Find a Builder you can trust in Golspie.

Choose from 4 Builders, all rated by people like you.

Over 0 reviews & an average rating of 0/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Builders near you

View Shortlist

Recent Builder Enquiries

30 Jul

Building work | Refurbishment

Golspie - KW10

Enquiry from: Tracy S

Start Date: 1 to 3 months

a bathroom fitting upstairs as only have a shower room downstairs. an opening/ doorway putting in to an internal wall. a doorway putting in what used to be an external wall. radiators moving x2. ar...

Post a similar request >

14 Sep

Insulation | Cavity Wall

Tain - IV20

Enquiry from: Katie M

Start Date: Immediate

ms requested quotes for cavity wall insulation from a builder around tain. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below...

Post a similar request >

03 Jun

Driveway Repair

Rogart - IV28

Enquiry from: Jess M

Start Date: Immediate

External wall insulation Lead External wall insulation Lead

i would like my garage floor outside where the car drives in repaired or renewed are you the property owner: owner of the property property type: detached what level of service do you require: repair...

Post a similar request >

05 May

Insulation | Cavity Wall

Dornoch - IV25

Enquiry from: Marelle S

Start Date: Immediate

ms requested quotes for cavity wall insulation from a builder around dornoch. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information be...

Post a similar request >

05 May

Insulation | Loft / Roof

Dornoch - IV25

Enquiry from: Marelle S

Start Date: Immediate

customer made enquiry for loft & roof insulation quotes online. confirmed interest via phone at 11:20 homeowner lives in dornoch area. please call to arrange appointment are you the property owner: o...

Post a similar request >

16 Mar

Building Work | Porch

Tain - IV19

Enquiry from: John W

Start Date: Immediate

Are you the home owner of that property? homeowner Are you replacing an existing porch or is this a new build? New build What material do you require, UPVC? UPVC What colour do you want it to be? Whit...

Post a similar request >

23 Feb

House Extensions

Helmsdale - KW8

Enquiry from: Susan R

Start Date: 1 to 3 months

A 2 level side extension. Are you the property owner: Owner of the property Property Type: Detached Would you like the windows supplied and installed: Yes Do you require Electrical Work: Yes Time scal...

Post a similar request >

14 Apr

House Extensions

Dornoch - IV25

Enquiry from: Sinclair M

Start Date: Less than one month

Customer is currently in the process of looking for quotes to add a Double storey extension to their property. Are you the property owner: Owner of the property Property Type: Other Looking For: Doubl...

Post a similar request >

18 Feb

Insulation | Cavity Wall

Brora - KW9

Enquiry from: Mrs B

Start Date: Immediate

Bought a 3-bed semi property and need a quote on cavity wall insulation. Not sure what type- needs further explanation. Are you the property owner: Owner of the property Property Type: Semi detached H...

Post a similar request >

08 Oct

House Extensions

Ardgay - IV24

Enquiry from: Simon W

Start Date: 1 to 3 months

Are you the property owner: Owner of the property Property Type: Semi detached Looking For: Double storey extension Do you have planning permission: No Do you have plans drawn up: No Do you require Pl...

Post a similar request >

12 May

Insulation | Cavity Wall

Brora - KW9

Enquiry from: Helene K

Start Date: Immediate

Cavity wall insulation boiler replacement nest/home smart metre Are you the property owner: Owner of the property Property Type: Detached How many bedrooms do you have: 3-4 Property Age: 1930-70 Are...

Post a similar request >

18 Jan

Conversion | Garage

Tain - IV20

Enquiry from: Michelle M

Start Date: 1 to 3 months

Homeowner Please contact to appoint

Post a similar request >

29 Nov

House Extensions | Single Storey

Dornoch - IV25

Enquiry from: Dave M

Start Date: Immediate

Customer is currently in the process of looking for quotes to add a Single storey extension to their property. Are you the property owner: Owner of the property Property Type: Semi detached Looking Fo...

