How much do Builders cost? Prices for Builders in 2025 can fluctuate relying on the sort of work that you need to have carried out in your residence.
Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.
First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.
The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.
View our Builder cost guide View our Builder adviceWhen Does A Loft Become A Habitable Room?
When a loft is being converted to functional space, there are a multiple options it can offer. It’s not uncommon that at the conversion of this space, many household may not have a specific plan on how it’s going to be used. However, they know later on an actual need might arise, perhaps as you start working from home, developing other hobbies that requires an extra space or the family grows.
The loft can easily be converted into a game room, study room, playroom or even a household’s “breathing space etc. However, when the family grows and you wish to make use of the space on the top of your home as an extra bedroom, there are many factors to consider. The fact is, just because there’s enough space to fit a bed, doesn’t make it habitable. For a loft to become habitable, it must be built specifically for the purpose of being a sleeping area and must also comply with the relevant building regulations. It’s as a result of this, many property sale particulars include “potential third bedroom, subject to regulations statement written on it as well as the boarded and insulated loft space’s dimensions.
Loft conversions building regulations are set in such a way to ensure that adequate attention is given to both safety and structural elements to build a new space that’s fit for undetermined household use. These regulations are established minimum requirements to guarantee the following:
• The new floor and ceiling’s structural integrity.
• The existing roof and party wall modification’s structural stability.
• Safety during fire incidents plus an escape route.
• An appropriate stairway access.
• The proposed changes’ structural suitability to the external environment in association with the local area as well as any unique factors specific to the property.
Typically, loft conversions do not require planning permission except in certain situations. They’re usually covered under what’s known as Permitted Development. Certain building works like loft conversion, rear extension and conservatories are granted planning permission by local authorities. Permitted Development, however, gives you a free range to improve your home without having any issues from the councils or regulations. Before your planned loft conversion can be covered under Permitted Development, there are some certain criteria that must be met. This criteria includes the following:
✓ The extension must not go beyond the existing slope of the roof at the front of the house.
✓ The loft space converted must not go beyond 40 cubic metres in a terraced house.
✓ The roof’s height must not be increased by the extension.
✓ The loft space converted must not reach beyond 50 cubic metres in a detached or semi detached house.
✓ The plan for the extension mustn’t involve structures like balconies, verandas or anything other structures of this nature.
✓ The roof extension should be positioned as far back as possible or at least 20cm from the existing eaves.
✓ The side that faces the window openings should be at least 1.7m beyond the floor and the windows should also be obscured.
✓ The roof extension must not overhang the existing roof or wall of the house.
✓ The materials that are to be used must be similar or the same to the materials that has already been used on the house’s exterior.
However, you should bear in mind that there are some properties that are exempt from Permitted Development. Examples of these type of properties include conservation areas, Areas Of Outstanding Natural Beauty and World Heritage sites. Permitted Development does not also provide coverage for listed buildings.
It can be very hurtful when you’re looking to get a house and then identifies one that’s almost perfect, but that one thing that’s lacking is significant enough to prevent you from making an offer. For instance, you may like neighbourhood, the lot’s size, the number of bedroom and lots more. However, the only thing that’s holding you from making an offer is the outdated kitchen. This is the point where you wonder whether a mortgage can include the cost of renovation. In this article, we’re going to give you a good insight into this and more. Let’s have a look!
One of the major things your lender will put into consideration when you apply for a mortgage is the price of the property in question. For instance, so you’ve found your “almost perfect home for let’s say £400,000 and the cost of your intended renovation work runs up to about £150,000. In this event, you’re definitely going to find lenders who wouldn’t be too keen to let go of their cash. And that’s mainly due to the fact that lenders are only able to afford you, at best, 95 percent of the purchasing price. In other words, if you really want the house, you’ll have to finance it yourself no matter how much potential you think the house possesses.
This, however, does not mean that you can’t find some mortgage lenders who’ll allow for building costs. They exist, but this will mostly take place when the work is complete and the property is revalued. You may also be lucky enough to get a purchase plus improvements mortgage which allows you to renovate now and pay off the renovations over time at a better interest rate than other loan types.
If you’re planning to build a small extension on your property, you’ll most likely want to know the length of time it’ll take to complete the home extension. Just like many other home improvement projects, it’s impossible to provide a specific number of day in which your project will be completed as the duration is based on a number of influencing factors. This includes the size of the development work as well as whether or not you plan to live in the house when the work is being done. In this article, we’re going to give you a breakdown of the processes that’s involved in building a small single storey extension alongside the duration for each so you can have an idea of how long your small extension project will take. Let’s take a look!
