Biomass Boiler in Aberargie

Request Biomass Boiler Prices in Aberargie

Home > Renewable Energy Projects > Biomass boilers > Aberargie

Average Biomass boilers cost in Aberargie

The regular cost of Biomass boilers is £10000. Costs can change based upon the materials and the organisation hired. The upper price range can be as high as £11500. The material costs are in general about £2500

Average price per Biomass boilers job in 2024

Avg. price low

Avg. price low
£7,500

Avg. price

Avg. price
£10,000

Avg. price high

Avg. price high
£11,500

£12000

£9000

£6000

£3000

£0

Prices based on actual Biomass boilers costs for Aberargie, as reported by local LeadsDoWork members.

Biomass boilers installation cost in Aberargie 2024

Labour cost £7,000
Material cost £2,500
Waste removal £500
Time frame: 1-3 days

Biomass boilers searches in December 2024

Biomass boilers Projects in Aberargie in November 2024

0

Requests for quotations in Aberargie in November 2024

0

Requests for Biomass boilers quotations in Aberargie in November 2024. 0% change from October 2024.

4

Requests for Biomass boilers quotations in Kinross-shire in November 2024. 0% change from October 2024.

Source: Numbers calculated based on the search volumes in major search engines

Biomass boilers searches in cities and towns near Aberargie November 2024

20

Requests for quotations in Perth in November 2024

19

Requests for quotations in Corrour in November 2024

10

Requests for quotations in Fort William in November 2024

8

Requests for quotations in Glenfinnan in November 2024

5

Requests for quotations in Blairgowrie in November 2024

Aberargie

Aberargie is a village in the south east of Perth and Kinross, Scotland. It sits on the western edge of the old Abernethy Parish along the River Farg, which is where it derives its name from. Aberargie is around 1.6 miles west of Abernethy and 2.2 miles south-east of Bridge of Earn.

Aberargie has been around since at least 460AD, as this was when the Pictish Chronicle recorded it as part of Nechtan's land grant. It's highly likely that it has been in existence for a lot longer. Formerly, the community thrived by utilising the River Farg to power water mills for sawing timber and milling flax and meal. The mills stopped producing by the early 20th century and the most complete mill was destroyed in the 1950s.

Archaeologists have found neolithic flints in the village and Scottish Medieval pottery. They have also found flintlock rifle and pistol flints, indicating that there has been a settlement at Aberargie for an extensive amount of time.

If your property in Aberargie needs a new boiler, make sure that you do a comparison of quotations from a minimum of three reputable businesses.

Looking for Biomass boilers in Aberargie?

Get free quotes from local renewable energy specialists

Get free quotes

Biomass boilers pros in Aberargie

MCA Renewables LTD

2 review(s)
Based: in Glasgow, G4 0LD

MCA Renewables have been installing air source heat pumps and biomass boilers all over Scotland for many years. With a wealth of experience we are here to help.

Latest review

Alistair W., KA3
4

Heating | Biomass Boiler in Kilmarnock

Still awaiting the feasibility study

Wood Energy Limited

3 review(s)
Based: in South gloucestershire, GL12 8QH

Latest review

Alistair W., KA3
3

Heating | Biomass Boiler in Kilmarnock

Unsure where contact is coming from. I thinks I am going to see them rather than them coming to see me.

Similar Customer Enquiries for Biomass boilers in Aberargie

25 Jan

Heating | Biomass Boiler

Perth - PH2

Enquiry from: Alan R

Start Date: Immediate

call any time. type of building: semi-detached number of bedrooms: 3 access available for delivery of fuel: yes mains gas available: no how became interested in biomass system: go green quote...

Post a similar request >

25 Nov

Heating | Biomass Boiler

Perth - PH2

Enquiry from: Garry C

Start Date: Immediate

Customer visited the mybiomassprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Hi. Just got my electric bill so now looking for alternatives to heat three r...

Post a similar request >

26 Jan

Heating | Biomass Boiler

Perth - PH2

Enquiry from: Jim M

Start Date: 3+ months

Are you the property owner: Owner How many bedrooms does the property have: 3-4 Do you have any space outside of the property where your biomass boiler will be located: Yes Age of boiler: 6-10 Year...

Post a similar request >

20 Oct

Heating | Biomass Boiler

Perth - PH2

Enquiry from: M

Start Date: 1 to 3 months

Are you the property owner: Owner How many bedrooms does the property have: 3-4 Do you have any space outside of the property where your biomass boiler will be located: Yes Age of boiler: 10+ Yea...

Post a similar request >

11 Oct

Heating | Biomass Boiler

Cupar - KY15

Enquiry from: Elizabeth A

Start Date: Immediate

Call any time. Type of building: Semi-detached Number of bedrooms: 4 Access available for delivery of fuel: Yes How became interested in biomass system: Alternate heating system. Quote requ...

Post a similar request >

27 Apr

Heating | Biomass Boiler

Blairgowrie - PH13

Enquiry from: Donald A

Start Date: Immediate

Biomass servicing and maintenance Are you the property owner: Owner Property Type: Detached How many bedrooms does the property have: 3-4 Do you have any space outside of the property where your biom...

