Bedroom | Fitted Wardrobe
Goodwick - SA64
Enquiry from: Claire J
Start Date: Immediate
Looking for a built in wardrobe with a tv built in the middle. It is slanted walls
-->
Over 52 reviews & an average rating of 4.3/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Builders near you
Goodwick - SA64
Enquiry from: Claire J
Start Date: Immediate
Looking for a built in wardrobe with a tv built in the middle. It is slanted walls
Goodwick - SA64
Enquiry from: Peter J
Start Date: Immediate
quote for cavity wall insulation for large detached house are you the property owner: relative of owner property type: detached how many bedrooms do you have: 5+ property age: 1900-30 are you in a co...
Goodwick - SA64
Enquiry from: D L
Start Date: Less than one month
Cavity wall insulation of back of the house Are you the property owner: Owner of the property Property Type: Semi detached How many bedrooms do you have: 1-2 Property Age: 1930-70 Are you in a ...
Goodwick - SA64
Enquiry from: Jayne C
Start Date: Immediate
Corrugated roof is slightly rusty with a few small holes, letting in water. one wall very wet. The beams holding it up will probably need replacing Are you the property owner: Owner of the propert...
Haverfordwest - SA62
Enquiry from: Heather J
Start Date: Immediate
A small rear loft needs insulation
Haverfordwest - SA62
Enquiry from: Cherry F
Start Date: Immediate
wall rendering metre finished with terylene. are you the property owner: owner of the property property type: detached how many bedrooms do you have: 3-4 bedrooms how many walls are you looking to ha...
Haverfordwest - SA62
Enquiry from: Deepak V
Start Date: Immediate
External wall insulation
Haverfordwest - SA62
Enquiry from: Anwen C
Start Date: Immediate
Cavity wall insulation inspection
Fishguard - SA65
Enquiry from: Owen B
Start Date: Immediate
Advice to prevent condensation in attic, causing damp on bedroom ceiling.
Haverfordwest - SA61
Enquiry from: Heather C
Start Date: Immediate
need sound proof test certs for building regulations for 2 converted flats from 1 x office.
Haverfordwest - SA62
Enquiry from: Barry C
Start Date: Immediate
Cavity wall insulation pine end of house
Haverfordwest - SA61
Enquiry from: Stephen R
Start Date: Immediate
Couldn't see the option but would like to replace our glass conservatory roof and the windows
Haverfordwest - SA62
Enquiry from: Angela R
Start Date: Immediate
Rendering a 3bed semi detached house
Haverfordwest - SA61
Enquiry from: Liz D
Start Date: Immediate
Looking for someone to be able to insulate A garage that has an basic metal garage door
Clynderwen - SA66
Enquiry from: Christine L
Start Date: Immediate
I am looking to do part of my property in UPVC cladding. Could I please have a quote
Newport - SA42
Enquiry from: Alison M
Start Date: Immediate
EPC quote please. Current EPC out of date Building work plus insulation completed Need new EPC
Crymych - SA41
Enquiry from: Gregg M
Start Date: Immediate
EPC for selling property
Haverfordwest - SA62
Enquiry from: Glenys P
Start Date: Immediate
have white garden walls which are difficult to maintain. need them to be clad to make life easier are you the property owner: owner of the property property type: other how many bedrooms do you have: ...
Crymych - SA41
Enquiry from: Iestyn G
Start Date: Immediate
Shed insulation - walls and ceiling
Fishguard - SA65
Enquiry from: Patrick O
Start Date: 1 to 3 months
planning approved for single storey kitchen extension & roofs and refurbishment of attached workshops. architect involvement. funding in place. time scale: 1-3 months please call to appoint
How much do Builders cost? Prices for Builders in 2024 can fluctuate relying on the sort of work that you need to have carried out in your residence.
Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.
First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.
The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.
View our Builder cost guide View our Builder adviceAdding a garden room to your property is a great way of creating an additional space within your home without having to invest heavily in large house extension projects. And not only does it expand your living space, but it’s also a way to add good value to your home or property. With the various benefits offered by a garden room, most individuals are usually surprised with just how affordable the living space can be. However, just like any other home improvement, the price of a garden room is influenced by a wide range of factors. These factors include the design you opt for whether standard or customized, the size of the garden room, the materials used, the number of fixtures and fittings you want as well as any other special design feature you require.
Asides from the money needed to put up the structure, there are also some common extra cost that’ll also be expended for both the interior and exterior of the living space. For instance, there are some furnitures and fittings that you’d like to put in your garden room and these will also form part of the overall cost. There’s also the electrical connections cost and this will vary depending on the distance of your room, the cables to be used as well as your electrician. For this part, you can expect to spend anything within the range of £850 to £1200 and since it’ll be used all year long, it’ll also require appliances for heating, insulation, electricity and ventilation.
Generally, the overall cost you should be expecting to pay for a modular build garden room will range between £10,000 to £40,000.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.
Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.
Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.
