Building work | Wall Rendering
Cullompton - EX15
Enquiry from: Helen B
Start Date: Immediate
A 14ft (length) x 4.5ft (height) wall rendered. If you could please provide me with a quotation. Many thanks, Helen
-->
Over 92 reviews & an average rating of 4.4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Builders near you
Cullompton - EX15
Enquiry from: Helen B
Start Date: Immediate
A 14ft (length) x 4.5ft (height) wall rendered. If you could please provide me with a quotation. Many thanks, Helen
Cullompton - EX15
Enquiry from: Rob H
Start Date: Immediate
Insulate loft space over commercial premises with mineral wool insulation.
Cullompton - EX15
Enquiry from: Terence M
Start Date: Immediate
We will be shortly moving into Uffculme and will need a simple greenhouse erected , probably approx 6 by 10 or 12 feet, unheated. Can you suggest products, prices and cost of erecting for us?
Cullompton - EX15
Enquiry from: Nikki R
Start Date: Immediate
call any time. new build or replacement: new build quote requested on a porch, in pvcu, to be supplied and fitted. are you the property owner: owner of the property do you have planning permission...
Cullompton - EX15
Enquiry from: Amanda C
Start Date: Immediate
We have a 5x3 metre conservatory that has a basic roof so is hot in summer and freezing in winter. How much would it cost approximately to insulate the roof please? Are you the property owner: Owner o...
Cullompton - EX15
Enquiry from: Pindi W
Start Date: 1 to 3 months
To build a 2 story extension at the rear of the house. Ground floor to contain a new kitchen (cost additional) and convert the existing kitchen to a dinning room. Upstairs to create a 4th bedroom wi...
Cullompton - EX15
Enquiry from: Richard P
Start Date: 1 to 3 months
Are you the property owner: Owner of the property Do you have a: Single Garage What will the space be used for: Other Do you require Plumbing Work: Yes Do you require Electrical Work: Yes Would you li...
Cullompton - EX15
Enquiry from: Matt O
Start Date: 3+ months
Homeowner Please contact to appoint
Cullompton - EX15
Enquiry from: Sarah R
Start Date: Immediate
I have a single storey extension, built 2015. Now want to put a 2nd floor on top to make bedroom bigger. Please email only.
Cullompton - EX15
Enquiry from: Ben P
Start Date: Immediate
3 bed house
Cullompton - EX15
Enquiry from: Chris H
Start Date: Less than one month
Have a crack in gable wall (cob) have been advised it is requiring render removed, top of gable repaired where it meets roof. Then render replaced. Time scale: Less than one month Please call to appo...
Cullompton - EX15
Enquiry from: Becky A
Start Date: 3+ months
Convert current kitchen into utility and cloakroom. Remove conservatory and build kitchen diner to rear of house.
Cullompton - EX15
Enquiry from: Alison W
Start Date: Immediate
The house becomes ours on Friday 1 July. We know we need to insulate the cavities, loft, outbuildings and underfloor (Energy Cert F). Can anyone meet us on site, late morning Friday 1 July, to look it...
Cullompton - EX15
Enquiry from: John M
Start Date: Immediate
Customer visited the myplasteringprices.co.uk site and submitted an enquiry. Property type: Other, Work description: Hole in the wall about the size of a football
Cullompton - EX15
Enquiry from: Jacqueline R
Start Date: 1 to 3 months
Are you the property owner: Owner of the property Do you have a: Single Garage What will the space be used for: Living Space Do you require Plumbing Work: No Do you require Electrical Work: Yes I...
Cullompton - EX15
Enquiry from: B
Start Date: Immediate
Home owner 3 double wardrobes along 1 wall and 2 drawer units to incorporate a dressing table. Worktop across the units. Please Call to Appoint
How much do Builders cost? Prices for Builders in 2024 can fluctuate relying on the sort of work that you need to have carried out in your residence.
Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.
First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.
The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.
