Stud Wall/Plasterboarding in Bedford

Request Stud Wall/Plasterboarding Prices in Bedford

Home > Plastering & Ceilings Projects > Plasterboard dry lining > Bedford

Stud Wall/Plasterboarding in Bedford

Internal or partition walls can be moved or knocked through in your home, which can adjust the room layout and establish a larger open plan room design for a big living space or a kitchen diner. When moving or knocking through interior walls, it's important to understand both the type of interior wall that it is, and whether it's a load bearing wall. Internal walls can be brick or block partitions, timber stud partitions, or even prefabricated wall panels. There are no shortcuts when it comes to deciding whether a wall is load bearing or not, it's always worth engaging the services of a structural engineer if you are not sure or are not able to view original plans for your property. Load bearing walls can be moved, but this is generally more expensive and involves using additional load bearing methods, like steel lintels. Moving or knocking through internal walls will generally require demolition of the existing wall, rebuilding or restoring the new walls, replastering and moving electrics. It may additionally require alterations to the floor, as occasionally the floors between rooms are not completely level, and knocking through internal walls can expose this. Generally moving interior walls will not require planning permission, but you will need to conform to building regulations for insulation and sound proofing. Consulting with a structural engineer will ensure that any interior wall changes that you plan on doing will keep your property structurally sound.

Average Plasterboard dry lining cost in Bedford

The average cost of Plasterboard dry lining is £850. Costs vary based upon the materials and the tradesman hired. The upper price range can be as high as £977.5. The material costs are in most cases around £212.5

Average price per Plasterboard dry lining job in 2024

Avg. price low

Avg. price low
£638

Avg. price

Avg. price
£850

Avg. price high

Avg. price high
£978

£1100

£825

£550

£275

£0

Prices based on actual Plasterboard dry lining costs for Bedford, as reported by local LeadsDoWork members.

Plasterboard dry lining installation cost in Bedford 2024

Labour cost £595
Material cost £213
Waste removal £43
Time frame: 1-2 days

Plasterboard dry lining searches in November 2024

Plasterboard dry lining Projects in Bedford in October 2024

2,744

Requests for quotations in Bedford in October 2024

0

Requests for Plasterboard dry lining quotations in Bedford in October 2024. 0% change from September 2024.

0

Requests for Plasterboard dry lining quotations in Bedfordshire in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Plasterboard dry lining searches in cities and towns near Bedford October 2024

Bedford

Bedfordshire's county town in the East of England features a population of 80,000 and a greater borough populace of 153,000. Bedford is the administrative centre for the Borough of Bedford and is home to the biggest Italian community in the United Kingdom. With a range of house enhancements essential for properties in Bedfordshire, ensure that you use vetted and respectable experts for the greatest prices from Bedford companies.

Looking for Plasterboard dry lining in Bedford?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Plasterboard dry lining in Bedford

07 Jul

Interior work | Stud Walls

Bedford - MK40

Enquiry from: Khayber H

Start Date: Immediate

Stud Partitions to be put up at HMP Bedford

Post a similar request >

21 Apr

Interior work | Stud Walls

Bedford - MK43

Enquiry from: Phill R

Start Date: Immediate

plaster board ceiling in garage are you the property owner: owner of the property property type: semi detached how many different rooms are you looking to have wall work on: 1-2 rooms what level of se...

Post a similar request >

09 Jul

Interior work | Stud Walls

Milton Keynes - MK9

Enquiry from: Paul J

Start Date: Immediate

Office stud wall partition work

Post a similar request >

17 Oct

Interior work | Stud Walls

Milton Keynes - MK6

Enquiry from: ANDREAS H

Start Date: Immediate

About 8 m channel drain along the backwall in the backgarden and connect to roof gutter drain left and right Are you the property owner: Owner of the property Property Type: Semi detached

Post a similar request >

20 Jul

Interior work | Stud Walls

Milton Keynes - MK15

Enquiry from: Diana P

Start Date: Immediate

I need wall plastering for painting and tiling Are you the property owner: Owner of the property Property Type: Detached What level of service do you require: Plaster work only Time scale: Immediate...

Post a similar request >

How it works

Tell us about your Plasterboard dry lining project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Bedford

Get free, no-obligation quotes from 4 verified Builders working in Bedford.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

Placholder Image

Other Top Projects in Bedford

Are you a builder in Bedford?

We can help you get more Plasterboard dry lining work and boost your business.

Join today