Find a Carpenter you can trust in Peterculter.

Choose from 22 Carpenters, all rated by people like you.

Over 1 reviews & an average rating of 3.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Peterculter is:

£879

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Peterculter £975-£2,495
Carpenters and joiners in Peterculter £375-£575
Plasterboard dry lining in Peterculter £638-£978
Wood flooring in Peterculter £750-£1,150
Wooden decking in Peterculter £1,125-£1,725
Garden shed in Peterculter £450-£690
Wooden window repair in Peterculter £320-£480

Related Carpenter searches in Peterculter

Carpenter FAQs

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Peterculter.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Peterculter?

View our open Carpenter jobs near you

Join today
View Shortlist