- Plan your shed base
You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
- A concrete base laid on hardcore
- Concrete slabs on sharp sand
- Treated wood beams on hardcore or shingle
- An interlocking plastic system
- Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
- Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
- Put up the shed walls
- Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
- Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
- Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
- Fit the roof
- If the shed comes with a support bar, put this in position before you put the roof panels in.
- Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
- Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
- Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
- Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
- Add the shed windows
- Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
- From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
- Fix the window beading on the top and sides with 25mm nails.
- Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
Find a Carpenter you can trust in Bridge Of Orchy.
Choose from 59 Carpenters, all rated by people like you.
Over 15 reviews & an average rating of 4.8/5 stars, you'll find the right pro
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Carpenters near you
K&D joinery
Composite Decking Glasgow
Extra mile cleaning services
Quality plastering
Glasgow Painters and Decorators
Mownngrown Garden Maintenance
How much do Carpenter services cost?
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceThe average price
of a Carpenter in Bridge Of Orchy is:
£807
Carpenter job | Carpenter cost in 2024 |
---|---|
Kitchen Fitting in Bridge Of Orchy | £975-£2,495 |
Carpenters and joiners in Bridge Of Orchy | £375-£575 |
Plasterboard dry lining in Bridge Of Orchy | £638-£978 |
Wood flooring in Bridge Of Orchy | £750-£1,150 |
Wooden decking in Bridge Of Orchy | £613-£1,363 |
Garden shed in Bridge Of Orchy | £275-£845 |
Wooden window repair in Bridge Of Orchy | £320-£480 |
Carpenter FAQs
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
Check your Price's door installation cost calculator and charges guide will allow you to estimate both typical labours only costs for door hanging & installations, renovations and repairs as well as the total estimate for comprehensive door installation projects.
• Door & Frame Installation Job and the average Cost in £'s
• uPVC door installation including glazing & architrave costs around £90 per door
• uPVC french & patio door sets including glazing & architrave costs around £120 per pair
• Softwood french & patio door sets including architrave costs around £180 per door
• Hardwood french & patio door sets including architrave would cost around £250 per pair
• Softwood internal door hanging only would be around £40 per door
• Hardwood internal door hanging only would set you back around £48 per door
• Softwood external door hanging only is around £60 per door
• Hardwood external door hanging would cost around £70 per door
• Locks, letterboxes & door furniture timber doors are around £15 per Item
• Glazing £15 per pane
• Brick cut-outs single doors is around £60 per cut-out
• French or patio door brick cut-outs will be around £90 per cut-out
• New lintels will cost around £150 per lintel
Door Repair Costs and Charges
Estimate door mending labour charges by totalling the unit costs of the mandatory jobs. The complete door repair cost includes the total labour charge plus the cost of all parts, fixtures and fittings. A call out charge may be added on jobs totalling less than £100.
Average Cost of Door Repair Job
Replacement glazing units for uPVC doors will be around £15 per unit
Replacement glazing units for timber doors is around £20 per unit
Replacement door glass pined & putty will cost£30 per pane
Replacement handles are around £10 each and general repair work will cost you £25 per hour
Building & FENSA certificate charges
FENSA certificates are obligatory for maximum door replacements and new build setting up prices differ from council to council.
Average Cost of Window Repair Job: One to two doors will cost around £85
Average Cost of Door Fixtures & Fittings Removal Job
Removing internal doors will cost around £10
Removing internal door liners will cost around £15
Removing external timber doors will cost about £10
Removing External timber door frame will be around £20
Removing external uPVC door & frame removal will be around £30 and Rubbish disposal will cost £150 per ton.
- Decking joists
- Coach screws
- Coach bolts
- Combi drill
- Socket set
- A saw suitable for your project and the thickness of the timber
- Pencil
- Decking preservative
- Sandpaper or sander
- Measure your deck frame and cut to size if necessary.
- Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
- Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
- Fit the coach screws with either a drill driver or socket and ratchet.
- Repeat the process for the inner joists once you’ve assembled the outer frame.
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
Carpenter help and advice
How it works
Tell us about your Carpenter project
Answer a few quick questions to help us match you with the right Carpenter
Get up to 4 free quotes
Receive no-obligation quotes from 4 Carpenters working in Bridge Of Orchy.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Carpenter.
Are you a Carpenter in Bridge Of Orchy?
View our open Carpenter jobs near you
Join today