Post a similar request >

29 Nov

House Extensions

Dornoch - IV25

Enquiry from: Dave M

Start Date: Immediate

Single Storey pitched roof extension described as dayroom to include utility area, shower room with toilet and wash hand basin. Exterior dimensions 4.0mtr width along house x length 6.0 away from hous...

Post a similar request >

26 Jul

Insulation | Loft / Roof

Helmsdale - KW8

Enquiry from: Keith C

Start Date: Immediate

Loft insulation

Post a similar request >

17 May

House Extensions | Single Storey

Helmsdale - KW8

Enquiry from: Rod M

Start Date: Immediate

Customer is currently in the process of looking for quotes to add a Single storey extension to their property. Are you the property owner: Owner of the property Property Type: Detached Looking For: Si...

Post a similar request >

17 May

House Extensions

Helmsdale - KW8

Enquiry from: Rod M

Start Date: Immediate

Two rooms to be added to end of building and 1 x Dressing rm 21m x 3m & 1 x room 4m x 3 added to back wall of existing building. Wood frame with wood cladding finish.Planning permission granted. Cust...

Post a similar request >

22 Nov

Insulation | Cavity Wall

Tain - IV20

Enquiry from: Victoria S

Start Date: Immediate

Quote for cavity wall insulation..! Is it suitable for my property..? Need advice..ThanksVicki-Wall Insulation - Cavity Wall Insulation

Post a similar request >

16 May

New Build | Residential

Rogart - IV28

Enquiry from: Hamilton E

Start Date: Immediate

New Build 4 bed 1and half story dwelling slate roof render and stone cladding finish

Post a similar request >

30 Mar

House Extensions

Tain - IV20

Enquiry from: Stephen L

Start Date: Immediate

Bedroom with en-suite

Post a similar request >

How much do Builder services cost?

How much do Builders cost? Prices for Builders in 2024 can fluctuate relying on the sort of work that you need to have carried out in your residence.

Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.

First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.

The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.

View our Builder cost guide View our Builder advice

The average price
of a Builder in Golspie is:

£23,840

Builder job Builder cost in 2024
Garage conversion in Golspie £4,500-£6,900
Loft conversion in Golspie £18,750-£28,750
House extensions in Golspie £42,000-£68,000
Loft insulation in Golspie £450-£690
Upvc or wood porch in Golspie £2,625-£4,025
Barn conversions in Golspie £112,500-£172,500
Basement renovation in Golspie £30,000-£46,000
Bedroom fitting in Golspie £1,500-£2,300
Bricklayers in Golspie £300-£460
Cavity wall insulation in Golspie £400-£820
Commercial new builds in Golspie £105,000-£161,000
Conservatory base in Golspie £675-£1,035
Building maintenance in Golspie £2,250-£3,450
Building insurance works in Golspie £2,250-£3,450
Pebble dashed walls in Golspie £2,000-£9,200
Plasterboard dry lining in Golspie £638-£978
Residential new builds in Golspie £105,000-£161,000
Restoration and refurbishment in Golspie £37,500-£57,500
Roof insulation in Golspie £7,500-£11,500
Underpinning in Golspie £2,250-£3,450
Wall cladding in Golspie £1,125-£1,725
Wall rendering in Golspie £3,750-£5,750
Demolition in Golspie £2,440-£3,660
Roof room in Golspie £15,000-£23,000
Shop refurbishment in Golspie £3,750-£5,750
Single storey house extension in Golspie £23,200-£34,800
Soundproofing in Golspie £900-£1,380
Driveway repair in Golspie £1,520-£2,280
Garden room in Golspie £6,400-£9,600
External wall insulation in Golspie £6,000-£15,000

Related Builder searches in Golspie

Builder FAQs

how long does a loft conversion take?