View our Builder cost guide View our Builder adviceGeneral construction work should be restricted to the following hours: Monday to Friday 8am to 6pm. Saturdays 8am to 1pm. Most councils advice that noisy work is prohibited on Sundays and bank holidays but you should check with your local council to confirm this.
If you’re about to start your house extension project and wondering how long it’ll take to complete, you’re not alone! This is one of the most common questions that’s asked by homeowners in the UK and across the globe. However, there’s no single precise answer for this as there are multiple factors that’ll affect the length of time it’ll take to complete your home extension. These factors include the size of the construction work as well as whether you’re planning to live in the house after completion or otherwise.
For a single extension, the length of time it’ll take to complete the home extension is normally up to 3 months. So let’s break this down:
As you would have expected, the first step to be taken is the preparation of the site. You start by digging out the footing and preparing the foundation which should take about 2 weeks. This is then followed by the damp course installation as well as the fitting of any drains needed around the extension which will also take a further 2 weeks.
The 5th week will be for the construction of the external walls as well as putting the blockwork in place for the provision of the cavity wall insulation. A further 2 weeks after this, will be dedicated to the installation of the roof structure and the internal walls.
It’s at this junction that you’ll call on your weather proof installer to fit in your uPVC windows and doors. Once done, the gas fitters and electricians will have to be on site to connect power to your new extension building. Subsequently, this will be followed by internal wall plastering as well as breaking through your main house. Once the plaster is dried, decorations completed and all the required furniture and units installed, the extension is ready for use.
Garage conversion is a great way to add extra usable space to your home without having to extend your property. A fun fact is that, in the UK if you have your car parked in the garage, you’re in the minority. According to a research carried out by Admiral Loans, just about 33 percent of home owners in the UK store their cars in the garage. For most people the garage is literally a dumping ground that’s never fully utilized as such. In recent times, the garage is now being used to store a variety of other stuffs asides a car which includes garden furniture, tools and appliances, utilities such as washing machine, fridge and freezer as well as food and groceries. These facts show that more and more people are underutilizing their garage when they may actually be in need of more usable space in their property. So why not put into consideration converting the garage into a new space that would be able to serve more purpose?
If you’ve decided to convert your garage, you’d probably want to know the how long the project will take. There are a wide range of factors that can determine the duration of a garage conversion project. These factors include:
• If the foundation needs reinforcing
• If the floors, walls, or roofs are in a bad condition.
• If the ceiling height needs some raising
• If the insulation required in newer builds.
All aforementioned factors will make the garage conversion project take longer than expected. However, in normal situations garage conversions are relatively quick to complete once you start the building works. A single-car conversion will usually take about 3 to 4 weeks to complete depending on the existing garage’s structure.
If you’re planning on adding a house extension to your property, you’d probably be worried about whether or not your proposed extension would require a planing permission. Well, it may be relieving to know that not every house extension project would require a formal consent, and in fact, several extensions are covered by the permitted development rights. Not only can this save you a considerable amount of time especially at the project’s planning phase, but it’ll also save you money on the application fee. In the UK, single storey extensions to the house’s rear can be 3 metres deep for both semi detached houses and terraces or 8 metres deep for detached homes.
So how do you know when you’d require a planning permission for your home extension? Well, if your extension plan fits these criteria explained below, then your project is most likely going to be allowable as a permitted development.
• Extensions, which includes previous additions, must not go beyond half of the original house’s total surrounding land area.
• The main elevation, or side elevation where it fronts the highway, must not be extended forward.
• For single storeys, the rear additions must not extend more than the original house’s rear by more than 3 metres in both semi attached homes and terraces (4 metres for detached houses).
• Extensions to the side must be a single storey with a height not exceeding 4 metres and not going beyond 50% of the original house’s width.
• Extensions hat within 2 metres of a boundary should have a eaves height not more than 3 metres.
• Multi storey addition must not extend beyond the original house’s rear wall by a maximum of 3 metres or 7 metres of the boundary opposite the rear wall.
• Permitted development rights do not apply in listed buildings or designated areas.
Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.
Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.
Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.
Finding a builder nearby can have enormous assistance when it comes to your build. Period on site, their familiarity of local planning permission, constructors’ dealers and other local trades are all vital bits of knowledge that you’ll welcome on site.
It is always wise to walk around in your local area or drive to a site where any construction work is going on. It’ll give you a proper impression of the constructors who are active nearby. You don’t have to like their style of work or the project they are currently carrying out – after all, a builder can only produce what’s on the plans in front of them.
Find a Builder Other Tradesmen Recommend
If you’ve had to call an electrician before or a local plumber and liked their work, you can always ask them if they have any builders whom they would recommend. Maximum tradesmen get used to seeing the similar acquainted names from one place to another in the sites they are working on and every so often has favourites for who they like to work with — and who they see as a good source of work.
Always Talk to Previous Customers
Once you’ve found a builder you would like to work with, ask them for a list of previous customers they have worked with; they ought to be glad to offer particulars if they’re self-assured they’ve done an effective job.
Look for a builder online
A decent place to start looking for builders online is on sites like the Federation of Master Builders. They have a search tool where you can find precise crafts in your area and look at their situations. All FMB members are assessed and individualistically examined and are checked to ensure that they have the correct insurances in place.
Before the commencement of any project, it’s always best to get an estimation of the cost. However, determining the cost of an external solid wall insulation is not the easiest of tasks as it relies on varying components such as the insulation materials to be used, labour cost and installation as well as the type of decorative finish to be incorporated. And depending on your choice of insulation material, some may need some adhesives while others may require some fixings which also contributes to the differences in price. As a result, the determination of the material cost alone can be tricky and even more so when various materials cover varying areas.
With that in mind, the cost of external solid wall insulation generally ranges between £80 to £100 per square metre2. As a result, a small flat can cost from £6000 to £9000 whereas a large detached house can have a price ranging between £21000 to £23000. To earn back your investment in terms of energy bill savings can take a couple of years, but it’s surely worth the try as there are several other benefits associated with installing an external solid wall insulation system. What’s more? Another huge factor that can influence the cost of your system is also the amount of work that’s required, how easy it is to be accessed by the installers and lots more
If you’re looking to cut down on the cost of your external solid wall insulation, then the best time for an installation might just be when you’re having another decorating or building project done such as fitting a new roof, window painting, installation of solar PV panels and more. This way, you’ll be able to spread the cost and have a greater value for each penny expended.
If you’re planning to construct a kitchen diner extension, to help you set a budget and start planning you must first have a cost estimate that’ll complete the entire project. If not, there’s a probability that you may have to spend more than would have been necessary or probably break the bank to have the project done. In truth, there’s no single and short answer to this question as the cost of a kitchen diner is largely dependent of several variables. In this article, we’re going to give a good insight into kitchen diner extension cost so as to help you make informed decisions moving forward. Let’s take a look!
On the average, a kitchen diner extension will cost within the range of £25,000 to about £45,000, however if you happen to reside in London, you can expect the cost to be a lot more than that - closer to £60,000. And due to the fact that there happens to be a plethora of options out there, any decision to make be it on the size, tradesman, flooring, finishes or type of the kitchen diner extension, will have a considerable impact on the overall cost of the project. For instance, a basic kitchen diner extension cost can be within the range of £12,000 to about £15,000., while a high end kitchen diner extension can reach a whooping price between £80,000 to about £100,000.
The total cost of your kitchen diner project will rely heavily of the size as well as the quality of the finishes. For example, a kitchen diner extension that’s small and basic is likely to cost about £1,300 to £1,500 per square metre. However, if you’re going for higher quality finishes, you can expect to pay within the range of £1,900 to about £3,000 per square metre.
Answer a few quick questions to help us match you with the right Builder
Receive no-obligation quotes from 4 Builders working in Cullompton.
Compare prices, customer reviews and services, and hire the right Builder.
View our open Builder jobs near you
Join today