House Extensions
West Bromwich - B71
Enquiry from: Tom E
Start Date: 1 to 3 months
homeowner house extension please call to appoint
-->
Over 117 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Builders near you
West Bromwich - B71
Enquiry from: Tom E
Start Date: 1 to 3 months
homeowner house extension please call to appoint
West Bromwich - B70
Enquiry from: Tony M
Start Date: Immediate
Trees lifting paving needs re instating 3 no. totem signs removed and paving re instating
West Bromwich - B71
Enquiry from: Tom E
Start Date: 1 to 3 months
customer in west bromwich area has requested that we arrange quotes for their house extension project.mr are considering various options and would like to discuss with a builder directly.please call t...
West Bromwich - B70
Enquiry from: Jag S
Start Date: Immediate
Partition in the garage, stud wall put up, reinforce the joists, insulate and put up plasterboard & board up the ceiling.
West Bromwich - B70
Enquiry from: Nicky S
Start Date: Immediate
we need a stud wall and plastered and 4 doors put in. are you the property owner: owner of the property
West Bromwich - B70
Enquiry from: Alan M
Start Date: Immediate
customer made an enquiry for house extension and confirmed on the quotatis site they would like quotes from a builder.mr lives in the west bromwich area and would like a call to discuss options.see be...
West Bromwich - B70
Enquiry from: Pravin P
Start Date: Immediate
Exterior rendering End Terrace House
West Bromwich - B71
Enquiry from: Amy W
Start Date: Immediate
top half of my house needs rendering, have been told it can be done over the top of what is currently there. not sure what type is best but just want it in pure white. are you the property owner: owne...
West Bromwich - B71
Enquiry from: Phil C
Start Date: Immediate
we had our bay rendered a few years ago but some of the rendering at the bottom has fallen off. it could be that the work needs to be done again. a video is available. thank you. are you the property ...
West Bromwich - B70
Enquiry from: Mohit B
Start Date: Immediate
4m x 4m single story extension. would need all aspects including planning permission and according to building guidelines time scale: immediate please call to appoint
West Bromwich - B71
Enquiry from: Jade A
Start Date: Immediate
i need a quote for a loft staircase (1bend in it) with someone to fit it. also a price on velum window fitting (without scaffolding). thank you are you the property owner: relative of owner property t...
West Bromwich - B70
Enquiry from: Binder K
Start Date: Immediate
customer in west bromwich areas is looking to do a couple of projects at the moment, and would like quotes for house extension.confirmed interest via sms and email at 04/10/2021 19:22.please call to a...
West Bromwich - B71
Enquiry from: Chi F
Start Date: Immediate
Need a flat roof insulation
West Bromwich - B71
Enquiry from: Paul W
Start Date: Immediate
Stud frame/ plaster for a false chimney breast
West Bromwich - B71
Enquiry from: Cliff W
Start Date: Immediate
are you the property owner: owner of the property property type: semi detached how many bedrooms do you have: 3-4 bedrooms property age: 1970-2000 interested in quote for cavity wall and loft insulat...
West Bromwich - B71
Enquiry from: Cliff W
Start Date: Immediate
are you the property owner: owner of the property property type: semi detached how many bedrooms do you have: 3-4 bedrooms property age: 1970-2000 interested in quote for cavity wall and loft insulat...
West Bromwich - B71
Enquiry from: Cliff W
Start Date: Immediate
to add insulation to existing one to make it 270mm thickness are you the property owner: owner of the property property type: semi detached how many bedrooms do you have: 3-4 bedrooms property age: 19...
West Bromwich - B71
Enquiry from: Marie K
Start Date: Immediate
are you the property owner: owner of the property property type: terrace what are you looking to convert the space into: bedroom/s are you looking to have stairs: yes do you require any windows: skyl...
West Bromwich - B71
Enquiry from: Robert L
Start Date: Immediate
need a 2 bedroomed loft conversion Are you the property owner: Owner of the property Property Type: Semi detached What are you looking to convert the space into: Bedroom/s Are you looking to have sta...
West Bromwich - B71
Enquiry from: Nigel F
Start Date: Immediate
Loft ladders fitting so an existing drop down hatch. Are you the property owner: Owner of the property Are you looking to have stairs: Yes Do you require any windows: None Do you require plumbing wor...
How much do Builders cost? Prices for Builders in 2024 can fluctuate relying on the sort of work that you need to have carried out in your residence.
Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.
First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.
The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.
View our Builder cost guide View our Builder adviceDriveway surfacing materials like concrete, asphalt and clay brick usually crack because they’ve been exposed to extreme temperatures or put under high pressure. It’s important to repair driveway cracks before they get worse and cause damage to vehicles and perhaps others to trip on raised cracks.
The holy grail of home extensions is basically the need for additional space for living as well as leisure. However, before commencing your home extension project, you’d probably want to know just how big your new building can be. In this article, you’ll find the answer to this question which is also frequently asked by many other home or property owners in the UK.
Besides your budget, there are two other major influencing factors that can determine just how much extra room that can be added. These factors include whether you wish to carry out the extension project under Permitted Development rights which is usually for a smaller project or you’d prefer to opt for a larger project which is covered by Planning Permission.
Apart from the limitations in the size of an extension under Permitted Development, the extensions are also a lot more affordable and consumes less time when compared to the extensions under planning permission. So what exactly is the size limit for an extension under Permitted Development and the ones under Planning Permission?
For a single storey extension, the maximum size that can be constructed without having to submit an application for Planning Permission includes:
• An extension should have a maximum length of 6m, if you reside in a terraced home or a semi-detached property.
