Building Work | Porch
Prestatyn - LL19
Enquiry from: Anne J
Start Date: Immediate
Looking at either a replacement double glazed front door or possibly a upvc porch
-->
Over 50 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Builders near you
Prestatyn - LL19
Enquiry from: Anne J
Start Date: Immediate
Looking at either a replacement double glazed front door or possibly a upvc porch
Prestatyn - LL19
Enquiry from: Bethan P
Start Date: Immediate
Hello, I am contacting you on behalf of a local angling club. We are looking at hiring a 9-13 tonne excavator for a week and I am looking for quotes. Could you send me some details on your machinery a...
Prestatyn - LL19
Enquiry from: Julie G
Start Date: Immediate
Cavity wall insulation to bungalow
Prestatyn - LL19
Enquiry from: Mark D
Start Date: 1 to 3 months
plumber, plaster, joinery are you the property owner: owner of the property property type: detached how many rooms are you looking to have restored/refurbished: 5+ rooms do you have plans drawn up alr...
Prestatyn - LL19
Enquiry from: WR J
Start Date: Immediate
mount metal bbq with flue in 2x2 meter wall to be erected on existing patio area do you require the bricks to be supplied too: yes are you the property owner: owner of the property property type: deta...
Prestatyn - LL19
Enquiry from: Sharon D
Start Date: Immediate
customer has a insulation project they are looking to have done, specially they want quotes for loft & roof insulation. they are unsure of options so would like to discuss with a builder.confirmed int...
Prestatyn - LL19
Enquiry from: Peter W
Start Date: Immediate
customer made an enquiry for single storey house extension and confirmed on the quotatis site they would like quotes from a builder.mr lives in the prestatyn area and would like a call to discuss opti...
Prestatyn - LL19
Enquiry from: Peter W
Start Date: Immediate
customer made an enquiry for house extension and confirmed on the quotatis site they would like quotes from a builder.mr lives in the prestatyn area and would like a call to discuss options.see below ...
Prestatyn - LL19
Enquiry from: Jordan p
Start Date: Immediate
a porch built at the front of the house are you the property owner: owner of the property do you have planning permission: no what material are you looking for: upvc what material would you like the r...
Prestatyn - LL19
Enquiry from: Suzanne A
Start Date: Immediate
small front porch with front door are you the property owner: owner of the property do you have planning permission: no what material are you looking for: upvc what material would you like the roof ma...
Prestatyn - LL19
Enquiry from: Liz G
Start Date: Immediate
Energy performance certificate
Prestatyn - LL19
Enquiry from: Lee S
Start Date: 1 to 3 months
both drawings for planing and building regs are you the property owner: owner of the property property type: semi detached looking for: single storey extension do you have planning permission: no do y...
Prestatyn - LL19
Enquiry from: Lee S
Start Date: 1 to 3 months
customer is currently in the process of looking for quotes to add a single storey extension to their property. are you the property owner: owner of the property property type: semi detached looking fo...
Prestatyn - LL19
Enquiry from: John H
Start Date: Immediate
are you the property owner: owner of the property property type: semi detached how many bedrooms do you have: 3-4 do you require a soffits and fascias: no other forms: wall rendering agreed to receiv...
Prestatyn - LL19
Enquiry from: Shirley M
Start Date: Immediate
8ft x 6 ft greenhouse toughened glass
Prestatyn - LL19
Enquiry from: Ken H
Start Date: 1 to 3 months
Remove iron balustrade from first floor balcony and replace with stainless steel and glass balustrade Time scale: 1-3 months Please call to appoint
Prestatyn - LL19
Enquiry from: Jane E
Start Date: Immediate
Hi have small conservatory want this down and 4m extension on the back of the bungalow medical reasons
Prestatyn - LL19
Enquiry from: Frederick K
Start Date: Immediate
Soundproofing solution between 2 halls Call to appoint
Prestatyn - LL19
Enquiry from: Mrs E
Start Date: Immediate
4 bed detached, Prestatyn. The house is an ugly dark brick and needs rendering applied on both levels. Ideally painted in a light grey or cream. My husband likes the idea of the wood panelling effec...
