Stud Wall/Plasterboarding in Kidlington

Discover Stud Wall/Plasterboarding Prices in Kidlington

Home > Plastering & Ceilings Projects > Plasterboard dry lining > Kidlington

Stud Wall/Plasterboarding in Kidlington

Internal or partition walls can be moved or knocked down in your house, which can alter the area layout and establish a larger open plan room design for a big living area or a kitchen diner. When relocating or knocking through interior walls, it is necessary to understand both the type of internal wall that it is, and whether or not it's a load bearing wall. Internal walls might be brick or block partitions, timber stud partitions, or even prefabricated wall panels. There are no shortcuts when it comes to ascertaining whether a wall is load bearing or not, it's always worth engaging the services of a structural engineer if you are unclear or cannot view original plans for your premises. Load bearing walls can be moved, but this is generally more costly and involves adding additional load bearing methods, like steel lintels. Moving or knocking through internal walls will often entail demolition of the pre-existing wall, replacing or restoring the new walls, replastering and moving electrics. It may also necessitate changes to the floor, as sometimes the floors between rooms may not be completely level, and knocking through internal walls can expose this. Generally moving internal walls will not require planning permission, but you'll need to comply with building regulations for insulation and sound proofing. Consulting a structural engineer will ensure that any interior wall changes that you intend on doing will keep your property structurally sound.

Average Plasterboard dry lining cost in Kidlington

The average cost of Plasterboard dry lining is £850. Costs vary based upon the materials and the tradesman hired. The upper price range can be as high as £977.5. The material costs are in most cases around £212.5

Average price per Plasterboard dry lining job in 2024

Avg. price low

Avg. price low
£638

Avg. price

Avg. price
£850

Avg. price high

Avg. price high
£978

£1100

£825

£550

£275

£0

Prices based on actual Plasterboard dry lining costs for Kidlington, as reported by local LeadsDoWork members.

Plasterboard dry lining installation cost in Kidlington 2024

Labour cost £595
Material cost £213
Waste removal £43
Time frame: 1-2 days

Plasterboard dry lining searches in September 2024

Plasterboard dry lining Projects in Kidlington in August 2024

550

Requests for quotations in Kidlington in August 2024

0

Requests for Plasterboard dry lining quotations in Kidlington in August 2024. 0% change from July 2024.

0

Requests for Plasterboard dry lining quotations in Oxfordshire in August 2024. 0% change from July 2024.

Source: Numbers calculated based on the search volumes in major search engines

Plasterboard dry lining searches in cities and towns near Kidlington August 2024

Kidlington

Kidlington is a sizeable village and civil parish between the River Cherwell and the Oxford Canal. It is around 5 miles (8 kilometres) north of Oxford and 7.5 miles (12 km) southwest of Bicester. The settlement detailed in the Domesday Book of 1086 evolved from an ancient village nearby to the church. Prior to the Enclosure acts of 1818, a sizeable segment south of the village was unenclosed common land, and the village was extensively referred to as Kidlington-on-the-Green. In accordance with the 2011 Census, the village has a permanent resident population of 13723. This makes it a serious contestant for the largest village in England. Kidlington locals have regularly withstood proposals to become a town, although it gets approved for such status against any criteria. Following a peremptory change by the Parish Council to Town status, the change was voted down in a ballot of the local electorate by 98 percent, and subsequently reversed. There countless opportunities to participate in social, cultural and leisure activities in the village. Kidlington is home to around 50 shops, both independent and commercial chain stores, banks and building societies, a public library, a sizeable village hall and a weekly market. In addition to this, there are seven pubs, 2 cafes, and four eateries. The public houses are concentrated along the dual carriageway that runs through the village, that include the Highwayman Hotel, the Black Horse, the Black Bull, the Red Lion, in addition to the King's Arms in the Moors, and the Six Bells in Mill Street. The Squire Bassett was turned into a Nepalese eatery and relabelled the Gurkha Village in 2012. For all of your house upgrades, make sure to make use of trusted contractors in Kidlington to make certain of quality.

Looking for Plasterboard dry lining in Kidlington?

Get free quotes from local builders

Get free quotes

How it works

Tell us about your Plasterboard dry lining project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Kidlington

Get free, no-obligation quotes from 4 verified Builders working in Kidlington.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

Placholder Image

Other Top Projects in Kidlington

Are you a builder in Kidlington?

We can help you get more Plasterboard dry lining work and boost your business.

Join today