Quantity Surveying in Ballymena

Find Quantity Surveying Prices in Ballymena

Home > Surveyors Projects > Quantity surveyors > Ballymena

Quantity Surveying in Ballymena

Are you searching for Quantity surveyors in ? Our network of surveyors are can assist with your project. Every one of our Surveyors in Ballymena are checked so you can see local customer reviews, when business was established, reviews, approval and also cost permitting you to make the right choice on who to hire. Let us take the problem out of discovering approximately 4 professionals for your Quantity surveyors job.

Quantity surveyors are specialists learnt the management of all prices that's connected with building and civil engineering jobs. Normally, their jobs is both site as well as office-based with the primary goal of minimizing expenditures as well as additionally to maintain them within the established limits of a budget plan. What's more? They aim to attain all these without needing to jeopardize on the quality of the results and while likewise complying with the building, health in addition to security regulations. Amount property surveyors additionally participate in tasks and work hand in hand with clients or specialists right from the start - preparing thorough job price quotes. They likewise function to collect tender and also agreement documents, perform expediency researches as well as see to the execution of risk control. Upon the start of a building job, quantity property surveyors meticulously keeps an eye on any kind of variants which might result in price variations.

 

We will offer up to 4 Quantity surveyors locally, who will supply quotes for the job you desire done. You'll get a property visit from specialists in that'll aid you to choose the right Quantity surveyors for your home before accomplishing the work. Enter your postal code to begin looking currently.

Average Quantity surveyors cost in Ballymena

The regular cost of Quantity surveyors is £400. Costs vary based on the materials and the company chosen. The upper price range can be as high as £660.

Average price per Quantity surveyors job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£6,600

£7100

£5325

£3550

£1775

£0

Prices based on actual Quantity surveyors costs for Ballymena, as reported by local LeadsDoWork members.

Quantity surveyors installation cost in Ballymena 2024

Labour cost £300
Material cost £100
Time frame: 1 day

Quantity surveyors searches in November 2024

Quantity surveyors Projects in Ballymena in October 2024

712

Requests for quotations in Ballymena in October 2024

0

Requests for Quantity surveyors quotations in Ballymena in October 2024. 0% change from September 2024.

0

Requests for Quantity surveyors quotations in County Antrim in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Quantity surveyors searches in cities and towns near Ballymena October 2024

Ballymena

Ballymena is actually a large town in County Antrim, Ireland as well as the seat of Ballymena Borough Council. Ballymena had a populace of 28,717 individuals within the 2001 Census.

Looking for Quantity surveyors in Ballymena?

Get free quotes from local surveyors

Get free quotes

How it works

Tell us about your Quantity surveyors project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Surveyors in Ballymena

Get free, no-obligation quotes from 4 verified Surveyors working in Ballymena.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

When do I need a quantity surveyor?

Generally, you wouldn’t need to get in touch with a quantity surveyor prior to purchasing a property, unless of course your property is a very unique and unusual one. After making a commitment to buying a property or to kick start a construction project, then you might want to start taking into consideration getting in touch with a quantity surveyor. The best time for a quantity surveyor to carry out an inspection of the property is right after settlement and just before the tenants moving in. This is to ensure that the quantity surveyors do not disturb the tenant and they also get to fully go through what you’ve purchased as well as the condition it’s in.

 

Quantity surveyors will help you by working with architects, accountants, engineers, building owners, builders, developers, financiers, government, insurance underwriters, loss adjusters, sub contractors as well as solicitors. What’s more? The in depth knowledge quantity surveyors possesses when it comes to construction costs enables them to carry out a number of useful tasks to help you.

 

Prior to construction, quantity surveyors can prepare a feasibility study, estimate to defined the project budgets, carry out an analysis to refine the budget as the design documents develop, prepare Bill of Quantities so as to help with the tender process and also to carry out a review of Builder’s tender submissions. While the construction is ongoing, they can help provide cost control services, carry out an assessment of the builder’s progress claims and also undertake an assessment of variation and delay claims. Finally, after the construction, they can assist with the determination of the final project cost, prepare the tax depreciation reports for both investors as well as property owners and also prepare Expert Witness reports to assist in the settlement of building disputes.

what does quantity surveying involve?

