Large Commercial Solar Panels in Bangor

Find Large Commercial Solar Panels Prices in Bangor

Home > Solar Panels Projects > Commercial solar pv 51kw+ system > Bangor

Large Commercial Solar Panels in Bangor

Huge solar installations are offered for corporations, colleges and also farms, assisting to reduce electrical power bills by thousands of extra pounds annually as well as earning an earnings with Federal government rewards.

 

Big organisations invest a lot a lot more every year on electrical power expenses, which is why these bigger setups have actually been specifically created to aid cut that expense.Unlike photovoltaic panels for your house, these large range solar installations come with loads of panels. They are normally positioned on the roof covering or ground, dealing with south or southwest. This guarantees they obtain daylight in all times throughout the year as well as produce even more electrical power.

 

Solar panels function by developing an electric cost. 2 layers of semiconducting product gather the sun's natural rays and also convert the energy right into useful electrical for lighting as well as devices. The photovoltaic panels are connected to the National Grid ensuring a set income as well as other superb benefits.

 

Benefits of solar PV for corporation, institutions and also farms. Power rates are raising year-in year-out and also many individuals are looking at photovoltaic panels as the most feasible method to help them cut their costs and also make a fixed income.

Average Commercial solar pv 51kw+ system cost in Bangor

The cost of large solar panel installations can vary greatly/ Costs fluctuate based on the materials, number of panels, installation position and the business selected.

 

Average price per Commercial solar pv 51kw+ system job in 2024

Avg. price low

Avg. price low
£44,000

Avg. price

Avg. price
£55,000

Avg. price high

Avg. price high
£66,000

£66500

£49875

£33250

£16625

£0

Prices based on actual Commercial solar pv 51kw+ system costs for Bangor, as reported by local LeadsDoWork members.

Commercial solar pv 51kw+ system installation cost in Bangor 2024

Labour cost £32,500
Material cost £18,750
Waste removal £3,750
Time frame: 1-6 months

Commercial solar pv 51kw+ system searches in September 2024

Commercial solar pv 51kw+ system Projects in Bangor in August 2024

835

Requests for quotations in Bangor in August 2024

0

Requests for Commercial solar pv 51kw+ system quotations in Bangor in August 2024. 0% change from July 2024.

0

Requests for Commercial solar pv 51kw+ system quotations in County Down in August 2024. 0% change from July 2024.

Source: Numbers calculated based on the search volumes in major search engines

Commercial solar pv 51kw+ system searches in cities and towns near Bangor August 2024

Bangor

Bangor is a significant town in North Ireland's County Down, located on the western coastline of the country. It's often regarded as a commuter town for the city of Belfast and in 2007 was selected as as the most appealing area to live in North Ireland. Bangor is part of the North Down Borough Council and encompasses one of Ireland's premier islands, Bangor Marina. For your own property enhancements in Bangor don't forget to use only reliable companies locally for the very best cost and a good quality finish.

Looking for Commercial solar pv 51kw+ system in Bangor?

Get free quotes from local solar panel installers

Get free quotes

Similar Customer Enquiries for Commercial solar pv 51kw+ system in Bangor

16 Aug

Solar Panels | B2B Solar PV 51kw+

Bangor (within Ring Road) - BT20

Enquiry from: Kathryn D

Start Date: Immediate

11 Avonlea Park 11 Avonlea Park

Post a similar request >

25 Nov

Solar Panels | B2B Solar PV 51kw+

Belfast - BT14

Enquiry from: John C

Start Date: Immediate

Property Owner Leasehold 51 KW Approx 2900 m2 Age of building: approx. 1984 Material No obstructions South facing Pitched roof No accessing roof No electricity supplied as of yet Feed in Ta...

Post a similar request >

10 Nov

Solar Panels | B2B Solar PV 51kw+

Belfast - BT14

Enquiry from: John C

Start Date: Immediate

Property Owner Leasehold 51 KW Approx 2900 m2 Age of building: approx. 1984 No obstructions South facing Pitched roof No accessing roof No electricity supplied as of yet Feed in Tariff Paid...

Post a similar request >

10 Oct

Solar Panels | B2B Solar PV 51kw+

Belfast - BT14

Enquiry from: John C

Start Date: Immediate

Property Owner Leasehold 51 KW Approx 2900 m2 Age of building: approx. 1984 Material No obstructions South facing Pitched roof No accessing roof No electricity supplied as of yet Feed in Ta...

Post a similar request >

How it works

Tell us about your Commercial solar pv 51kw+ system project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Solar Panel Installers in Bangor

Get free, no-obligation quotes from 4 verified Solar Panel Installers working in Bangor.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Are there are grants for commercial solar panels?

One of the things that has been on the UK government’s agenda for some time now is to promote the use of renewable energy sources. In fact, the Renewable Energy Directive put out by the EU instructs all member countries to achieve a 20 percent renewable target before the year 2020. The UK’s commitment to this objective has been made quite glaring with a number of funding options that has been put in place to help business owners looking to solar panels on their properties. This commitment was also showcased by a reduction in the cost of solar panels, so new investors have little to worry about. Although there aren’t any grants in the conventional sense, but there are opportunities for solar panel funding in the UK. At present, the only scheme open to new applications is the SEG - Smart Export Guarantee which came into effect on 1st January, 2020.

