Sunroom in Warlingham

Obtain Sunroom Prices in Warlingham

Home > Conservatories Projects > Sunroom > Warlingham

Sunroom in Warlingham

It has become increasingly expensive to move home. Take into account each of the payments and fees for relocating. There are the estate agents, solicitors and then stamp duty, that may quickly set you back thousands of pounds.

As such, enhancing the property instead has become a lot more popularly in this country. Why squander money on relocating when you could add value to your own house. And extensions have turned out to be one of the better ways to do just this.

You could consider making use of some wasted space in your house like the loft or basement and concentrate on a conversion. But extensions are a more appealing alternative for a lot of reasons. Sunrooms are similar to conservatories, with plenty of natural light flooding into the extension thanks to big glass panes.

Average Sunroom cost in Warlingham

The regular cost of Sunroom is £20000. Costs can change based upon the materials and the firm picked. The upper price range can be as high as £23000. The material costs are quite often about £5000

Average price per Sunroom job in 2024

Avg. price low

Avg. price low
£17,500

Avg. price

Avg. price
£35,000

Avg. price high

Avg. price high
£51,500

£52000

£39000

£26000

£13000

£0

Prices based on actual Sunroom costs for Warlingham, as reported by local LeadsDoWork members.

Sunroom installation cost in Warlingham 2024

Labour cost £14,000
Material cost £5,000
Waste removal £1,000
Time frame: 3-5 days

Sunroom searches in September 2024

Sunroom Projects in Warlingham in August 2024

527

Requests for quotations in Warlingham in August 2024

1

Requests for Sunroom quotations in Warlingham in August 2024. 0% change from July 2024.

171

Requests for Sunroom quotations in Surrey in August 2024. -31% change from July 2024.

We recorded 527 requests for house improvement prices in Warlingham. Of these price requests the amount of sunrooms (type: modern sunrooms, conservatories, orangeries etc...) was 1. Quotatis had the ability to match up these consumers with up to four suitable experts that were available for work in Warlingham at that time.

Source: Numbers calculated based on the search volumes in major search engines

Sunroom searches in cities and towns near Warlingham August 2024

10

Requests for quotations in Croydon in August 2024

8

Requests for quotations in South Croydon in August 2024

6

Requests for quotations in Mitcham in August 2024

6

Requests for quotations in Thornton Heath in August 2024

5

Requests for quotations in Coulsdon in August 2024

Warlingham

Warlingham is a town in the Tandridge district of Surrey, England, 14.2 miles (22.9 km) south of the centre of London and 22.3 miles (35.9 kilometres) eastern of the county town, Guildford. Warlingham is the centre of a civil parish that includes Hamsey Green, an adjoining, smaller sized negotiation to the north. Caterham is the local community, 2.0 miles (3.2 km) to the southwest. The name suggests the home(stead) (-ham) of the fans (-(l)ing) of Waer(l)a. The letters "ae" here are the implied earlier spelling of any Anglo-Saxon scribes to signify the noises, which when Norman scribes replaced them was changed with "a" as in today's orthography. No trace of a regional Warra or Warla has been located in Norman messages (after 1066), nor of a Waera or Waera in Anglo-Saxon texts (before 1066). It is a guy's name of the period which has a comparator in Warrington. Today, most of Warlingham's working-age population works in Croydon or main London, making Warlingham part of the London traveler belt.

Looking for Sunroom in Warlingham?

Get free quotes from local conservatory installers

Get free quotes

Similar Customer Enquiries for Sunroom in Warlingham

04 Feb

Orangery | Supply and Install

Warlingham - CR6

Enquiry from: Neale H

Start Date: Immediate

orangery we are looking to extend our lounge out into our back garden by adding an orangery. dimensions approx 11ft ***. are you the property owner: owner of the property what conservatory are you lo...

Post a similar request >

05 Oct

Orangery | Supply and Install

Warlingham - CR6

Enquiry from: Edward P

Start Date: 1 to 3 months

Homeowner Supplied and fitted Please contact to appoint

Post a similar request >

05 Feb

Orangery | Supply and Install

Warlingham - CR6

Enquiry from: Gill R

Start Date: 1 to 3 months

Are you the property owner: Owner of the property What level of service do you require: Design and Install Are you looking at Orangeries built from brick and: PVCu Do you require a base: Yes Enqui...

Post a similar request >

09 Mar

Orangery | Supply and Install

Lingfield - RH7

Enquiry from: Sharon R

Start Date: Immediate

I am looking for a small orangerie

Post a similar request >

26 Oct

Orangery | Supply and Install

Crawley - RH10

Enquiry from: Dalbhanjan A

Start Date: Immediate

Garage extension and conversion

Post a similar request >

25 Apr

Orangery | Supply and Install

Sevenoaks - TN13

Enquiry from: Ian I

Start Date: Immediate

replacement of existing conservatory with single story orangery. internal dimensions 7 5m x 3m. will require new foundations, removal of external wall and placement of beam over. are you the property ...

