Find a Carpenter you can trust in Brechin.

Choose from 38 Carpenters, all rated by people like you.

Over 8 reviews & an average rating of 4.2/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Pitch Perfect Laens

0 review(s)
Offers services in BRECHIN
Pitch Perfect Lawns are a specialised lawn care business covering Crieff, Perth, Auchterarder, Blairgowrie and surrounding...
Verified Pro

K&D joinery

0 review(s)
Offers services in BRECHIN
We’re just a small building firm with just 10 men We cover all areas from Glasgow. Edinburgh. Perth. Dundee Fife. Stirl...
Verified Pro
Landscaping business Fencing decking turf driveways paving
Verified Pro
Joinery plastering paintings and decoration tiles and bathrooms
Verified Pro
We at fifestonepaving are a committed workers that always try to give 100% satisfaction for all your landscaping needs we ...

Recent Carpenter Enquiries

03 Oct

Kitchen | Fitting

Brechin - DD9

Enquiry from: Sylvia S

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

new kitchen countertops and installation

Post a similar request >

12 Nov

Garden | Sheds

Brechin - DD9

Enquiry from: Lynn R

Start Date: Immediate

Hi, Do you still have sheds I can view at Padanaram? Thanks Lynn

Post a similar request >

24 Feb

Kitchen | Fitting

Brechin - DD9

Enquiry from: George K

Start Date: Immediate

Are you the property owner: Owner of the property Other Forms: 17, 63, 61 Agreed to recieve quotes for selected products: Yes Please call to appoint

Post a similar request >

09 Jul

Garden | Sheds

Brechin - DD9

Enquiry from: Peter E

Start Date: 1 to 3 months

small shed 6x8 with door and window. please also give cost of delivery and erection thank you.

Post a similar request >

18 May

Garden | Sheds

Brechin - DD9

Enquiry from: Eddie M

Start Date: Immediate

Garden shed 8x 6

Post a similar request >

20 Apr

Garden | Sheds

Brechin - DD9

Enquiry from: David S

Start Date: Immediate

I need to replace my existing shed which measures 6 ft x 8 ft . I would like a quote for a good quality 8 ft x 10 ft shed Regards David

Post a similar request >

30 Dec

Garden | Sheds

Brechin - DD9

Enquiry from: Colin T

Start Date: Immediate

Wooden shed approx 5'10 x 13', double, lockable doors one end, windows in one wall, Single slope roof (if possible), insulated (75mm - could do this myself).

Post a similar request >

01 Jul

Garden | Decking

Brechin - DD9

Enquiry from: Gareth S

Start Date: 1 to 3 months

Looking to get quotes for updating/replacing decking that is all ready there. Either in timber or if you have done decking in plastic boards for Maintenance free decking. Are you the property owner: O...

Post a similar request >

09 Feb

Windows | Wooden | Repair

Laurencekirk - AB30

Enquiry from: Margaret H

Start Date: Immediate

Hi I had new windows installed 2 years ago and there was some repairs to be done to the frames. There has been problems with water coming in through the frames. I am looking for a joiner to make...

Post a similar request >

15 Apr

Garden | Decking

Montrose - DD10

Enquiry from: Joe G

Start Date: Immediate

customer in montrose area has requested that we arrange quotes for their wooden decking project.mr are considering various options and would like to discuss with a carpenter directly.please call to di...

Post a similar request >

28 Feb

Garden | Sheds

Montrose - DD10

Enquiry from: ROY M

Start Date: Immediate

insurance quotes for shed repair or replacement storm damaged are you the property owner: tenant (with permission) do you have a: small garden what level of service are you looking for: supply, insta...