✓ A small single storey extension will normally take about 3 months to be completed.
✓ Site preparation is the first step in the process and it’ll take up to 2 weeks the dig out the footings and prepare foundations. Followed by a further 2 weeks to fit the damp course as well as any drains required around the extension.
✓ The 5th week is spent on working on the external walls and putting in place blockwork to deliver cavity wall insulation.
✓ The next 2 weeks will be spent on installing the roof structure as well as internal walls.
✓ Once done. The builders will make the structure weather proof and electricians or gas fitters will be on site to add power to the extension. This will be followed by internal walls’ plastering as well as breaking into your main house.
✓ After this, when the plaster is dry and decoration completed, units or furniture will then be installed.
Cavity wall insulation is basically the process of installing an insulating material between the two layers of brick making up a cavity wall, either as a retrofit measure or at the time of building. Obviously this is not a choice if you have solid wall, but for those who do possess a cavity wall, it represents an opportunity you may not want to let slide as it is a worthwhile and affordable wall insulation option. Clearly, cavity wall insulation will make your home or property feel warmer, but it also does come with a range of other benefits which is why we’d recommend installing it. In this post, we’re going to look at a number of reasons why having a cavity wall insulation done is a good idea.
Did you try rendering a wall but it doesn’t turn out the way you would have hoped for? Or perhaps you’ve been watching your wall render gradually deteriorate over time. Regard of your purpose, learning how to repair render cracks on wall is usually a great skill to have with your home maintenance in mind. However, whenever these crack are too large or difficult, we’d recommend you call in a reliable professional who can guarantee the best results for help. In this guide, we’re going to take you through the wall render repairing process. Let’s have a look!
No matter how solid a building material is, over time it’ll yield to the elements. When it comes to wall rendering it may be a case of too much sunshine or a costly mistake in the application process, but in truth, it cracks just because it cracks.
In order to repair render cracks, you’d have to start with a removal of damaged or cracked render. You’ll have to remove all the render or just a small section depending on the area you’re working on. If you’re able to clean all of the existing render as well as the paint over it all (both old and new), then removing a small section would work better as it makes it look neat and redone. Upon the removal of the existing render, the next important step would be to remove all loose material as well. Once done, you can then leave for up to 2 days to allow any trapped moisture to come out. Unfortunately, if the rains you’d have to wait till that dries too before you proceed.
Once dried, you can buy a pre-prepared render mix which already contains cement, lime and sand. Mix a 20kg bag with 4 litres of water (or check the product instructions and follow strictly), the mix to a fine consistency. Render is quick to dry, so you’d want to apply within 30 minutes of mixing. Make use of a trowel to apply the render on the affected spots and blend with the surrounding area.
A double house extension is basically a construction to any aspect of your house that elevates up to offer two floors of space. It can be structured to suit your existing home in two storeys or as a side wing on a taller property. If you’re considering building a double house extension, then estimating the cost is a very important task to do before commencing the project. In this article, we’ll give you an idea of the cost of a double house extension so you can estimate yours accordingly.
The double house extension cost depends on several factors that’s specific to your home as well as your design choice. These includes:
• Location of your property. Places like London and the southeast will generally cost more than the other regions due to higher demands.
• Accessibility of the site. The ease of your site’s accessibility also plays a key role in the price.
• Size of the extension. The more the extension’s size in footprint and square metres, the higher the possible costs.
• Materials used in making the roof as well as the complexity of the roof design.
• Your choice of finishing. These includes flooring window and door frames, glazing, underfloor heating and roof lights.
• Your property’s soil type. Different types of soil requires varying treatments as well as materials to develop solid foundations.
Constructing a double house extension is a quite simple build in terms of technicality when its to the side or rear of your house as this can also help you save some money. Generally, considerably expanding your home’s space by building a double house extension will cost within the range of £1,500 per m2 to about £2,800 per m2.
If you’ve converted a non-residential barn into a home, you might be able to reclaim some of the VAT that you’ve paid for your project. This includes money spent on:
• Construction materials
• Flooring
• Light fittings
• Kitchen units and worktops
• Electrical, heating and plumbing materials
To reclaim your VAT from HMRC, make sure you request and keep all of your invoices. You’ll also need proof of planning permission and evidence of completion. You should then submit your claim with all relevant paperwork within three months of receiving your completion certificate. You’re only allowed to submit one claim, so you’ll need to make sure you get it right first time.
Answer a few quick questions to help us match you with the right Builder
Receive no-obligation quotes from 4 Builders working in Glenfinnan.
Compare prices, customer reviews and services, and hire the right Builder.
View our open Builder jobs near you
Join today