Post a similar request >

12 Feb

Orangery | Supply and Install

Oxted - RH8

Enquiry from: Stuart M

Start Date: Immediate

15m2 orangery maybe with bifold doors are you the property owner: owner of the property what conservatory are you looking for: orangery what conservatory are you looking for: orangery, upvc conservato...

Post a similar request >

23 Oct

Orangery | Supply and Install

Horley - RH6

Enquiry from: Brian H

Start Date: Immediate

Would like a quotation for a conservatory please

Post a similar request >

03 Mar

Orangery | Supply and Install

Redhill - RH1

Enquiry from: Malcolm S

Start Date: Immediate

Are you the home owner of that property? YES Are you replacing an existing conservatory or is this a new build? New Build Do you know which style of conservatory you want? Orangery - bi-fold doors and...

Post a similar request >

21 Feb

Orangery | Supply and Install

Horley - RH6

Enquiry from: Grace M

Start Date: Immediate

In need of replacing two conservatories. One larger than the other. Looking for ones that can be used all year so double glazed and insulated Are you the property owner: Owner What level of service do...

Post a similar request >

28 Sep

Orangery | Supply and Install

Oxted - RH8

Enquiry from: Jane F

Start Date: Immediate

Home Owner Supplied and Fitted Call to Appoint

Post a similar request >

19 Sep

Orangery | Supply and Install

Betchworth - RH3

Enquiry from: Lynsey G

Start Date: 1 to 3 months

Homeowner Supplied and fitted Please contact to appoint

Post a similar request >

11 Sep

Orangery | Supply and Install

Crawley - RH10

Enquiry from: Clare B

Start Date: 1 to 3 months

Homeowner Supplied and fitted Please contact to appoint

Post a similar request >

17 Jan

Orangery | Supply and Install

Horley - RH6

Enquiry from: Dale B

Start Date: 3+ months

What kind of work are you looking to do? Conservatories and Orangeries More precisely, is it about a conservatory or an orangery ? Orangery So, which material would you like for your orangery? UPVC *...

Post a similar request >

07 Jan

Orangery | Supply and Install

Oxted - RH8

Enquiry from: James W

Start Date: Immediate

3m x 5m Double doors 2 x PVC windows Roof lantern

Post a similar request >

07 Jan

Orangery | Supply and Install

Horley - RH6

Enquiry from: Dale B

Start Date: 3+ months

What kind of work are you looking to do? Conservatories and Orangeries More precisely, is it about a conservatory or an orangery ? Orangery So, which material would you like for your orangery? UPVC I...

Post a similar request >

26 Aug

Orangery | Supply and Install

Oxted - RH8

Enquiry from: Rachel H

Start Date: 1 to 3 months

We would like an orangerie. Are you the property owner: Owner of the property What conservatory are you looking for: Orangery Do you require a base: Yes Time scale: 1-3 months Please call to appoint

Post a similar request >

08 May

Orangery | Supply and Install

Crawley - RH11

Enquiry from: Ngoni C

Start Date: Immediate

25 Apr

Orangery | Supply and Install

Redhill - RH1

Enquiry from: Selina W

Start Date: 1 to 3 months

Organgery move drain to drive and fit ne kitchen in old kitchen and dining room Time scale: 1-3 months Please call to appoint

Post a similar request >

12 Feb

Orangery | Supply and Install

Crawley - RH10

Enquiry from: Jay M

Start Date: 1 to 3 months

New conservatory Are you the property owner: Owner of the property Do you require a base: Yes Would you consider an easy payment plan: Yes Do you have a good credit history: Yes Time scale: 1-3 months...

Post a similar request >

How it works

Tell us about your Sunroom project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Conservatory Installers in Warlingham

Get free, no-obligation quotes from 4 verified Conservatory Installers working in Warlingham.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

how much does an orangery cost?

After being in the shadows of conservatories for so long, Orangeries are now pulling a great comeback into the scenes. They were quite popular back in the 17th and 18th century, but went into the drawers with the advent of conservatories. In recent times, Orangeries are now becoming more and more popular with several homeowners now looking to have one constructed in their homes.

Like many other home improvements or extensions, orangery prices can vary based on a number of factors. However, you can expect to incur within the range of £15,000 to £20,000 for a basic orangery design and build. If you wish to build orangeries with more distinctive features, this price can jump up to £50,000 or more depending on your preferences. Generally, orangeries are more likely to be a bit cheaper when compared to their conventional extension counterparts and add more value to your home than a conservatory in terms of a resale.