Prestatyn - LL19
Enquiry from: Mr R
Start Date: 3+ months
Free standing garage plans passed need quotes ground work. Block work and roof work Are you the property owner: Owner of the property Do you have planning permission: Yes
How much do Builders cost? Prices for Builders in 2025 can fluctuate relying on the sort of work that you need to have carried out in your residence.
Are you planning to erect a new house or structure? If yes, then you’d probably want to know just how much it’ll take to get the project over the line to help you set a budget and start to plan. Building a new house is requires huge financial investment and as a result, there’s the need to carry out your due diligence before you proceed. In this post, we’re going to give you an insight into the prices charged by builders to erect a new home or structure.
First and foremost, like every other home project, the price charged by builders to construct a new house or structure depends on a wide range of factors. These factors include the size, location, accessibility as well as qualifications of the builders you wish to employ just to mention a few. For instance, you’d expect the cost of building two-storey in London to be a lot more expensive than the price of a one-story building in Scotland. However, we’ll try our best to give you an idea of the price range you can expect to incur to complete your project.
In general, a builder will charge within the range of £10 to about £15 per hour on the average. For small building projects which includes wall and foundations repairs, a builder will typically charge about £11 per hour. However, the price charge will depend on the extent of the job due to the fact that simple tasks such as repointing only costs about £10 per hour, while laying new foundations can cost up to £15 per hour.
The table shows the types of work that Builders typically do and the average cost range of these tasks. Some tasks take longer to finish than others so prices do fluctuate by job.
View our Builder cost guide View our Builder adviceHow To Dot And Dab A Plasterboard
If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!
• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.
• Ensure the wall’s height is 15mm more than the plasterboard
• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.
• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.
• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.
• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.
• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.
The short and simple answer to this question is yes, loft insulation does cause condensation. Over the years, problems with condensation in loft spaces have become increasingly common. While this may not be harmful in anyway, when the condensation becomes excessive it can lead to more serious issues taking root in your loft like wet rot, dry rot as well as black spot mould. Generally, the best thing to do if you’re concerned about the condensation in your loft space and that it may rapidly become a bigger problem is to get in touch with a damp specialist as soon as possible.
Even though insulating your loft space comes with a wide array of benefits like making the top floor rooms warmer, it’s however comes at the cost of making your loft or room space cooler. Condensation in lofts take place primarily due to the humid air making its way through insulation or other gaps into the loft space and touching a cooler surface which in turn results in beads of moisture on the timbers, lintels as well as the underside of the roof. This is why its always a great idea make use of thermal insulation with a vapour barrier that’s installed on the warmer side of the insulating material.
Condensation in loft is caused by excess moisture in the air and lack of adequate air ventilation. Here are some top reasons that gives rise to this in the loft:
If you’re about to start your house extension project and wondering how long it’ll take to complete, you’re not alone! This is one of the most common questions that’s asked by homeowners in the UK and across the globe. However, there’s no single precise answer for this as there are multiple factors that’ll affect the length of time it’ll take to complete your home extension. These factors include the size of the construction work as well as whether you’re planning to live in the house after completion or otherwise.
For a single extension, the length of time it’ll take to complete the home extension is normally up to 3 months. So let’s break this down:
As you would have expected, the first step to be taken is the preparation of the site. You start by digging out the footing and preparing the foundation which should take about 2 weeks. This is then followed by the damp course installation as well as the fitting of any drains needed around the extension which will also take a further 2 weeks.
The 5th week will be for the construction of the external walls as well as putting the blockwork in place for the provision of the cavity wall insulation. A further 2 weeks after this, will be dedicated to the installation of the roof structure and the internal walls.
It’s at this junction that you’ll call on your weather proof installer to fit in your uPVC windows and doors. Once done, the gas fitters and electricians will have to be on site to connect power to your new extension building. Subsequently, this will be followed by internal wall plastering as well as breaking through your main house. Once the plaster is dried, decorations completed and all the required furniture and units installed, the extension is ready for use.