Post a similar request >

10 Nov

Garden | Sheds

Laurencekirk - AB30

Enquiry from: Hugh S

Start Date: Immediate

10 x 8 shed + erecting quote

Post a similar request >

27 Oct

Garden | Sheds

Arbroath - DD11

Enquiry from: George C

Start Date: Immediate

plain 6x4 with just a door (no window) are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: supply please call to appoint

Post a similar request >

08 Sep

Garden | Sheds

Forfar, Kirriemuir - DD8

Enquiry from: Edna G

Start Date: Immediate

quote for building and erection of small garden shed for mobility scooter

Post a similar request >

13 Apr

Garden | Decking

Arbroath - DD11

Enquiry from: Moira L

Start Date: Immediate

remove old decking and replace with new decking are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to appoint

Post a similar request >

27 Oct

Garden | Sheds

Forfar, Kirriemuir - DD8

Enquiry from: Avril S

Start Date: Immediate

Front and back door for house.

Post a similar request >

19 Sep

Garden | Sheds

Laurencekirk - AB30

Enquiry from: Jill P

Start Date: Immediate

i’d would appreciate a quote for a 8 x 7 pent shed with door on longest side. if 8x7 is not available could you quote for 8 x 6. thank you. are you the property owner: owner of the property do you ...

Post a similar request >

29 Aug

Garden | Sheds

Arbroath - DD11

Enquiry from: Tommy Y

Start Date: Immediate

hi there looking for a field shelter 10x14 or standard size you do on wooden skids so we can move due to planning laws in angus council no doors just an opening and no kick boards either as it’s to ...

Post a similar request >

30 Jun

Garden | Sheds

Laurencekirk - AB30

Enquiry from: Jean R

Start Date: Immediate

corner summerhouse 8x8, i'd like to paint it myself. solid base already done. are you the property owner: tenant (with permission)

Post a similar request >

28 Apr

Garden | Sheds

Arbroath - DD11

Enquiry from: Lynne M

Start Date: Immediate

I am looking for a garden shed approximat*** *** . Do you have a brochure/ price lust

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Brechin is:

£879

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Brechin £975-£2,495
Carpenters and joiners in Brechin £375-£575
Plasterboard dry lining in Brechin £638-£978
Wood flooring in Brechin £750-£1,150
Wooden decking in Brechin £1,125-£1,725
Garden shed in Brechin £450-£690
Wooden window repair in Brechin £320-£480

Related Carpenter searches in Brechin

Carpenter FAQs

How much does it cost to hire a carpenter?

Considerations

If you're thinking about making changes around your household that include working with wood, you ought to hire a local carpenter. Looking to fix a loose piece? Or looking for some drastic improvements? A carpentry expert might be the top choice.

General carpenters are expert woodsmen and know a variety of areas from grounds to gear. Maximum carpentry depends on a rudimentary set of skills which your worker may choose to build upon by specialising. For example, few carpenters have a talent for wood repair, building original constructions or manufacturing furniture.

Time

The extent of time it takes to complete a certain project is another consideration to be kept in mind. This is particularly essential if you are on a constricted timeline or dealing with time limitations. Most carpentry projects take about 13 hours to finish. Although, this is purely dependent on the intricacy of the project and the pre-arranged timeline you and your carpenter agree to.

The cost to hire a general carpenter in the UK amounts to £20 to £25 per hour on an average. Though, it is always imperative to speak with a professional in carpentry services about this.

General Carpentry Costs in the UK:

• National Minimum Cost is £20

• National Maximum Cost is £25

• The national average is around £22

Cost Comparison of Popular Carpentry Services in the UK (Average Hourly Rate):

• Furniture Refinishing is around £17

• A Cabinet Repair is around £23

• Finish Carpentry will set you back a minimum of £30

• General Carpentry is around £20

• Fine Woodworking is about £20

Carpentry is a brilliant method to improve your household and to help maintain its visual pleasantness. Finding a decent carpenter at the correct value is a vital area that needs undivided attention in terms of your project. Whether you're reinforcing your staircase or looking for a total renovation of the house that would change its look, a general carpenter will complete your project to the highest standards.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Brechin.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Brechin?

View our open Carpenter jobs near you

Join today
View Shortlist