For the best results, it’s advisable to investing good money to ensure a solid build and save money in the fittings. Do not look to cut costs by going for cheaper building materials like poor quality vines. Generally, interior design will always depreciate in value, but its the solid structure that command great value for resale purposes. Also, when the structure is solid and of a great quality, you’ll get to save a lot of repair money down the line as the cheaper frames will always give way with time. However, if you have the money, you can also consider spending huge bucks on both the structure as well as the fittings because its only through this you truly maximize the benefits from your orangery. When the fittings are of great quality, repairs won’t come often which ultimately saves you some money as well.

how to build an orangery?

Are you considering extending your living space into a visually appealing orangery? However, before you go ahead with the project, you may want to know exactly what you’re getting yourself into. It is rather important to let you know calling on a seasoned professional for help when it comes to building an orangery is the best bet especially if you lack proper training or experience. This way, you get to avoid costly errors while also saving yourself some time and money. Here, we’ll give you the needed information on how to go about building an orangery.

• Orangery Planning

This is, perhaps, the most important step when it comes to orangery building. There is a need to conduct a proper planning to ensure everything goes right and exactly the way you want it. The first thing to do is to perform the required planning permission checks to determine whether or not your orangery covered under the “permitted development. In some areas, there may be some strict restrictions as the structure’s size. So you just might want to consult your local planning development before taking any step forward.

You can contact any architect for help with the acquisition of the right planning permission. While doing this, also have it in mind that your plans will need to be approved before you can proceed. Once done, it can be very challenge to alter the plans without extra delays or additional costs.

• Construction of Orangery

Do you have any builder in mind? If yes, make sure you inform your architect to be sure he’s happy to work with them. The selected builder will take your plan and build the orangery to your taste as given in the plan. The fitter will put the doors and windows in place as well as the roof lantern.

do i need building regs for an orangery?

Generally, if you want to do a job, you can as well ensure that’s done properly. You may be considering building a small base for an orangery, but no matter how small it is, it just shouldn’t be done to any other than a compliant standard, and that’s whether or not an approval is needed. When it comes to building work which is covered by Building Regulations, you are required to comply (by the law) with the regulations and to make use of one of the two types of Building Control Service available. These includes the Building Control Service given by your local authority or the Building Control Service given by approved inspectors.

Regardless of the service you opt for, you’re going to pay but the preferred service may offer an advice before commencement of the project. The individual carrying out the building work is charged with the responsibility of ensuring total compliance with the regulations. Therefore, if you select to undertake the project by yourself, the responsibility is primarily on you. In the same vein, if you opt for a building company the responsibility would be the company’s, but you should always ensure to confirm this position before commencement of the project. You must also take note that you may be served with an enforcement notice if you fail to comply with the regulations as the owner of the building. So it’s advisable that you choose your builder very carefully.

There are a bunch of elements you may require approval for like the structural integrity, appropriate insulation levels, or the construction of a building over drainage or sewage. In cases where it’s obvious that you’d need building regulations, you can simply submit the building and planning application together at once.

do you need planning permission for an orangery?

With the ability of orangeries to create additional space in your home as well as altering the appearance of your property completely, it’s very likely you’ll require a planning permission to construct an orangery. However, with the lengthy and complicated application process, you might want to consider the few exemptions before getting started.

If you’re considering to build an home extension such as an orangery, the obvious first step would be to consider whether or not you’ll need planning permission. And while you tend to get carried away in the thought of adding new beautiful living space, you should never forget to take into account your area’s planning regulation as well as the planning process realities. However, the application process is not one of the most exciting activities any homeowner would like to pass through and even more so when they live in a conservation area or possess a listed property that can even make the process a lot more challenging.

It’s recommended that you consult your plans and ideas with a professional such as an architect, building design company or a chartered surveyor, but there are some options you can put into consideration if you want to avoid the applying for a planning permission.

If you’re sure about not wanting to apply for a planning permission, you’d have to check your area to identify the possible local planning implications and determine whether or not your home has permitted development right which allows for some building works that can be made without the need to apply for a planning permission. To do this, simply check the government’s planning portal to determine whether your project is covered by the permitted development rights or applying for a planning permission would be required. What’s more? You need to determine if your building is listed especially if you live in a period property. For listed building, it can be much more difficult to get a planning permission as you must comply with some very specific regulations.

Placholder Image

Other Top Projects in Warlingham

Are you a conservatory installer in Warlingham?

We can help you get more Sunroom work and boost your business.

Join today