.Typically, quantity surveying involves the calculating and management of the costs relating to projects, starting with assisting with the initial estimates to finalizing the overall requirements of the budget. Quantity surveyors normally work in land management, property as well as construction industries. Generally, quantity surveyors are usually engaged at the start of a project, consulted and brought in to take a look at a planned construction’s feasibility or repair needs, they then subsequently supervise the remaining activities during the capital expenditure phases of the project development. In other words, they’re often involved on the site up until the completion of the construction project helping to monitor both the forecasted and actual expenses while also being required to quickly determine the best line of action to take to deal with problems  as well as changes in specifications with updated costings and feasibility reviews.

 

As a quantity surveyor, you’ll be required to perform a series of roles on a daily basis. This may involved having to work in an office in one day and the next, you’d probably find yourself on a construction site meeting with clients or consulting with a construction personnel. Each project is unique as there’s always a great deal of variety which can be not the most pleasant activity especially for someone who doesn’t like routine works. On a daily basis, quantity surveying normally involves preparing tender and contract documents, carrying out analysis, monitoring costs variation and preparing reports, determining the client’s requirements and taking on feasibility studies, distributing work to sub contractors as well as making the necessary payments. Apart from all the aforementioned, site visits also represents a big part of quantity surveying as you’re required to make assessments on the financial projections for the future activities.

what is the cost of a quantity surveyor?

If you’re thinking about hiring the services of a quantity surveyor for your next building project, then you might probably want to know how much its going to cost to enable you set a budget and start to plan. However, there’s no single and straightforward answer to this question as the price of a survey is dependent on a wide array of factors. The primary drivers include the scope of the construction, the complexity of the property, the level of skill required to make appropriate assessment of the property as well as the level of liability that will be covered by the quantity surveyor. In a more simpler terms, the cost of a quantity surveyor is determined by the size, age, condition, complexity and to some extent agreed purchase price.

 

Generally, most quantity surveyors are charged out at a rate of £100 per hour. And as a result, the price of a quantity survey is related to the number of hours that’s going to take to make an in depth assessment of the property. Typically, several quantity surveys will take up to half a day on site with a further half going to the production of the survey report. Consequently, it would be totally fair to say that a quantity survey would cost you anywhere within the range of £600 to £800 plus VAT. For a less detailed and simpler survey such as RICS Homebuyers Report and Valuation, you can expect to use only a couple of hours on site which will also be topped by a few hours of work in the report production. As a result, the normal cost of a Homebuyer survey would be between the range of £400 to £500 plus VAT. However, you should take note that the prices can vary on a geographical basis.

What qualifications should a quantity surveyor have?

If you wish to work as a quantity surveyor or perhaps you’re just looking to hire one, then one of the first things that comes to mind is the qualifications to look out for. To work as a quantity surveyor, you’ll normally require a degree in quantity surveying or commercial management which is accredited by the RICS (Royal Institution of Chartered Surveyors). However, in the event whereby your degree as an undergraduate happens to be in a different subject, there’s still a chance for you to become a qualified quantity surveyor. To achieve this, all you need do is to take a Royal Institution of Chartered Surveyors accredited post graduate conversion course. Degrees that this applies to includes the following: Economics, building or construction, geography, civil or structural engineering, mathematics, project management ( construction) as well as urban and land studies.

 

Typically, the post graduate course will take about a year to complete ( on a full time basis), whereas it takes about 2 years on a part time basis. What’s more? There are some employers that will recruit some graduates as “non-cognates ( meaning those with a non RICS accredited degrees ) and support them financially through the accredited post graduate course. Furthermore, you can as well take a RICS accredited degree apprenticeship whether undergraduate, PGDip or Masters, in quantity surveying as well as project management that combines work with part time study at a university.

 

However, if you’re without a degree, there’s still an option. Simply start work as a technical surveyor ( also referred to as surveying technician ) and then apply for a part time study while working to qualify as a quantity surveyor.

Placholder Image

Other Top Projects in Ballymena

Are you a surveyor in Ballymena?

We can help you get more Quantity surveyors work and boost your business.

Join today