Are you considering converting your garage into a more usable space in your home? If yes, then you’d probably want to know if you’ll require building regs before converting the garage. The answer to this question is yes. Although you may not require planning approval to convert your garage into a more usable space, but you’d usually need approval under the Building Regulations.
When re-structuring your garage into a habitable space, the following should be taken into consideration: structural alterations, ventilation, moisture proofing, insulation, fireproofing, escape routes as well as the submission of a building building notice or full plan application to the local council in order to inform them about the planned project.
• Walls
You’ll require an approval if you plan to infill the garage door with a window and a new wall. This is because the garage may have been built of a shallow slab which implies that a new foundation would be needed for the new wall construction.
• Floor
Even though there’s a high possibility that the garage floor is strong enough for domestic use since its designed to withstand the weight of vehicles, you may however need to upgrade to make sure it suitable for both thermal insulation and damp proofing. In addition, there may also be the need to to alter the floor level in such a way that it matches that of the remaining parts of the house.
• Ventilation
According to the Building Regulations requirements, there’s a need for adequate ventilation for each individual rooms which includes garage conversions for general health purposes. What’s going to determine the ventilation level that’ll be required is the frequency at which the room is used. Ventilation can be provided through purge or simply opening the window or via trickle ventilation.
Are you looking to create some more space in your home with your garage being almost dispensable? If yes, then considering a garage conversion project may be the way to go. Unlike many other extension options, garage conversion does not take up an additional space as it only changes the current structure of the garage. As a result, the cost of completing a garage conversion project can be relatively attractive when compared to other space creating alternatives. So exactly how much would a garage conversion project cost? Well, there’s no precise answer for this as several influencing factors come to play. However, in this guide we’ll give you a rough idea of the average costs that you’re likely going to encounter. Some of the factors that can influence your budget dramatically includes the following:
• The size of the conversion. The larger the size of the garage per square feet, the more cost you’ll have to expend.
• The type of your property - listed buildings are usually more expensive.
• Your location in the UK. If you stay in London where there’s a higher demand, you’ll most likely pay more.
• You’re likely to pay more if a specialist knowledge is required.
• The amount of glazing to be installed
• Quality of the materials to be incorporated.
• Quality of the professional to carry out the installation service.
On average, when it comes to garage conversion projects, you’re likely to pay the following depending on the per square metre given:
• A single garage of about 15 square metre will cost within the range of £6,000 to £15,000.
• A double garage of about 30 square metre will cost within the range of £12,000 to £30,000.
Pitting, also referred to as spalling is the event whereby “pits” or small holes start showing on the surface of your concrete driveway which makes it appear both worn and uneven. Concrete driveway pitting is a common but highly frustrating problem for most homeowners. You’ll see some concrete driveways that’ll only start to pit after a couple of years, but this is not true for all concrete driveways as others will start to show signs only after a couple of months. So how do you tackle this issue? Well, it’s relatively simple to tackle, however if you’re not confident or lack the necessary skills, we’d recommend you get in touch with a reliable professional who can guarantee the best results for help. In this guide, we’ll take you through the concrete driveway pitting repair process.
✓ Prepare the pits by cleaning the area, clearing out all debris and more. The small pits can be cleaned with a stiff brush while a sturdy broom will do a good job for larger pits.
✓ Make use of a hose to spray the concrete pits and flush out all remaining bits of waste.
✓ If you’re tackling series of small pits, simply use a caulking gun filled with pre-mixed epoxy and specially formulated for concrete to fill the pits. Clear off the excess eproxy ensuring that its level with the concrete surface. Once done, simply leave for at least 24 hours before the application of a concrete sealant to prevent the wear and tear of the new concrete.
✓ Chisel out a little concrete and clean with a pressure washer. Once done, apply a concrete resurfacing compound mixture into the holes and use a trowel to level off.
✓ Ensure that the repaired concrete driveway is protected from rain and foot traffic for at least 6 hours (or 24 hours for vehicles).
How To Put Up Plasterboard
Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.
Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.
• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.
• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
Answer a few quick questions to help us match you with the right Builder
Receive no-obligation quotes from 4 Builders working in Prestatyn.
Compare prices, customer reviews and services, and hire the right Builder.
View our open Builder jobs near you
Join today