• Extensions for detached properties can have a maximum length of 8m.
• The extension built must not go beyond half your garden’s area.
• The extension should have a maximum height of 4 metres, but in the event whereby the extension is situated within 2 metres of the boundary of your property, it should not exceed a height of 3 metres.
• The extension should not be higher than the highest part of the existing house’s roof.
If you’re about to carry out a loft conversion project, you’d probably be wondering how long it’ll take to complete the task. Well, you’re not alone! This is one of the most common questions when it comes to loft conversion projects, however, providing a set timeframe for completion of such projects is impossible as all loft conversions vary. There are different factors that can determine the duration of your project. These factors include, the materials to be used, the type of the proposed loft conversion, the kind of staircase you’ll like to have installed, the number of windows included, the number of rooms to be added as well as a number of other influencing factors. As a result of these variables, the milestones and timings provided are only to be taken as guidelines. If you’d really like to have a set date, you can get in touch with a professional for help.
Generally, it’ll take up to 8 weeks to complete a loft conversion project.
✓ The first week activities will include putting up scaffolding, receiving the first materials for the build and creating an opening in the roof to gain access to the loft space.
✓ In the second week, the structure of the roof will be ammended and more support added.
✓ Third week, the floor joists will be fitted, building of the loft conversion will start, completion of the external roof works and commencement of plumbing and electric works.
✓ Fourth week, complete the building, construct the loft floor, fit the roof windows, insulation, ventilation and internal stud walls.
✓ Fifth week, apply plaster and plasterboard to the room walls, create a staircase opening and fit the new staircase.
✓ Sixth week, plaster the staircase area, complete plumbing and electrical works, hang the doors, fit skirting, handrails and bannisters and start decoration.
✓ Seventh week, complete the decoration and clean and wipe out all wastes.
✓ Eight week, complete all the remaining tasks.
How long it takes to install insulation will depend on the size of your property. In general, loft and cavity wall insulation can be installed in a day or two. External wall insulation will usually take longer to install. The rep or installer will be able to advise you when quoting for the job how long this will be.
Are you looking to pebble dash your house? This is a cool way to add a stunning new look to your home or property while also adding to its resale value should you wish to sell later on. The list of the benefits goes on, however one thing that most home and property owners would like to know before starting such a project is exactly how long it’ll take to complete it. If you’re also having similar thoughts, then you’ve come to the right place! In this post we’re going to give you an insight into the duration of pebble dashing a house. Let’s take a look!
First and foremost, just like any other home improvement project, the duration of a house pebble dashing project is affected by a number of variables. These variables include the size of your house, the company or contractor hired and lots more. In general, a house pebble dashing project should take within the range of 3 to 14 days depending on the size of your home. It should be noted that you’ll have to pay the workers on a daily basis. Most labourers will charge within the range of £140 to about £160 per labourer per day. And you should expect to have at least 2 labourers to work on your house’s pebble dashing project per day. On the other hand, the more labourer you have working on your project, the more you’re going to pay on a daily basis but this will also significantly reduce the time frame it’ll take to get the project over the line.
It shouldn’t do. Most companies will do all the interior work first, and the last job to do will be creating the opening from the house to the conversion. A reputable company will make sure they cause as little disruption as possible during this time.
When thinking about the right insulation material for your loft, some of the first few things that comes to mind is the various properties of that material as well as how good they fit with your home’s needs.naturally, you’d like to ensure that the insulation will be efficient enough to add to the overall energy efficiency of your home, however there are also other features that may not get as much attention but also happens to be equally important. As the primary function of an insulation is to blanket your house to offer a barrier against heat loss, going for an insulation material that’s also fireproof is crucial as loft insulation can burn. Although most insulation materials are fireproof, a myriad of problems can actually make your insulation burn.
For instance, fibreglass insulation is produced using glass combined with plastic polymers and is naturally resistant to fire. However, even at that you’d have to be careful with batts that are supported with foil or paper due to the fact that these materials can burn pretty quickly. Cellulose, on the other hand, is not fireproof and is required to be treated by other flame retardants in order to help reduce combustion. Some of the best insulation materials that are resistant to fire includes the following:
If you’re considering rendering your house or property, then you’d most likely want to know whether or not applying for a planning permission will be needed. In several cases, planning permission will not be required for the maintenance, repair as well as replacement of the existing render on your building. These activities are covered by what’s called “Permitted Development Rights, which allows you to carry out some activities without having to apply for a planning permission but always subject to following some strict guidelines. For rendering, as long as the material (render) possesses an identical appearance to those existing on the house as well as same colour, then you will not require a planning permission. However, there are a number of projects that have been highlighted in which a planning permission would be required. These includes the following:
✓ Re-rendering in a colour that different from the original one used on the house or building.
✓ Rendering over brickwork which was not originally covered.
✓ Rendering over pebbledash
✓ Removing pebbledash and replacing it with render.
Another exception to the Permitted Development rights are for houses in conservation areas, national parks or areas of outstanding national beauty.
Although, you wouldn’t normally require to submit a planning application for approval before you apply render, but in truth it’s actually a bit of a grey area which isn’t totally clear and doesn’t allow for much freedom or creativity. And due to this fact, homeowners who wants an absolute peace of mind may opt to apply for planning permission just in case. It’s also worth noting that whether or not a planning permission is required, a huge rendering work will need to comply with building regulations which includes the need to insulate walls on the inside or outside as part of the work on several older properties .
Answer a few quick questions to help us match you with the right Builder
Receive no-obligation quotes from 4 Builders working in West Bromwich.
Compare prices, customer reviews and services, and hire the right Builder.
View our open Builder jobs near you
Join today