 

In general, there are four notable incentives in the UK for solar panels which includes the aforementioned Smart Export Guarantee, Reduced VAT on Energy Saving Products, Feed-in Tariff ( no longer open to new applications ), as well as the Renewable Heat Incentive ( RHI - applies only to solar water heating ).

 

Being the only one still open to new applications, we’ll provide you with some insights on SEG. The Smart Export Guarantee allows small scale low-carbon electricity generators to receive payments for surplus energy they’re able to export back to the grid. Although, this is not a direct government scheme, all licensed suppliers are necessitated to offer an export tariff to their customers. Those suppliers with more than 150,000 customers are obligated to offer a tariff, while the suppliers with fewer customers can partake on a voluntary basis.

how much are solar panels for a commercial property/?

Installing solar panels for your business operations can provide you with a number of impressive benefits. It is not only capable of helping you minimize your business’ environmental footprint but it can also go a long way to help you save money. Irrespective of your company’s size, whether big or small, it can still benefit immensely by making use of solar panels. If you’re currently planning to install solar panels in your business environment, then you’d probably want to know just how much it’ll cost to complete the project. In this post, we aim to give you a good insight into commercial solar panel pricing so as to help you make the best informed decisions possible . Let’s take a look!

 

In truth, there’s no single and accurate answer to this question as there are a number of factors that can influence the cost of commercial solar panels. These factors include the size of the roof, the amount of energy that’s generated as well as the number incorporated. To give you a general idea, the price of solar panels for commercial property is usually within the range of £16000 to £70000 for small to mid-sized companies. For a more accurate estimate, you’ll need to get in touch with a professional with your unique needs.

 

There is also a need to evaluate the cost of solar panels so as to determine whether or not they’re a feasible option for your business. In order to determine the amount of energy your company uses per month, simply take a closer look at your utility bill.  This should indicate just how much energy you use per month as well as how much the utility company charges per kW. In general, most small to medium sized companies will incorporate 30,000 to 50,000 kWh annually and you can expect the cost to differ based on your location and the size of your system. The rule of thumb with larger systems is to calculate using £1000 per kW, plus VAT as the yardstick.

how long does it take to install commercial solar panels?

After making the very important business decision to go solar, you may also want to know just how long it’ll take to complete the installation process and start generating electricity. After all, generating electricity is the main reason you made the switch to solar system. In this post, we’re going to provide you with in depth details on how long it takes to install solar panels as well as the factors that may affect that time.

 

The entire process of solar panels installation and getting them approved isn’t an overnight process. You’ll have to wait for periods for each step of the process whereby one must be completed before moving to the next. The time required to complete each step can, however, vary largely depending on your location, the type of solar panels you opt for, the solar company you hire as well as the number of people that’ll be making the installation. Here are the steps to a solar system installation and the estimated time each are expected to take:

  • Site assessment. Once you chosen your solar company, the first step would be to have a solar professional from the company to visit the site to examine the roof and other features so as to make sure that they’re able to support a solar system. From the initial contact to scheduling the site visit, this step can take up to 1 to 2 weeks
  • Local permitting. This involves getting the right permits from your local authorities. This can take up to 3 to 6 or more weeks.
  • Solar system design. This may take up to a week or two depending on whether or not you need design approval and also where the parts are coming from
  • Installation. This step can take a week or two depending on the size af your solar panel and roof.
  • Inspection. This step can take up to a week depending on where you reside and how quickly the inspector can visit.
  • Utility connection. Depending on your utility company, this step can take up to 2 weeks.
do you need planning for solar panels commercial building/?

Just like other major house improvement projects, some specific requirements must be met to allow for the installation of solar panels on commercial buildings. The main reason why these standards and regulations were established is to minimize the risk of the solar system becoming an issue or potential hazard in the unforeseeable future. So if you’re thinking about buying and fitting new solar panels, you’ll probably want to know whether or not you’ll require to submit a planning permission application for approval before you can proceed.

 

Fortunately, the installation of solar panels on commercial buildings may be “permitted development which mean you won’t have to apply to the Local Planning Authority for planning permission. There are, however, some important limits and conditions which must be put into consideration in order to benefit from these permitted development rights. Some of the limitations include:

  • The solar panels must be installed on a wall or pitched roof that should project at a maximum of 200mm from the surface of the wall or roof slope.
  • Equipment placed on a roof should not be within one metre of the external edge of that roof.
  • Equipment mounted on a wall must not be within one metre of a junction of that wall with another wall or with the roof of the building
  • If the equipment is on the roof of a building, the capacity for generation of electricity across the entire site must not be more than 1 megawatt.
  • In the situation whereby the panels are installed on a flat roof, the highest part of the equipment should not exceed one metre above the highest part of the roof.

 

In general, obtaining a planning permission is very important and as such, you must discuss your position with your chosen installation company before you proceed.

Placholder Image

Other Top Projects in Bangor

Are you a solar panel installer in Bangor?

We can help you get more Commercial solar pv 51kw+ system work and boost your business.

Join today