If you’re about to carry out a loft conversion project, you’d probably be wondering how long it’ll take to complete the task. Well, you’re not alone! This is one of the most common questions when it comes to loft conversion projects, however, providing a set timeframe for completion of such projects is impossible as all loft conversions vary. There are different factors that can determine the duration of your project. These factors include, the materials to be used, the type of the proposed loft conversion, the kind of staircase you’ll like to have installed, the number of windows included, the number of rooms to be added as well as a number of other influencing factors. As a result of these variables, the milestones and timings provided are only to be taken as guidelines. If you’d really like to have a set date, you can get in touch with a professional for help.

Generally, it’ll take up to 8 weeks to complete a loft conversion project.

✓ The first week activities will include putting up scaffolding, receiving the first materials for the build and creating an opening in the roof to gain access to the loft space.

✓ In the second week, the structure of the roof will be ammended and more support added.

✓ Third week, the floor joists will be fitted, building of the loft conversion will start, completion of the external roof works and commencement of plumbing and electric works.

✓ Fourth week, complete the building, construct the loft floor, fit the roof windows, insulation, ventilation and internal stud walls.

✓ Fifth week, apply plaster and plasterboard to the room walls, create a staircase opening and fit the new staircase.

✓ Sixth week, plaster the staircase area, complete plumbing and electrical works, hang the doors, fit skirting, handrails and bannisters and start decoration.

✓ Seventh week, complete the decoration and clean and wipe out all wastes.

✓ Eight week, complete all the remaining tasks.

What qualifications should a builder have?

Some individuals who have been in the construction department for many years may not be qualified, that is, they may not have undergone an apprenticeship and/or trade certificate courses, but they might still be very skilled at their work. However, anybody can pick up a sledgehammer and demand themselves a builder lacking any skills or training. The wise thing would be to ask the builder coming to your house about what qualifications they have and what training they have undergone.

Licensing of building practitioners

You can now check if your builder or tradesperson is a licensed building practitioner by using an electronic public register which has a record of every registered builder. Being licensed provides you with an assurance that the builder who is about to do your work has proven his shill to the government and earned his right to be a practitioner. If you wish for certain important building and design work on your home it is imperative that you hire a licensed practitioner, the act is very common when you compare the scenario with when you have to call a plumber or an electrician regarding any work.

In order to become a builder in the UK, you must complete an apprenticeship or an NVQ. NVQ is another popular route to becoming a builder. You can also get your NVQ even when you are working as an apprentice. You can also make it based on any recognised overseas qualification.

All associates maintain a Code of Practice and Conduct which sets the standards for all stages of the building procedure. The Code requires builders to:

• Submit quotes on projects for which they have time.

• Securing the contract with a sufficient insurance cover.

• Maintain honesty and integrity at all times.

• Obey the law and industry standards of conduct.

All members of the construction association must also follow a code of conduct. As a consumer, if you think your builder has breached the Code of Conduct or the Code of Ethics, you can file a written against him or her.

how much do roof rooms cost?

How Much Do Roof Rooms Cost?

The price of your roof room may vary depending on your location within the country. Other factors that can also play a key role in determining the price of a roof room includes the conversion’s type as well as the legal and technical issues it’s currently facing. Usually, the cost of roof rooms will range between £1,200 to £2,000 per square metre. The differences in the price per square metre is influenced by the size of the alterations to the roof, the type of roof room to be constructed, the access, location as well as the finishing type.

• DORMER LOFT CONVERSION.

Here, one of the slopes of a pitched roof is substituted for a box-shaped structure. The outcome is a flat roof space which enables the fitting of full sized windows as well as the incorporation of several appliances. This is quite expensive as it involves a total rebuilding of one roof pitch alongside the complete internal works that are associated. The average cost of a standard dormer loft project will range between £25,000 to £50,000.

• HIP TO GABLE LOFT CONVERSION

Here a vertical brick wall is used to substitute the roof’s slope at the ending part of the terrace on detached buildings. The average cost of this type of roof room will range between £32,000 to £60,000.