Post a similar request >

05 Dec

Heating | Biomass Boiler

Cupar - KY15

Enquiry from: W

Start Date: Immediate

Pellet boiler 36 kW, which complies with rhi regs Homeowner Supplied and fitted Please contact to appoint

Post a similar request >

28 Nov

Heating | Biomass Boiler

Kinross - KY13

Enquiry from: Edward M

Start Date: 1 to 3 months

Are you the property owner: Owner of the property Property Type: Semi detached How many bedrooms does the property have: 3-4 Is your roof obstructed by: No obstructions What is the direction of the r...

Post a similar request >

01 Dec

Heating | Biomass Boiler

Blairgowrie - PH13

Enquiry from: Callum C

Start Date: 1 to 3 months

Home owner Solid fuel boiler Age of boiler: 0-5 years Biomass boiler required Supplied and Fitted Call To Appoint *

Post a similar request >

10 Nov

Heating | Biomass Boiler

Auchterarder - PH3

Enquiry from: Rob O

Start Date: Immediate

Property type: Detached, Work description: Pellet boiler, approx size 40kw for a EPC calculated load of 70000 kWh / year

Post a similar request >

07 Oct

Heating | Biomass Boiler

Blairgowrie - PH13

Enquiry from: Colin M

Start Date: Immediate

Are you the property owner: Owner of the property End Terrace New Boiler Type: Gas Age of boiler: 10 years + How old is your property: 50 years + Call To Appoint

Post a similar request >

04 Aug

Heating | Biomass Boiler

Blairgowrie - PH13

Enquiry from: Callum C

Start Date: 1 to 3 months

Are you the property owner: Owner of the property New Boiler Type: Oil Age of boiler: 0-5 years Interested in Heating Control System: No How old is your property: 50 years + Call To Appoint

Post a similar request >

21 Jul

Heating | Biomass Boiler

Kinross - KY13

Enquiry from: Alison M

Start Date: Immediate

Home Owner Detached Boiler Age Unknown Supply And Install Call To Appoint House number - 3 Current energy source - Oil Please call her to make an appointment *

Post a similar request >

18 Jul

Heating | Biomass Boiler

Kinross - KY13

Enquiry from: Alison M

Start Date: Immediate

Home Owner Detached Boiler Age Unknown Supply And Install Call To Appoint House number - 3 Current energy source - Oil Please call her to make an appointment *

Post a similar request >

10 Jul

Heating | Biomass Boiler

Cupar - KY15

Enquiry from: Robert B

Start Date: Immediate

home owner Detached Work description: wood chip boiler of about 170000 btu to connect in to existing oil fired system current supply - Oil supply & install time scale - immediate please call to ...

Post a similar request >

25 Jun

Heating | Biomass Boiler

Cupar - KY15

Enquiry from: Sheila J

Start Date: 3+ months

Are you the property owner: Owner Property Type: Semi detached How many bedrooms does the property have: 3-4 Age of boiler: 10+ Years Is your boiler: LPG Time scale: 3-6 months Supplied and fitt...

Post a similar request >

13 Jun

Heating | Biomass Boiler

Perth - PH14

Enquiry from: Andrew J

Start Date: Immediate

Home Owner Detached 4 bedrooms New build property Plans available Completions date is 18 months time and would not be installed until then Please Contact to Appoint *

Post a similar request >

05 Jun

Heating | Biomass Boiler

Perth - PH14

Enquiry from: Dennis B

Start Date: 1 to 3 months

Are you the property owner: Yes What type of property do you live in: Detached How many bedrooms does the property have: 4 How old is your boiler: 10+ Years What fuel does your boiler currently ru...

Post a similar request >

04 Jun

Heating | Biomass Boiler

Kinross - KY13

Enquiry from: D C

Start Date: Immediate

Home owner Detached 3 Bedrooms 2 Bathrooms External wall Space available Not on mains gas Current Boiler 9years old Supplied and Fitted Please call to appoint Immediate *

Post a similar request >

16 Feb

Heating | Biomass Boiler

Perth - PH1

Enquiry from: Mark d

Start Date: Immediate

Home Owner Biomass Detached Supply and Fit Call to Appoint

Post a similar request >

How it works

Tell us about your Biomass boilers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Renewable Energy Specialists in Aberargie

Get free, no-obligation quotes from 4 verified Renewable Energy Specialists working in Aberargie.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Is a biomass boiler compatible with my existing central heating system?

Biomass boilers will work with existing central heating systems, presuming this is not decades old, whether they use radiators or under floor heating. A surveyor will check the existing system you have in place before quoting for or recommending a biomass boiler to you.

Do biomass boilers need lots of maintenance?

Biomass boilers do require some maintenance. Many manufacturers recommend servicing twice a year, although this is often included in the installation cost. Many systems have automatic fuel loading that removes the need to manually load fuel. You will need to remove the ash from the boiler, but this is as easy as emptying a vacuum cleaner.

Can I use a biomass boiler with other forms of heating?

Biomass boilers can be designed to work with other kinds of heating. The most common of these is solar thermal. This is a popular renewable energy pairing. Solar thermal heating will meet your hot water needs during the summer while a biomass boiler can operate as a backup during the winter when solar thermal panels do not perform as well.

Do biomass boilers take up lots of space?

Many domestic biomass boilers are no bigger than a standard gas boiler. However, they do require a flue, a feeder and a space to store the fuel. These can be designed to suit many different properties and will fit in lots of homes or a garage or outbuilding.

Placholder Image

Other Top Projects in Aberargie

Are you a renewable energy specialist in Aberargie?

We can help you get more Biomass boilers work and boost your business.

Join today