 5 of the boards have been damaged/begun rotting. im looking for someone to give me a quote to repair this. are you the property owner: owner of the property property...

Post a similar request >

20 Mar

Garden | Sheds

Irvine - KA12

Enquiry from: Ronnie F

Start Date: Immediate

Looking for Summerhouse 1*** pent roof in 22mm tongue and groove with double doors and windows to front al*** roof overhang

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Troon is:

£807

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Troon £975-£2,495
Carpenters and joiners in Troon £375-£575
Plasterboard dry lining in Troon £638-£978
Wood flooring in Troon £750-£1,150
Wooden decking in Troon £613-£1,363
Garden shed in Troon £275-£845
Wooden window repair in Troon £320-£480

Related Carpenter searches in Troon

Carpenter FAQs

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
Does my garden shed need a base?

Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Troon.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Troon?

View our open Carpenter jobs near you

Join today
View Shortlist