• ROOFLIGHT LOFT CONVERSION

This basically involves fitting rooflight windows in the roof. Other improvements include flooring, plasterboarding, strengthening of the existing floor, as well as installation of rooflights. The average cost of this type of roof room will range between £15,000 to £25,000.

• MANSARD LOFT EXTENSION

This roof room can create an extra storey on top of an existing building as it makes a space featuring two or four external walls that are a bit sloped. The average cost of this type of roof room will range between £40,000 to £70,000.

how to repair rendering on wall?

Did you try rendering a wall but it doesn’t turn out the way you would have hoped for? Or perhaps you’ve been watching your wall render gradually deteriorate over time. Regard of your purpose, learning how to repair render cracks on wall is usually a great skill to have with your home maintenance in mind. However, whenever these crack are too large or difficult, we’d recommend you call in a reliable professional who can guarantee the best results for help. In this guide, we’re going to take you through the wall render repairing process. Let’s have a look!

No matter how solid a building material is, over time it’ll yield to the elements. When it comes to wall rendering it may be a case of too much sunshine or a costly mistake in the application process, but in truth, it cracks just because it cracks.

In order to repair render cracks, you’d have to start with a removal of damaged or cracked render. You’ll have to remove all the render or just a small section depending on the area you’re working on. If you’re able to clean all of the existing render as well as the paint over it all (both old and new), then removing a small section would work better as it makes it look neat and redone. Upon the removal of the existing render, the next important step would be to remove all loose material as well. Once done, you can then leave for up to 2 days to allow any trapped moisture to come out. Unfortunately, if the rains you’d have to wait till that dries too before you proceed.

Once dried, you can buy a pre-prepared render mix which already contains cement, lime and sand. Mix a 20kg bag with 4 litres of water (or check the product instructions and follow strictly), the mix to a fine consistency. Render is quick to dry, so you’d want to apply within 30 minutes of mixing. Make use of a trowel to apply the render on the affected spots and blend with the surrounding area.

how long does it take to pebble dash a house

Are you looking to pebble dash your house? This is a cool way to add a stunning new look to your home or property while also adding to its resale value should you wish to sell later on. The list of the benefits goes on, however one thing that most home and property owners would like to know before starting such a project is exactly how long it’ll take to complete it. If you’re also having similar thoughts, then you’ve come to the right place! In this post we’re going to give you an insight into the duration of pebble dashing a house. Let’s take a look!

First and foremost, just like any other home improvement project, the duration of a house pebble dashing project is affected by a number of variables. These variables include the size of your house, the company or contractor hired and lots more. In general, a house pebble dashing project should take within the range of 3 to 14 days depending on the size of your home. It should be noted that you’ll have to pay the workers on a daily basis. Most labourers will charge within the range of £140 to about £160 per labourer per day. And you should expect to have at least 2 labourers to work on your house’s pebble dashing project per day. On the other hand, the more labourer you have working on your project, the more you’re going to pay on a daily basis but this will also significantly reduce the time frame it’ll take to get the project over the line.

Are pumps used for basement conversions noisy?

If your basement has a cavity drain membrane, it’ll need a pump to move water away from the exterior of your basement and prevent flooding.

Sump pumps can be noisy, but they don’t have to be. Generally, if you have a well-designed pump that’s installed correctly, you shouldn’t find it a problem. For best results, hire a skilled, experienced professional to supply and install your drainage system.

Can my loft be converted?

Many types of loft are suitable for a loft conversion. In general, you will need at least 2.3 metres of headroom in your existing loft. This is to make sure there is enough headroom after the conversion. Speak to a conversion specialist about the probability and possibility of doing this in your house.

How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

Builder help and advice

How it works

Tell us about your Builder project

Answer a few quick questions to help us match you with the right Builder

Get up to 4 free quotes

Receive no-obligation quotes from 4 Builders working in Golspie.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Builder.

Are you a Builder in Golspie?

View our open Builder jobs near you

Join today
View Shortlist