Find a Carpenter you can trust in Kilmarnock.

Choose from 50 Carpenters, all rated by people like you.

Over 42 reviews & an average rating of 4.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Webb Windows & Doors

0 review(s)
Offers services in KILMARNOCK
Webb windows and doors is a family run business based in Kilmarnock, Ayrshire . Our experienced staff will provide top q...
Verified Pro

K&D joinery

0 review(s)
Offers services in KILMARNOCK
We’re just a small building firm with just 10 men We cover all areas from Glasgow. Edinburgh. Perth. Dundee Fife. Stirl...
Verified Pro

Composite Decking Glasgow

0 review(s)
Offers services in KILMARNOCK
Composite Decking Glasgow was founded in 2008 and remains a family-operated venture. Our inception was driven by a singula...
Verified Pro
We have over 14 years experience I have my team / taking big or small jobs Available any time 24-7 make booking with u...
Verified Pro
All garden work private contract professional qualified gardeners at competitive prices no job too small

Recent Carpenter Enquiries

19 Jan

Kitchen | Fitting

Kilmarnock - KA2

Enquiry from: Linda M

Start Date: Immediate

L shaped kitchen worktops removed and replaced. One sink and one gas hob

Post a similar request >

05 May

Carpentry

Kilmarnock - KA3

Enquiry from: Patricia B

Start Date: Immediate

7 internal doors to be fitted also hinges, handles and are you the property owner: relative of owner what type of job are you looking to have done: wooden window/doors how many windows do you need: no...

Post a similar request >

06 Sep

Garden | Decking

Kilmarnock - KA1

Enquiry from: Natalie R

Start Date: Immediate

customer made an online enquiry for wooden decking and confirmed on sms and email they would like a call with a landscaper to discuss prices.please call to arrange an appointment to quote. are you the...

Post a similar request >

27 Apr

Garden | Decking

Kilmarnock - KA3

Enquiry from: Katie W

Start Date: Immediate

garden at the back has been abandoned for a few years apart from the odd grass cut - needs weeding and some tlc are you the property owner: tenant (with permission) property type: detached do you have...

Post a similar request >

09 Apr

Garden | Decking

Kilmarnock - KA1

Enquiry from: Rosie Y

Start Date: Immediate

miss requested quotes for wooden decking from a landscaper around kilmarnock. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information be...

Post a similar request >

03 Apr

Garden | Decking

Kilmarnock - KA1

Enquiry from: Joanne J

Start Date: Immediate

i have a wooden decking and around 5 of the boards have been damaged/begun rotting. im looking for someone to give me a quote to repair this. are you the property owner: owner of the property property...

Post a similar request >

11 Oct

Garden | Decking

Kilmarnock - KA3

Enquiry from: Angus R

Start Date: Immediate

are you the property owner: owner of the property property type: detached other forms: wooden decking agreed to receive quotes for selected products: yes please call to appoint

Post a similar request >

08 Oct

Carpentry

Kilmarnock - KA3

Enquiry from: Alan H

Start Date: Less than one month

a quote for the the following :- (i) replace six (6) x existing internal doors with 6 x fully finished oak sumerset oak veneered doors. (ii) fit all hinges, door handles and latches. (iii) remove all...

Post a similar request >

16 Sep

Garden | Decking

Kilmarnock - KA3

Enquiry from: Ian F

Start Date: Immediate

are you the property owner: owner of the property property type: semi detached other forms: wooden decking agreed to receive quotes for selected products: yes please call to appoint

Post a similar request >

21 Aug

Garden | Sheds

Kilmarnock - KA2

Enquiry from: Peter G

Start Date: Immediate

looking for a shed 10’x8’ with wide or double doors .pent roof and 1 or 2 windows.would like shed built if possible as i am disabled are you the property owner: tenant (with permission) what level...

Post a similar request >

24 May

Garden | Decking

Kilmarnock - KA3

Enquiry from: Christine B

Start Date: Immediate

are you the property owner: tenant (with permission) property type: other other forms: wooden decking agreed to receive quotes for selected products: yes please call to appoint what level of service ...

Post a similar request >

20 Apr

Garden | Decking

Kilmarnock - KA3

Enquiry from: Kaz A

Start Date: Immediate

I would like some decking to be put into the garden. not looking forward too much decking just enough to have a table chair st etc.

Post a similar request >

16 Apr

Garden | Decking

Kilmarnock - KA3

Enquiry from: James R

Start Date: Immediate

Are you the property owner: Owner of the property Property Type: Terrace Other Forms: Wooden Decking Agreed to receive quotes for selected products: Yes Please call to appoint What level of service do...