Rendering a house’s external walls is one of the cheapest and most effective ways by which a building can be made waterproof and also good looking. If you’re thinking about rendering your house, figuring out the cost of completion is usually one of the most important things you’ll have to consider before you proceed and if you don’t know where to start, finding an experienced tradesperson who possesses several years of experience as well as the ability to overcome the different issues that he may be faced with while on the project is paramount. If you’re able to get one, however, you should know that they rarely come cheap.
When trying to determine the accurate house rendering cost estimate , a tradesperson will put into consideration a great number of factors. Even at that, a rough estimate still requires both skills and expertise to be able to take into account all the necessary factors. In general, a typical 3 bedroom home in the UK will cost within the range of £4000 to about £5500 for a complete render job on the outside and covering from top to bottom.
Usually, the most important factor which play the biggest role when determining rendering costs is the area that’s going to be covered by the render mix. Professional contractors will provide a quote based on the rendering costs per square metre. Below are some rough estimates of rendering costs of properties depending on their size (without VAT).
✓ For a small mid terrace house of about 40 to 50 square metre, the total rendering cost estimate is £3000 to £4000.
✓ For a large mid terrace house of about 70 to 180 square metre, the total rendering cost estimate is £3000 to £5000.
✓ For a three bedroom detached house of about 100 to 160 square metre, the total rendering cost estimate is £4000 to £5500.
With the title of this blog, do not be deceived into thinking the purpose is to encourage you to install an external insulation by yourself. Even as a competent DIYer, it’s not advisable to buy a couple of materials and start slapping it into the wall hoping for the best outcome. External insulation is by no means a DIY job and without the proper training and experience, it can easily turn out disastrous resulting in loss of time, effort and money in such a valuable project. This blog, however, will give you a great insight on how the installation process works and help maximize knowledge ensuring you do not spend more than necessary.
External Insulation Installation
lRender Test
• This is done to ensure the existing render is good enough for insulation support.
• If positive, the insulation can be applied directly onto it.
• If negative, ensure removal of the old render before fitting the insulation.
lPipework Adjustment & Removal
• Remove all pipework prior to insulation fitting
• Install temporary downpipes to ensure water is not wasted and everything continue to function normally during the insulation fitting process.
lWindow Protection
• Protect the window with a protective layer or film.
lStarter Track Fitting
• Determine level you want the insulation to start (height).
• Fit the aluminium start track or carrier tray at the identified level.
lInsulation Boards Fitting
• Apply a layer of adhesive to the board and glue them to the wall in a staggered pattern.
• Cut to fit round all obstructions and windows.
• File off the edge of the board where necessary using a rasp upon successful fitting of the boards
lMechanical Fixing Inclusion
• Hammer around 10 fixings per square metre into the board.
• This is to secure the insulation boards.
lBeading Fitting
• Add corner beads and stop beads to ensure the insulation is secure and to prevent it from making contact with other materials.
lReinforcing Mesh & Render Addition
• Apply two layers of strengthening properties and between the two layers of render, include a fibre glass mesh.
lPrimer Application
• Paint on the primer
lFinal Render Application
• Choose your most preferred texture and colour as this will be the last coating of the installation process.
lPipework Re-installation
• Re-install all detached pipework at the start of the installation process.
There are many different types of extension. For example, you could install an orangery, flat or pitched roof extension, over-structure extension, single or double storey extension or a glass box extension. Which one of these is most suitable will depend on your existing property.
If you’re about to carry out a loft conversion project, you’d probably be wondering how long it’ll take to complete the task. Well, you’re not alone! This is one of the most common questions when it comes to loft conversion projects, however, providing a set timeframe for completion of such projects is impossible as all loft conversions vary. There are different factors that can determine the duration of your project. These factors include, the materials to be used, the type of the proposed loft conversion, the kind of staircase you’ll like to have installed, the number of windows included, the number of rooms to be added as well as a number of other influencing factors. As a result of these variables, the milestones and timings provided are only to be taken as guidelines. If you’d really like to have a set date, you can get in touch with a professional for help.
Generally, it’ll take up to 8 weeks to complete a loft conversion project.
✓ The first week activities will include putting up scaffolding, receiving the first materials for the build and creating an opening in the roof to gain access to the loft space.
✓ In the second week, the structure of the roof will be ammended and more support added.
✓ Third week, the floor joists will be fitted, building of the loft conversion will start, completion of the external roof works and commencement of plumbing and electric works.
✓ Fourth week, complete the building, construct the loft floor, fit the roof windows, insulation, ventilation and internal stud walls.
✓ Fifth week, apply plaster and plasterboard to the room walls, create a staircase opening and fit the new staircase.
✓ Sixth week, plaster the staircase area, complete plumbing and electrical works, hang the doors, fit skirting, handrails and bannisters and start decoration.
✓ Seventh week, complete the decoration and clean and wipe out all wastes.
✓ Eight week, complete all the remaining tasks.
General construction work should be restricted to the following hours: Monday to Friday 8am to 6pm. Saturdays 8am to 1pm. Most councils advice that noisy work is prohibited on Sundays and bank holidays but you should check with your local council to confirm this.
Answer a few quick questions to help us match you with the right Builder
Receive no-obligation quotes from 4 Builders working in Goodwick.
Compare prices, customer reviews and services, and hire the right Builder.
View our open Builder jobs near you
Join today