Post a similar request >

12 Apr

Garden | Sheds

Kilmarnock - KA3

Enquiry from: Karen O

Start Date: Immediate

20 ft 9ft with double doors and perhaps overhang roof thanks

Post a similar request >

01 Apr

Garden | Sheds

Kilmarnock - KA3

Enquiry from: Liz C

Start Date: Immediate

I would like an estimated price for 14x10 summerhouse.

Post a similar request >

04 Sep

Garden | Sheds

Kilmarnock - KA3

Enquiry from: Martin C

Start Date: Immediate

I need a quote for an 8x6 garden shed and has to have windows on each side if possible. Are you the property owner: Tenant (with permission) Do you have a: Medium size garden What level of service are...

Post a similar request >

01 Sep

Garden | Sheds

Kilmarnock - KA1

Enquiry from: Roy W

Start Date: Less than one month

8x6 apex shed What level of service are you looking for: Install, Removal of old Are you the property owner: Owner of the property Do you have a: Large garden Time scale: Less than one month Please ca...

Post a similar request >

02 Jul

Garden | Sheds

Kilmarnock - KA1

Enquiry from: Jim R

Start Date: Less than one month

I have a concrete base 9.5 foot x11.5 foot. I am looking for an 8x10 shed (wood) with double doors and a window Are you the property owner: Owner of the property Do you have a: Medium size garden Wha...

Post a similar request >

05 May

Garden | Sheds

Kilmarnock - KA3

Enquiry from: Douglas M

Start Date: Less than one month

10x8 garden shed, base and assembly Are you the property owner: Owner of the property Do you have a: Medium size garden What level of service are you looking for: Install Time scale: Less than one mon...

Post a similar request >

25 Apr

Carpentry

Kilmarnock - KA1

Enquiry from: Pervez K

Start Date: Immediate

1 x Single line Partition Standard single Glazed fire rated framed partitioning Layout: Inline wall partition Size: 2600mm height and 3800mm Wide To be installed on the ground floor ...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Kilmarnock is:

£807

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Kilmarnock £975-£2,495
Carpenters and joiners in Kilmarnock £375-£575
Plasterboard dry lining in Kilmarnock £638-£978
Wood flooring in Kilmarnock £750-£1,150
Wooden decking in Kilmarnock £613-£1,363
Garden shed in Kilmarnock £275-£845
Wooden window repair in Kilmarnock £320-£480

Related Carpenter searches in Kilmarnock

Carpenter FAQs

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How much does it cost to hang a door?

Check your Price's door installation cost calculator and charges guide will allow you to estimate both typical labours only costs for door hanging & installations, renovations and repairs as well as the total estimate for comprehensive door installation projects.

• Door & Frame Installation Job and the average Cost in £'s

• uPVC door installation including glazing & architrave costs around £90 per door

• uPVC french & patio door sets including glazing & architrave costs around £120 per pair

• Softwood french & patio door sets including architrave costs around £180 per door

• Hardwood french & patio door sets including architrave would cost around £250 per pair

• Softwood internal door hanging only would be around £40 per door

• Hardwood internal door hanging only would set you back around £48 per door

• Softwood external door hanging only is around £60 per door

• Hardwood external door hanging would cost around £70 per door

• Locks, letterboxes & door furniture timber doors are around £15 per Item

• Glazing £15 per pane

• Brick cut-outs single doors is around £60 per cut-out

• French or patio door brick cut-outs will be around £90 per cut-out

• New lintels will cost around £150 per lintel

Door Repair Costs and Charges

Estimate door mending labour charges by totalling the unit costs of the mandatory jobs. The complete door repair cost includes the total labour charge plus the cost of all parts, fixtures and fittings. A call out charge may be added on jobs totalling less than £100.

Average Cost of Door Repair Job

Replacement glazing units for uPVC doors will be around £15 per unit

Replacement glazing units for timber doors is around £20 per unit

Replacement door glass pined & putty will cost£30 per pane

Replacement handles are around £10 each and general repair work will cost you £25 per hour

Building & FENSA certificate charges

FENSA certificates are obligatory for maximum door replacements and new build setting up prices differ from council to council.

Average Cost of Window Repair Job: One to two doors will cost around £85

Average Cost of Door Fixtures & Fittings Removal Job

Removing internal doors will cost around £10

Removing internal door liners will cost around £15

Removing external timber doors will cost about £10

Removing External timber door frame will be around £20

Removing external uPVC door & frame removal will be around £30 and Rubbish disposal will cost £150 per ton.

What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Kilmarnock.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Kilmarnock?

View our open Carpenter jobs near you

Join today
View Shortlist